Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.5 LAccepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹8.0 L+₹45,643 (6.06%)Accepted-Finance 13 1 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 2 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹9,200
Closing Date
3 Mar 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit III Boiler Pressure parts AOH 2021 Maintenance of Burners and replacement of worn out fasteners at cover plates
2021_EB_198746_1
SE / M-I / MTPS-I / BM / OT. 435 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹9,200
Yes
11 Mar 2021
25 Feb 2021
4 Mar 2021
25 Feb 2021
3 Mar 2021
25 Feb 2021
Amount
OVERHAULING OF BURNERS: Removing inner and outer panel door, releasing all reach rods from burner tilt mechanism, dismantling of direct and indirect burner tilt mechanism components for inspection
Inspection, cleaning, rectification and alignment of burner tilt mechanism components like bell crank clevis and drive lever, reassembling after fixing of coal nozzles, etc., with proper lubricants and connecting all reach rods with burner tilt mechanism including fixing of inner panel, outer panel doors (Asbestos tape gaskets and special lubricants will be supplied by board).
OVERHAULING OF COAL COMPARTMENT ASSEMBLY: Transporting of new coal nozzle compartment assembly to work site and old coal nozzle assembly from site to stores. Lorry and crane will be spared by board at free of charge for transporting
Dismantling of old nozzle assembly from its compartment, cleaning and preparing the coal compartment for re-fixing of new coal nozzle
Checking of new coal nozzles and tips for proper aligning of coal nozzles, checking the clearance, rectification if any, fixing of new coal nozzle assembly inside the coal compartment in position and checking the clearance, checking the burner tilt, etc
OVERHAULING OF OIL COMPARTMENT ASSEMBLY: Overhauling of oil gun assembly from stationary union to diffuser after dismantling, cleaning, checking the critical dimension, checking of guide tube assembly and supports, rectifying any damages, re-fixing oil gun assembly, igniter guide tube etc., after overhaul
Removing the oil nozzle tip with reach rod from furnace side after removing the fixing pins, overhauling of nozzle tip and linkages, checking the holes, lubrication of pins, re-fixing of oil nozzle and checking the clearance with wind box
Charges for overhauling of air compartment assembly, work involves removal of air nozzles, reach rods, checking clearance, over hauling and inspection of tip links, pins etc
Painting of burner components and burner zones with red oxide paint, including the cost of paint.
Painting of burner components with heat resistant aluminum paint, including the cost of paint
Charges for removal of the Oil & Atomising steam metallic flexible hoses from the Oil gun station, Oil gun & Scanner cooling rubber hoses etc. and refixing the hoses after completion of the burner maintenance works including the cost of consumables, hire charges for T&P’s etc.
Charges for servicing of Oil & Atomizing Pneumatic Burner trip valve by removal of valve from the line, dismantling the bonnet from the body, inspection of the disc, renewal of disc if required, renewal of the body gasket and refixing
Charges for removal of defective Burner corner end air nozzle tips and reconditioning of eroded portion by patch welding, leading, lifting, and fitting in the burner corner in its position and making proper alignment and operation
Charges for Reconditioning of used & worn-out Inter Air Nozzle Tips work involves the cutting & removal of old splitter plates, grinding and edge preparation, cutting of new SS splitter plates & patch plates for inner cover plates and outer body of square tip including transportation. Fixing of new splitter plates inside the tip and inner cover plate patching in 4 sides checking the alignment
Charges for Reconditioning of used & worn-out oil Nozzle Tips work involves the cutting & removal of old splitter plates, grinding and edge preparation, cutting of new SS splitter plates & patch plates for inner cover plates and outer body of square tip including transportation. Fixing of new splitter plates inside the tip and inner cover plate patching in 4 sides checking the alignment.
Charges for cutting and removal of worn-out deteriorated bolts & nuts in burner corner Nos. 1 to 4 of boiler.
Fixing new bolts & nuts in inner, side and outer cover plates of burner corners inclusive of all consumables.
Spiral wound gasket-winding material SS 304L, Filter material: pure flexible graphite only with outer ring material .CS Size:106x79x5mm With outer ring of size 130x106x3mm
Foam seal sealer 30-45 (Dum Dum Paste).Hy seal 30-45 Dum Dum putty
Materials, T & Ps and consumables as per annexure
KUMAR ERECTORS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .