| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 CrAccepted-AOC 1391 SECTOR 57 PART II 122003 | GURUGRAM | HARYANA | 122003 | ₹23.5 Cr Quoted ₹23.8 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹25.3 CrRejected-Finance 1804 SECTOR 2 ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹25.3 Cr | L2 | Rejected-Finance REJECTED AS L2 |
| 3 | L3₹26.0 CrRejected-Finance | ₹26.0 Cr | L3 | Rejected-Finance REJECTED AS L3 |
| 4 | L4₹26.0 CrRejected-Finance H NO 74 E STREET NO 11 JAWAHAR NAGAR HISAR HARYANA INDIA PIN NO 125001 | HISAR | HARYANA | 125001 | ₹26.0 Cr | L4 | Rejected-Finance REJECTED AS L4 |
| 5 | L5₹26.1 CrRejected-Finance 1506 SECTOR 16 17 HISAR SECTOR 16 17 HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹26.1 Cr | L5 | Rejected-Finance REJECTED AS L5 |
| Sl No | Description | Qty | Unit | M/s Hisar Construction Company L8 | kartarsinghcontractor L4 | Narender Singh Contractor L2 | MAHENDER SINGH CONTRACTOR L5 | M/s Suraj Construction Company L9 | SHIVA BUILD TECH PRIVATE LIMITED L3 | Sarvodya Infracon Ptd. Ltd. L7 | JS SYNERGIES PRIVATE LIMITED L1 | M/S SKS NIRMAN VAANIJAY PVT LTD L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 30.66 | cum | 1,350 ₹41,391 | 1,090 ₹33,419.40 | 2,500 ₹76,650 | 1,500 ₹45,990 | 1,435 ₹43,997.10 | 1,862 ₹57,088.92 | 1,350 ₹41,391 | 1,192.32 ₹36,556.53 | 1,300 ₹39,858 |
| 2.00 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 38.79 | Sqm | 85 ₹3,297.15 | 75 ₹2,909.25 | 90 ₹3,491.10 | 90 ₹3,491.10 | 87 ₹3,374.73 | 84 ₹3,258.36 | 50 ₹1,939.50 | 72.32 ₹2,805.29 | 80 ₹3,103.20 |
| 3.00 | [11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate] | 1,890 | Sqm | 25 ₹47,250 | 29 ₹54,810 | 80 ₹1.5 L | 45 ₹85,050 | 25 ₹47,250 | 32 ₹60,480 | 20 ₹37,800 | 20 ₹37,800 | 20 ₹37,800 |
| 4.00 | [17.15.1]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material [Through Rate] | 307.5 | cum | 900 ₹2.8 L | 990 ₹3.0 L | 800 ₹2.5 L | 800 ₹2.5 L | 875 ₹2.7 L | 1,060 ₹3.3 L | 700 ₹2.2 L | 650 ₹2.0 L | 800 ₹2.5 L |
| 5.00 | [17.2.3]Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness, as per technical clause 201 of MORTandH specifications. 3. In area of light jungle (By Mechanical Means) [Through Rate] | 6.61 | Hectare | 24,000 ₹1.6 L | 15,000 ₹99,150 | 25,000 ₹1.7 L | 30,000 ₹2.0 L | 24,944 ₹1.6 L | 32,385 ₹2.1 L | 20,000 ₹1.3 L | 20,000 ₹1.3 L | 22,600 ₹1.5 L |
| 6.00 | [17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 3,450 | cum | 1,100 ₹38.0 L | 1,120 ₹38.6 L | 800 ₹27.6 L | 1,100 ₹38.0 L | 1,043 ₹36.0 L | 1,148 ₹39.6 L | 950 ₹32.8 L | 750 ₹25.9 L | 860 ₹29.7 L |
| 7.00 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate] | 384.38 | cum | 1,200 ₹4.6 L | 1,150 ₹4.4 L | 800 ₹3.1 L | 1,000 ₹3.8 L | 992 ₹3.8 L | 1,175 ₹4.5 L | 1,000 ₹3.8 L | 750 ₹2.9 L | 860 ₹3.3 L |
| 8.00 | [17.25.1]Prime Coat @ 0.85kg per sqm 1. Prime Coat @ 0.60kg per sqm Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications [Through Rate] | 24,537.51 | Sqm | 25 ₹6.1 L | 27 ₹6.6 L | 25 ₹6.1 L | 12 ₹2.9 L | 26 ₹6.4 L | 21 ₹5.2 L | 20 ₹4.9 L | 18 ₹4.4 L | 17 ₹4.2 L |
| 9.00 | [17.26.2]Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate] | 6,65,435.01 | Sqm | 14 ₹93.2 L | 11 ₹73.2 L | 10 ₹66.5 L | 10 ₹66.5 L | 15 ₹99.8 L | 11.5 ₹76.5 L | 10 ₹66.5 L | 10 ₹66.5 L | 11 ₹73.2 L |
| 10.00 | [17.31.2]Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note-If bitumen required is more than 5.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] | 13,308.7 | cum | 6,815 ₹9.1 Cr | 6,410 ₹8.5 Cr | 5,700 ₹7.6 Cr | 6,064 ₹8.1 Cr | 7,209 ₹9.6 Cr | 6,300 ₹8.4 Cr | 6,200 ₹8.3 Cr | 5,750 ₹7.7 Cr | 6,100 ₹8.1 Cr |
Tender Value
₹37.7 Cr
EMD Value
₹75.3 L
Closing Date
21 Apr 2025, 5:00 pmClosed
SATYENDER SINGH
PD Rewari
Strengthening of Rewari Dadri road via Berli Kalan upto Kosli from 0.00 to 33.75 in Rewari Distt.
2025_HRY_437401_1
2025A5B2F32B F726 417C 8396 5F2CB11C2A8B648BAR
Open Tender
Civil Works - Roads
270 days
Rewari
ROAD WORK
3 documents required · 3 mandatory
₹20,000
₹75.3 L
Yes
SUPERINTENDING ENGINEER, PWD B AND R REWARI
18 Nov 2025
31 Mar 2025
22 Apr 2025
31 Mar 2025
21 Apr 2025
31 Mar 2025
7 Apr 2025
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 1.54 MB
BOQ.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid