Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹73.8 CrAdmitted-Finance | ₹73.8 Cr | Admitted-Finance |
| 2 | ₹77.3 CrAdmitted-Finance | ₹77.3 Cr | Admitted-Finance |
| 3 | Rejected-Technical INFINITY THINK TANK TOWER II 10TH FLOOR PLOT NO A3 BLOCK G SECTOR V SALT LAKE CITY KOLKATA 700091 WB | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | Rejected-Technical Technically not qualified |
| Sl No | Description | Qty | Unit | Shyama Power India Limited | M/S KHAGEMBA TRANSMISSION AND CONSTRUCTION |
|---|---|---|---|---|---|
| 1.00Supply Portion | |||||
| 2.00Installation of New Distribution Tansformer 25KVA (203 Nos) | |||||
| 3.00 | 9m Steel Tubular poles (410 SP-31) - (embossing as per design drawing of MSPDCL) | 1 | Nos | 85,76,969.24 ₹85.8 L | 62,28,113.08 ₹62.3 L |
| 4.00 | Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for supporting Transformer | 1 | Set | 17,79,063.58 ₹17.8 L | 19,70,336.27 ₹19.7 L |
| 5.00 | Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2. | 1 | Set | 1,97,380.96 ₹2.0 L | 4,81,714.94 ₹4.8 L |
| 6.00 | Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm | 1 | Set | 17,79,063.58 ₹17.8 L | 19,70,336.27 ₹19.7 L |
| 7.00 | Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2 | 1 | Set | 2,92,238.8 ₹2.9 L | 10,08,739.48 ₹10.1 L |
| 8.00 | Galvanised Channel 75X40,@5.7Kg/m 2.8X2m for HG fuse unit & A.B. switch | 1 | Set | 26,45,479.76 ₹26.5 L | 28,51,187.78 ₹28.5 L |
| 9.00 | Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m. | 1 | Set | 6,07,473.44 ₹6.1 L | 19,16,547.36 ₹19.2 L |
| 10.00 | Galvanised Channel 75X40,@5.7Kg/m 0.5X2m for supporting H.G. fuse main channel X-arm | 1 | Set | 7,39,459.98 ₹7.4 L | 23,93,004.6 ₹23.9 L |
Tender Value
₹68.6 Cr
EMD Value
₹1.4 Cr
Closing Date
21 Feb 2025, 11:00 amClosed
Managing Director, MSPDCL
Secure Office Building, 3rd Floor, A.T. Line, North AOC, Imphal West, Manipur-795001
Electrification of Left Out Households in Churachandpur, Kangpokpi, Pherzawl, Tengnoupal and Senapati District of Manipur under RDSS.
2025_MSPDC_2581_2
2/60(RDSS-AH)ELECT/2024-MSPDCL
Open Tender
Electrical Works
365 days
As per NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹25,000
Managing Director, MSPDCL
₹1.4 Cr
MSPDCL
7 Mar 2025
27 Jan 2025
21 Feb 2025
27 Jan 2025
21 Feb 2025
10 Feb 2025
3 Feb 2025
Supply Portion
Installation of New Distribution Tansformer 25KVA (203 Nos)
9m Steel Tubular poles (410 SP-31) - (embossing as per design drawing of MSPDCL)
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2.8X2m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 0.5X2m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 25 KVA Efficiency level -II(2 star) Amendment No. 4
A.B.Switch (Set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (Set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 31/2 core 120 Sq.mm XLPE insulated cable
Galvanised D.B.box cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (Set of 3 Earthing Pipe)
Danger Plate
11 KV lightening arrestor
Nuts & Bolts with washers ((5/8)" X 3" / 6.5" / 8.5" )
Installation of New Distribution Tansformer 63KVA (48 Nos)
9m Steel Tubular poles (410 SP-31) - (embossing as per design drawing of MSPDCL)
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2.8X2m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 0.5X2m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 63 KVA Efficiency level -II(2 star) Amendment No. 4
A.B.Switch (Set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (Set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 31/2 core 120 Sq.mm XLPE insulated cable
Galvanised D.B.box cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (Set of 3 Earthing Pipe)
Danger Plate
11 KV lightening arrestor
Nuts & Bolts with washers ((5/8)" X 3" / 6.5" / 8.5" )
Installation of New Distribution Tansformer 100 KVA (9 Nos)
9m Steel Tubular poles (410 SP-31) - (embossing as per design drawing of MSPDCL)
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2.8X2m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 0.5X2m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 100 KVA Efficiency level -II(2 star) Amendment No. 4
A.B.Switch (Set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (Set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 31/2 core 120 Sq.mm XLPE insulated cable
Galvanised D.B.box cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (Set of 3 Earthing Pipe)
Danger Plate
11 KV lightening arrestor
Nuts & Bolts with washers ((5/8)" X 3" / 6.5" / 8.5" )
New 11 KV line using ACSR Rabbit (239.05 km)
9m Steel Tubular poles (410 SP-31) - (embossing as per design drawing of MSPDCL)
Galvanised Pole top bracket
Galvanised Clamp for Pole top Bracket
Galvanised Cross arm(75X40)mm
Galvanised Back clamp for X-arm
Galvanised 2.2m D.P. channel X-arm (75X40)mm
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
11 KV Pin Composite/Polymer Insulator (Complete with Pin)
ACSR Conductor (Rabbit)
Stay Set complete with stay wire, base plate, stay rod etc.
Galvanised Stay Clamp
Galvanised Bracing for D.P.structure, 50X50X6mm M.S. Angle
Galvanised Clamp for D.P. Bracing
Galvanised Anti climbing device complete
Earthing set complete with G.I. wire
Guarding at crossing with G.I. wire
Bolts & Nuts with washer (5/8X3"/6.5")
Al. Binding wire, UPG clamps etc.
Danger Plate
Number Plate
New LT line using 3 Phase 4 wire with AB Cable (3X50+1X35) Sq.mm (209.1 km)
8m Steel Tubular poles (410 SP-14) - (embossing as per design drawing of MSPDCL)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards :
AB Cable (3x50+1x35)Sq.mm
Insulation piercing connector suitable for AB Cable Big Size (Main: 16-95 sq.mm, Service: 4-35 (50) sq.mm) (2 Pieces per Set)
Earthing set complete with G.I. wire
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with washer (5/8X3" full thread)
Danger Plate
Number Plate
New LT line using 3 Phase 4 wire with AB Cable (3X35+1X25) Sq.mm (257.55 km)
8m Steel Tubular poles (410 SP-14) - (embossing as per design drawing of MSPDCL)
Galvanised M.S. cross arm (75X40) mm, 510 mm long
Galvanised Back clamp for cross arm
Dead end fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards :
AB Cable (1x35+1x25)Sq.mm
Insulation piercing connector suitable for AB Cable Big Size (Main: 16-95 sq.mm, Service: 4-35 (50) sq.mm) (2 Pieces per Set)
Earthing set complete with G.I. wire
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with washer (5/8X3" full thread)
Danger Plate
Number Plate
Service Connection to Un-electrified households
PVC Insulated Twin Core (unarmoured) cable 4sqmm Cable
16 A Double Pole MCB
Description of Work / Item(s)
Erection Portion
Installation of New Distribution Tansformer 25KVA (203 Nos)
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 25 KVA, Distribution Transformers including erection of DP Structure,DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc., Sundries like Pole Painting (including cost of Enamel Paint), Fixing of Danger Plate, Geo-tagging of Asset and also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings. All other related works (if any) are also considered.
Providing of Sub-Station Earthing (Set of 3 Earthing Pipe) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper crimping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of Distribution Box as per approved drawing and TS
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Installation of New Distribution Tansformer 63KVA (48 Nos)
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 63 KVA, Distribution Transformers including erection of DP Structure,DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc., Sundries like Pole Painting (including cost of Enamel Paint), Fixing of Danger Plate, Geo-tagging of Asset and also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings. All other related works (if any) are also considered.
Providing of Sub-Station Earthing (Set of 3 Earthing Pipe) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper crimping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of Distribution Box as per approved drawing and TS
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Installation of New Distribution Tansformer 100 KVA (9 Nos)
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 100 KVA, Distribution Transformers including erection of DP Structure,DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc., Sundries like Pole Painting (including cost of Enamel Paint), Fixing of Danger Plate, Geo-tagging of Asset and also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings. All other related works (if any) are also considered.
Providing of Sub-Station Earthing (Set of 3 Earthing Pipe) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper crimping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of Distribution Box as per approved drawing and TS
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
New 11 KV line using ACSR Rabbit (239.05 km)
Detailed Route survey for new lines and submission of route profile/alignment etc. all complete
Jungle clearance including tree cutting along the line including trimming, loaping, branching etc as required to maintain staturory electrical clearance as per the direction of Engineer-in-charge
Erection of Single Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Erection of Double Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Fitting & fixing of all line accessories like"Y" cross arms, channels, brackets, danger board, anticlimbing device (including supply of nuts&bolts,etc.) complete as per specification for Single Pole.
Fitting & fixing of all line accessories like cross arm, DP channels, DP cross brackets, all types of clamps,danger board, anticlimbing device etc. complete(including supply of nuts&bolts,GI through bolt,etc) as per specification for Double Pole Structure
Pipe Earthing including fixing of 1mtr long GI pipe in all kinds of soils complete as per approved drawing and Technical Specification 1set/location
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of line (3 wires) including paying out and sagging of conductor, and mid point jointing of ACSR Rabbit conductor, installation of disc/ pin insulator alongwith all necessary hardwares and accessories as per Technical Specification.
New LT line using 3 Phase 4 wire with AB Cable (3X50+1X35) Sq.mm (209.1 km)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification along with Geo-tagging of asset.
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (3x50+1x35 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
New LT line using 3 Phase 4 wire with AB Cable (3X35+1X25) Sq.mm (257.55 km)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification along with Geo-tagging of asset.
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (1x35+1x25 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
Service Connection to Un-electrified households
Installation of service cable from LT Distribution Box/ SMC Distribution Box/ IPC Connection Point upto the Meter Board as per drawing including installation of MCB in consumer premises including supply of 3-way switch board (6A pin and socket) and all other accessories such as screws, clamp and other related items
Description of Work / Item(s)
Supply Portion
Erection Portion
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid