| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹15.2 L+₹9,872.98 (0.66%)Rejected-Finance | L2 | Rejected-Finance Committee Decision |
Tender Value
₹15.1 L
EMD Value
₹17,000
Closing Date
15 Jul 2022, 3:00 pmClosed
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Complex, Virudhunagar
Providing Grey water management structures and water supply work to nursery - 12 nos. in AGAMT-II-2021-22 Village panchayats of Vembakottai Block in Virudhunagar District in Package no.VMK-5.
2022_RDTN_237316_56
C9/5832/2021 dated 18.06.2022
Open Tender
Civil Works
Works
180 days
Vembakottai Block
Two Cover System. Refer tender document.
5 documents required · 5 mandatory
₹0
₹17,000
DRDA, Collectorate Complex, Virudhunagar
16 Sept 2022
29 Jun 2022
15 Jul 2022
29 Jun 2022
15 Jul 2022
6 Jul 2022
6 Jul 2022
Amount
Part-1:- Providing Vertical Filter near Kaliyamman kovil
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete.
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 40mm metal as per specification
Filling the soak pit with 20mm metal as per specification
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Part-2:- Providing Veritical Filter near Rajeswari House in Bharathinagar at Alangulam panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete.
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 40mm metal as per specification
Filling the soak pit with 20mm metal as per specification
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Part-3:- Providing Horizontal Filter Near Mayana Salai Oodai at Rasapatti village of Alangulam panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of Char Coal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Centering charges for all PCC works etc including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., Complete.
Collection and supply of 40mm HBG Metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supply and delivery of 180mm PVC Pipe
Part-4:- Providing for Horizontal filter at Samidevanpatti village
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of Char Coal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Centering charges for all PCC works etc including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., Complete.
Collection and supply of 40mm HBG Metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supply and delivery of 180mm PVC Pipe
Part-5:- Providing for Horizontal Filter in AD colony at Kottaipatti village
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of Char Coal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Centering charges for all PCC works etc including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., Complete.
Collection and supply of 40mm HBG Metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supply and delivery of 180mm PVC Pipe
Part-6:- Providing for Horizontal Filter in BC colony at Kottaipatti village
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of Char Coal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Centering charges for all PCC works etc including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., Complete.
Collection and supply of 40mm HBG Metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supply and delivery of 180mm PVC Pipe
Part-7:- Providing Horizontal Filter in AD Colony in Puliparaipatti Village Panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of Char Coal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Centering charges for all PCC works etc including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., Complete.
Collection and supply of 40mm HBG Metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supply and delivery of 180mm PVC Pipe
Part-8:- Providing for Horizontal filter at T.Ramalingapurami village
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of Char Coal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Centering charges for all PCC works etc including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., Complete.
Collection and supply of 40mm HBG Metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supply and delivery of 180mm PVC Pipe
Part-9:- Providing Horizontal filter near anganwadi at vembakottai village and Panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of Char Coal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Centering charges for all PCC works etc including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., Complete.
Collection and supply of 40mm HBG Metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supply and delivery of 180mm PVC Pipe
Part-10:- Providing Horizontal filter near police quaters at vembakottai village & Panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of Char Coal and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Centering charges for all PCC works etc including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., Complete.
Collection and supply of 40mm HBG Metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Supply and delivery of 180mm PVC Pipe
Part-11:- Providing watersupply from Existing well to proposed Nursery under MGNREGS at vembakottai village & Panchayat.
charges for condutuon yield test by submersible pumpset
Supply and delivery of submersible pumpset of duty 15LPM x 125 M Head 1.5 HP
Supply and delivery of Panel Board suitable for submersible pumpset
2.5 sq.mm Submersible Cable
32mm HDPE Hose
32mm HDPE Hose collar with glip
Nylon Rope
6'' Bore well cover
32 mm GM Gate Vaule
Labour charges for erection of submersible pumpset
Construction of masonry pedestal for fixing of MS Box and fixing of panel board meter and fuse carrier etc
Earth work excauation in all types of soil for laying of PVC pipe including all charges etc., complete
refilling Excavated earth Inculding all Labour charges etc., complete
Supply and delivery of PVC Pipes 63 mm 4kg/cm2
Laying and jointing of 63mm PVC pipes with lead of 200m lowering into trends laying proper grade and 1km lead
Construction of Tub
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.61
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Part-12:- Providing Vertical Filter near VPSC building at vembakottai village & Panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete.
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 40mm metal as per specification
Filling the soak pit with 20mm metal as per specification
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification.
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SREE BALAJI CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .