Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹76.0 Laccepted-aoc | ₹76.0 L | accepted-aoc |
Tender Value
₹72.5 L
EMD Value
₹72,500
Closing Date
21 Mar 2025, 9:30 pmClosed
Public Works Department
Technical Assistant
Construction of Box culvert at km 3.72 on Road from SH-63 to join Agasanur Road (MDR) in Siruguppa taluk under 5054-District and Other Roads Bridges (RESERVE-SC Category)
PWD/2024-25/BG/WORK_INDENT19472/CALL-2
PWD/2024-25/BG/WORK_INDENT19472/CALL-2
Reserved
Bridges
Two Tender Document System(Two Cover)
PWD Division Office Ballari
7 documents required · 7 mandatory
To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 - achieved in at least one financial year a minimum annual financial turnover (in all classes of Civil Engineering Construction Works only) of Rs.72.46 Lakhs.
To qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, satisfactorily completed as prime contractor, at least one Civil construction work of value not less than Rs.18.12 Lakhs.
To qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 had executed in any one year (Continuous period of 12 months), the following minimum quantities items of work (a)Earthwork Excavation/Formation of Road Embankment/Sub-grade/sub-base - 821.00 Cum (b) PCC/RCC - 219.00 cum (c) Steel Reinforcement - 10.00 MT
Liquid Assets and /or availability of credit facilities of no less than Rs.21.74 Lakhs (Credit Lines/letter of credit/ certificates from any Nationalized/Scheduled Banks for meeting the fund requirement etc.
Copy of Registration for having registered in KPWD under Class-III category
Detailed information on committed offers of works on hand and ongoing works which are yet to be completed
Detailed information of the works for which Tenderer has submitted his tender in different departments either Central or State Government.
₹1,820
₹72,500
21 Mar 2025
13 Mar 2025
24 Mar 2025
18 Mar 2025
Construction of Box culvert at km 3.72 on SH-63 to Agasanur Road (MDR) Siruguppa Taluk ballari District.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever nec...
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete,wood work, steel work, including T&P and scaffolding wherever
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Excavation and removal of silt and silt mixed with sand from canal bedby manual means including disposing off
the same in spoil bank oron the canal embankment in layers as directed with all other an...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-char...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
9a Appendix I Additionalities for Formwork, Centering & Scaffolding -SI.No.8-head walls 8% (volume-1 Pg No:112) For Toe Walls
---- including cost of all materials, with all lead and lifts, load...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
11a Appendix I Additionalities for Formwork, Centering & Scaffolding -Bridges-For Depth of Key Slab
---- including cost of all materials, with all lead and lifts, loading and un-loading charges...
Curtain wall complete as per drawing and Technical specification Cement concrete Grade M15 2507.2
---- including cost of all materials, with all lead and lifts, loading and un-loading charges, ...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
14a Appendix I Additionalities for Formwork, Centering & Scaffolding -Bridges-SI.No.6-Box Culvert 20% ((volume-1 Pg No:112)
---- including cost of all materials, with all lead and lifts, loadi...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
16a Appendix I Additionalities for Formwork, Centering & Scaffolding -SI.No.11- Earth Retaining structures 10% (volume-1 Pg No:112) For Retaining Wall
---- including cost of all materials, with...
Provision of an Reinforced cement concrete crash barrier at the bridge deck & approaches to bridge structure, constructed with Reinforced cement concrete with TMT reinforcement conforming to MORT&H sp...
SSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyi...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than ...
Back filling behind abutment, wing wall and return wall
complete including compaction as per drawing and Technical Specification . A Granular material 710.1.4.of IRC:78 &2200
---- including cos...
Granular Sub-Base
A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification 2700 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges...
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) 1500, 1600, 1700 & 2704
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) 2702
---- including cost of all mater...
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towar...
Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying ...
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40kg each complete as per drawing and Technical specification. 2503 ---- includ...
Flexible Apron : Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. 2507.2 ---- including cost of all materials, with all lea...
Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification 2705 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of lab...
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applyin...
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification 2504
---- including cost of all materials, with all lead and lifts, loading ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulde...
Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting
Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade shee...
FOR DIVERSION ROAD Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of ...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Scarifying the existing bituminous road surface to a depth of 50
mm and disposal of scarified material by Mechanical Means using
Hydraulic excavator with in all lifts and lead
---- including cos...
Compacting original ground supporting embankment : Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth o...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading,...
Granular Sub-Base
A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
Wet Mix Macadam (Plant mix method)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), c...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bridgeculvertspecification.pdf
Others - Specifications • 1.80 MB
19472-Bid document KW3 (Reserve).doc
Tender Document • 1.60 MB
2018-19(e) krbs-section 600 - 900.rar
Others - Specifications • 24.16 MB
krbs-facing sheet.rar
Others - Specifications • 0.00 MB
2018-19(a) krbs-foreword.rar
Others - Specifications • 0.01 MB
2018-19(b) krbs-index.rar
Others - Specifications • 0.01 MB
2018-19(c) krbs-detailed index.rar
Others - Specifications • 0.10 MB
2018-19(d) krbs-section 100 - 500.rar
Others - Specifications • 13.33 MB
2018-19(g) krbs-section 2400 - 3100 & appendices 1 - 23.rar
Others - Specifications • 40.88 MB
2018-19(f) krbs-section 1000 - 2300.rar
Others - Specifications • 20.00 MB
eproc_formats(new).xls
Tender Submission Guidelines • 0.11 MB
road specific.pdf
Others - Specifications • 1.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .