| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | ₹10.9 L | L1 | Admitted-Finance |
| 2 | L2₹11.0 LAdmitted-Finance | ₹11.0 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GIRI SAHAJANYA PROJECTS L1 | ANNAMALAIYAR CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Construction of Drain from Siranjeevi House to Thangaraj House H/o Kullampatty Work No.01. | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B. | 131.67 | cum | 197.84 ₹26,049.59 | 210.84 ₹27,761.30 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 21.95 | cum | 5,312.98 ₹1.2 L | 5,312.98 ₹1.2 L |
| 4.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 75.24 | cum | 6,064.03 ₹4.6 L | 6,064.03 ₹4.6 L |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical | 509.73 | cum | 547.1 ₹2.8 L | 557.1 ₹2.8 L |
| 6.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 0.08 | cum | 91,858.5 ₹7,348.68 | 91,858.5 ₹7,348.68 |
| 7.00 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 1.58 | cum | 8,923.81 ₹14,099.62 | 8,923.81 ₹14,099.62 |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 94.05 | cum | 282.1 ₹26,531.51 | 282.1 ₹26,531.51 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,66,640 ₹1.7 L | 1,67,866 ₹1.7 L |
Tender Value
₹11.1 L
EMD Value
₹11,050
Closing Date
19 Feb 2026, 3:00 pmClosed
BDP VP Ayothiyapattnam
BDP VP Ayothiyapattnam
Salem District - Ayothiyapattnam Construction of Drain from Siranjeevi House to Thangaraj House H/o Kullampatty in Surplus Fund 2025-2026 Work No.01.
2026_RDTN_657136_1
306/2026/T2
Open Tender
Civil Works
180 days
BDP VP Ayothiyapattnam
As on below
2 documents required · 2 mandatory
₹0
₹11,050
BDP VP Ayothiyapattnam
24 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
13 Feb 2026
Construction of Drain from Siranjeevi House to Thangaraj House H/o Kullampatty Work No.01.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_788072.xls
BOQ • 0.24 MB
01.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid