| 1.01Following work are required to be carried out for replacement of gasket & Y-phase Bushing (HV Side) of 132/33 KV 40MVA T/F -I ( BHARAT BIJLI MAKE ) T/F -1 installed at 132 KV S/S Zamania Ghazipur. | |||||
| 1.02 | Carriage of 20 KL oil tank from any S/S under ETC-II Varanasi as per availability to 132KV S/S Zamania with the help of light/heavy Vehicles arranged by the contractor on his own cost | 1 | Job | 18,000 ₹18,000 Lowest | 30,000 ₹30,000 |
| 1.03 | Complete draining out the transformer oil up to required level from existing 40 MVA, 132/33 KV BHARAT BIJLI MAKE T/F -1 into empty oil tank or oil drum including opening of dain valves Approximate 18.50 KL | 18.5 | KL | 195 ₹3,607.5 Lowest | 280 ₹5,180 |
| 1.04 | Carriage of new 145KV HV Bushing within Zone upto distance of 300KM | 1 | NO. | 7,500 ₹7,500 Lowest | 10,000 ₹10,000 |
| 1.05 | Carriage of fresh T/F Oil within Zone upto distance of 200KM (1 KL) | 1 | NO. | 13,000 ₹13,000 | 12,000 ₹12,000 Lowest |
| 1.06 | Shifting of HV bushing (01Nos) from store to near Transformer plinth with the help private crane for replacement of 40MVA .Transformer bushing Y-phase . Work includes testing of new HV bushing before erection then opening of HVside jumpers, dismantling of LA's and dismantling of HV side Y-phase bushings for replacement of new bushings of 40MVA Transformer at 132 KV sub-station Zamania . (Crane shall be arranged by the contractor). | 1 | Job | 12,000 ₹12,000 Lowest | 18,000 ₹18,000 |
| 1.07 | Shifting of HV side Y-phase dismantled bushing from Transformer to store by the help of crane (Crane shall be arranged by the contractor). Erection of new HV side Y-phase bushings including replacement of gasket. (Gasket /Crane shall be arranged by the contractor). Jumpering of HV side bushings, erection of LA's and making ready for energization of Transformer. | 1 | Job | 12,000 ₹12,000 Lowest | 15,000 ₹15,000 |
| 1.08 | Dismantling of HV/LV & Neutral bushing turret from T/F main tank, Radiators, conservator tank, PRV, buccholz relay, oll pipe line. OLTC cap, cooling fans, opening of electrical connection and proper blanking of open space for replacement of gaskets with the help of hydra, and other all associated work to complete the job. | 1 | Job | 24,000 ₹24,000 Lowest | 25,000 ₹25,000 |
| 1.09Providing & Replacement of old & damaged gasket of 40 MVA, 132/33 KV BHARAT BIJLI MAKE T/F-1 as per required size of good quality rubberised cork sheet of new KONIKA / TRABROZE make at follwing place of transformer. | |||||
| 1.10 | Top cover gasket replacing involving the work of opening nutbolts of the top cover plate lifting the cover plate with core and winding by 20 cm) from its present level, cleaning the oil and damaged gaskets and its removal from surface by scraping and cleaning the top surface, fabrication of top
cover gaskets as per top surface made from corksheet. jointing & punching holes, fitting on top surface, fitting the top plate cover and tightening the nut and bolts for proper completion of work | 1 | Job | 46,000 ₹46,000 | 45,000 ₹45,000 Lowest |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
21 Aug 2026, 4:00 pmClosed
SE
400KV S/S Sarnath Varanasi
Work
2026_UPTCL_1170385_2
E-tender No. 04 ETC-II(VNS)/2026-27
Open Tender
Electrical Works
Lump-sum
60 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD GHAZIPUR
₹3,000
24 Sept 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Following work are required to be carried out for replacement of gasket & Y-phase Bushing (HV Side) of 132/33 KV 40MVA T/F -I ( BHARAT BIJLI MAKE ) T/F -1 installed at 132 KV S/S Zamania Ghazipur. | - | - | - | - |
| 1.02 | Carriage of 20 KL oil tank from any S/S under ETC-II Varanasi as per availability to 132KV S/S Zamania with the help of light/heavy Vehicles arranged by the contractor on his own cost | - | Job | - | - |
| 1.03 | Complete draining out the transformer oil up to required level from existing 40 MVA, 132/33 KV BHARAT BIJLI MAKE T/F -1 into empty oil tank or oil drum including opening of dain valves Approximate 18.50 KL | - | KL | - | - |
| 1.04 | Carriage of new 145KV HV Bushing within Zone upto distance of 300KM | - | NO. | - | - |
| 1.05 | Carriage of fresh T/F Oil within Zone upto distance of 200KM (1 KL) | - | NO. | - | - |
| 1.06 | Shifting of HV bushing (01Nos) from store to near Transformer plinth with the help private crane for replacement of 40MVA .Transformer bushing Y-phase . Work includes testing of new HV bushing before erection then opening of HVside jumpers, dismantling of LA's and dismantling of HV side Y-phase bushings for replacement of new bushings of 40MVA Transformer at 132 KV sub-station Zamania . (Crane shall be arranged by the contractor). | - | Job | - | - |
| 1.07 | Shifting of HV side Y-phase dismantled bushing from Transformer to store by the help of crane (Crane shall be arranged by the contractor). Erection of new HV side Y-phase bushings including replacement of gasket. (Gasket /Crane shall be arranged by the contractor). Jumpering of HV side bushings, erection of LA's and making ready for energization of Transformer. | - | Job | - | - |
| 1.08 | Dismantling of HV/LV & Neutral bushing turret from T/F main tank, Radiators, conservator tank, PRV, buccholz relay, oll pipe line. OLTC cap, cooling fans, opening of electrical connection and proper blanking of open space for replacement of gaskets with the help of hydra, and other all associated work to complete the job. | - | Job | - | - |
| 1.09 | Providing & Replacement of old & damaged gasket of 40 MVA, 132/33 KV BHARAT BIJLI MAKE T/F-1 as per required size of good quality rubberised cork sheet of new KONIKA / TRABROZE make at follwing place of transformer. | - | - | - | - |
| 1.1 | Top cover gasket replacing involving the work of opening nutbolts of the top cover plate lifting the cover plate with core and winding by 20 cm) from its present level, cleaning the oil and damaged gaskets and its removal from surface by scraping and cleaning the top surface, fabrication of top
cover gaskets as per top surface made from corksheet. jointing & punching holes, fitting on top surface, fitting the top plate cover and tightening the nut and bolts for proper completion of work | - | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
04Part-1.pdf
Tender Documents • 0.58 MB
BOQ_2211401.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .