Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹17.4 L+₹48,567.25 (2.87%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | Rejected-Technical DIVISION SHIMLA KASUMPTI SHIMLA 171009 | SHIMLA | HIMACHAL PRADESH | 171009 | - | Rejected-Technical Non Responsive | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive | |
| 5 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹8.7 L
EMD Value
₹17,500
Closing Date
16 Jul 2020, 5:00 pmClosed
EE CHOPAL
HPPWD CHOPAL
Formation Cutting P/L Cross Drainage works and P/L Soling between Km. 0/0 to 1/0 ) Under SSCCP
2020_PWD_38820_1
PW_CHD_CBE9/2020-2484-2534 dt 09-07-2020
Open Tender
Civil Works - Roads
Item Rate
60 days
CHOPAL
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
EE CHOPAL
₹17,500
27 Oct 2021
10 Jul 2020
18 Jul 2020
10 Jul 2020
16 Jul 2020
10 Jul 2020
Amount
Excavation in earth work in hilly area all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge, in conformity with the requirement of technical specification for Rural Roads clause 1600 and 300, 8.3 (ii)(iv)(v) to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut material in specified manner, trimming, filling of uneven ness, blind age and finishing of the road to specified dimensions or as directed by the Engineer-in-charge for smooth riding. At least 550.43 only cubic metre useful stone shall be recovered from the contractor in each running bill as per pro-rata basis if fails recovery @ Rs. 170/- (Rupees one hundred seventy) per cum will be made. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases.
HP PWD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .