| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹28.9 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹30.4 L+₹50,995 (1.71%)Rejected-Finance 245 RAJABPUR RAJABPUR RAJABPUR JYOTIBA PHULE NAGAR UTTAR PRADESH 244236 | AMROHA | UTTAR PRADESH | 244236 | L-2 | Rejected-Finance L-2 | |
| 3 | Rejected-Technical | - | Rejected-Technical PQC not Fulfill |
Tender Value
₹28.3 L
EMD Value
₹56,700
Closing Date
13 Jul 2021, 2:00 pmClosed
Er Sunil Kumar SE OMC-II DTPS Kasimpur Aligarh
Office of the SE OMC-II DTPS Kasimpur Aligarh Mobile No 9415900792
Daily round the clock routine maintenance with respect to both boiler Preventing Breakdown maintenance of Pressure Part of Unit 8 and 9 DTPS Kasimpur
2021_RVUNL_598607_1
STET-10/OMC-II/BMD-I/21-22
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Office of the SE OMC-II DTPS Kasimpur Aligarh
As per Tender Documents
4 documents required · 4 mandatory
₹3,304
SAO CFA and BO HTPS KASIMPUR ALIGARH
₹56,700
7 Aug 2021
24 Jun 2021
15 Jul 2021
24 Jun 2021
13 Jul 2021
24 Jun 2021
24 Jun 2021 - 13 Jul 2021
Amount
Daily round the clock routine maintenance with respect to both boiler of Unit # 8 & 9 ‘D’ TPS
Attending the leakages of water wall tubes in boiler Furnace from down comer / ring header to 50 meter including burner Zone:
Attending tube leakage up to Ist ten H.P. weld joints. (irrespective of number H.P. weld joints in one frequency)
Attending tube leakages for each H.P. weld joints beyond 10Nos. of H.P. weld joint.
Attending the leakages from economizer / LTSH tube
Attending tube leakage up to Ist ten H.P. weld joints.(irrespective of number H.P. weld joints in one frequency
Attending tube leakages for each H.P. weld joints beyond 10Nos. of H.P. weld joint.
Attending the leakages in ceiling super heater tubes situated in furnace top before platen super heater, platen super heater tubes
Attending tube leakage up to Ist ten H.P. weld joints.(irrespective of number H.P. weld joints in one frequency).
Attending tube leakages for each H.P. weld joints beyond 10 Nos. of H.P. weld joint
Attending the leakages in cold reheat & HRH tubes, Arch Tubes, screen tubes, water wall hanger tubes, super heater hanger tubes, final super heater, exit super heater tubes, extended water wall tubes, ceiling super heater tubes beyond platen super heater
Attending tube leakage up to Ist ten H.P. weld joints (irrespective of number H.P. weld joints in one frequency)
Attending tube leakages for each H.P. weld joints beyond 10 Nos. of H.P. weld joint
Attending the leakages from SCW super heater tubes and extended super heater tubes
Attending tube leakage up to Ist ten H.P. weld joints (irrespective of number H.P. weld joints in one frequency)
Attending tube leakages for each H.P. weld joints beyond 10 Nos. of H.P. weld joint
Attending the leakages of hand hole plates of different pressure part header by removing hand hole plates with hand hole cutting equipment, re welding of the same after complete preparations and stress relieving of the same after welding if required. Rates should be quoted on as per jobs basis.
Attending the leakages of header stubs up to Ist ten stubs joints in one frequency of different pressure parts headers of boiler.
Fixing of sky climber in boiler furnace after making proper platform on bottom ash hopper, its operation during execution of the works and dismantling and removal of ash hopper platform after completion of jobs. Rates should be quoted on as per job basis
Removal of damaged clamps / binders /scallop bars etc. and replacement / refitting of the same with new / repaired one in different zones of the pressure parts. The rates should be quoted on as per No. basis as under.
‘U’ Clamps
Scallop bars
Binders, support band, lugs
Flexible Connectors (male / female)
Fabrication of Hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating gas to required temperature of following materials.
Carbon Steel
Alloy Steel
Stitch Welding of fines of water / steam cool wall for securing of respective positions of tubes.
Rectification / replacement of Ash Protector / Shielding / Cassette baffles found damaged / eroded / dislocated or providing new protector in the following pressure part zones ( Rates should be quoted on as per No. basis)
Tubular (half round) protector of platen super heater / Re heater inlet etc and their spacer tubes. Protector /shielding shall be rectified / installed with the help of sky climber
Rectification / replacement of box type protector / cassette baffles found damaged / eroded / dislocated in LTSH / Economizer etc.
Tubular protectors / shielding of water wall hanger tubes / water wall screen tubes / final super heater / LTSH / economizer / re heater etc. Protector / shielding shall be rectified / installed with the help of scaffolding to be erected by agency as per requirements.
Rectification / replacement of box type protector / cassette baffles found damaged / eroded / dislocated of water wall hanger tubes / water wall screen tubes / final super heater / re heater etc. Protector / shielding shall be rectified / installed with the help of scaffolding to be erected by agency as per requirements
Erection of Scaffolding and plate form in the following areas:-
Economizer hopper (above).
S-Panel & bottom ash hopper.
Reheater inlet & outlet.
Water wall screen tube / final super heater / super heater screen tube
Build up of eroded portion of the tubes caused by ash / steam erosion using suitable welding electrodes matching with parent metal composition. Depth of erosion up to 2.5mm, length of erosion up to 250 mm.
Lifting and taking out the complete coils in pair of LTSH horizontal coils (upper or lower ) after cutting clamps supports , clits, stoppers and releasing from subsequent headers and coil & their restoration after placement of coil.
Lifting and taking out the complete coils of Economizer (upper or lower) after cutting clamps supports , clits, stoppers and releasing from subsequent headers and coil & their restoration after placement of coil.
Replacement of eroded / damaged tubes / bends of pressure parts in different zones of boiler during preventive maintenance as per procedure mentioned in annexure of the following
Carbon / low alloy (T-11) joint
High alloy (T-22) joint
Stainless Steel Joint
Shifting of sky climber in boiler furnace at different locations for attending and inspection of various pressure part zones. Rates should be quoted on as per job basis
Cutting and removal of skin casing / high crown plate by grinder and welding the same with suitable electrode by High pressure welding method, after completion of repair jobs of pressure parts if any.
Thickness - up to 15 mm
Thickness - 16mm or above
Replacement of Safety Valve
Replacement of following size valves.
15mm to 25 mm valves.
40mm to 50mm valves.
65mm to 70mm valves
100mm valves
150mm to 200mm valves
U.S.Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .