| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC 31 17 A4 BLOCK 31 KODIYA VILAI KODUNKULAM MARTHANDAM KANYAKUMARI DIST PIN 629 165 | MARTHANDAM | KANYAKUMARI | TAMIL NADU | 629165 | ₹7.9 L | L1 | Accepted-AOC L1 Tenderer |
| Sl No | Description | Qty | Unit | ELITE POWER CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.01 | Excavation of 9m, 9.14m pole pit on Rocky ground (Hard soil) (1.25m * 0.6m*1.83m) | 22 | Per pit | 22,000 ₹25,960 |
| 2.01 | Erection of 9m, 9.14m pole | 22 | Per pole | 17,600 ₹20,768 |
| 3.01 | Loading and Unloading of 9m PSC pole | 22 | Per pole | 13,200 ₹15,576 |
| 4.01 | Transporting of 9m poles from road side to pole pit upto 2 KM | 22 | Per pole | 17,600 ₹20,768 |
| 5.01 | Excavation of 8m pole pit on Rocky ground (Hard soil) (1.25m * 0.5m*1.5m) | 12 | Per pit | 9,000 ₹10,620 |
| 6.01 | Erection of 8m pole | 12 | Per pole | 6,600 ₹7,788 |
| 7.01 | Loading and Unloading of 8m PSC pole | 12 | Per pole | 4,800 ₹5,664 |
| 8.01 | Transporting of 8m poles from road side to pole pit upto 2 KM | 12 | Per pole | 7,200 ₹8,496 |
| 9.01 | Fixing of HT Pin Insulator | 81 | Per | 8,100 ₹9,558 |
| 10.01 | Fixing of LT Pin Insulator | 48 | Per | 3,600 ₹4,248 |
Tender Value
Refer Docs
EMD Value
₹7,925
Closing Date
3 Feb 2026, 2:00 pmClosed
Superintending Engineer
TNPDCL/Nagercoil
Works Contract for the execution of various works under Kuzhithurai Division
2026_EB_644839_1
KKEDC/ETW-78/2025-26 Dated 19.01.2026
Open Tender
Electrical Works
90 days
Office of the Superintending Engineer
As specified in tender
3 documents required · 3 mandatory
₹0
₹7,925
Yes
13 Mar 2026
20 Jan 2026
4 Feb 2026
20 Jan 2026
3 Feb 2026
20 Jan 2026
20 Jan 2026 - 2 Feb 2026
Excavation of 9m, 9.14m pole pit on Rocky ground (Hard soil) (1.25m * 0.6m*1.83m)
Erection of 9m, 9.14m pole
Loading and Unloading of 9m PSC pole
Transporting of 9m poles from road side to pole pit upto 2 KM
Excavation of 8m pole pit on Rocky ground (Hard soil) (1.25m * 0.5m*1.5m)
Erection of 8m pole
Loading and Unloading of 8m PSC pole
Transporting of 8m poles from road side to pole pit upto 2 KM
Fixing of HT Pin Insulator
Fixing of LT Pin Insulator
Fixing of 11 KV Disc
Fixing of LT Shackle Insulator
Fixing of Aluminium Knob
Fixing of LT Single phase cross arm
Fixing of LT Three phase cross arm
Fixing of V cross arm 3 1/2'
Fixing of HT/LT TI fitting
Fixing of Tapping Channel cross arm 3 1/2'
Dismantling & Re- Fixing of LT Three phase cross arm
Dismantling & Re- Fixing of LT Pin Insulator
Dismantling & Re- Fixing of LT shackle insulator
Dismantling & Re Fixing of Aluminium knob
Dismantling & Re-Fixing of Tapping Channel cross arm 3 1/2'
Dismantling & Re- Fixing of V cross arm 3 1/2'
Dismantling & Re- Fixing of HT/LT TI fitting
Dismantling & Re- Fixing of 11 KV Disc
Dismantling & Re-Fixing of HT Pin Insulator
Excavation of Stay pit on Rocky ground (Hard soil) (1.00m * 0.5m*1.5m)
Erection of Stay set
Dismantling & Re-Erection of Stay Set
Street light switching point arrangement withwire and switch including B type MS Box with painting (Supplied by Contractor)
Dismantling & Re-Fixing of Street Light LED Lamp fitting
Dismantling & Re-Erection of Single Phase Service Connection
Dismantling & Re-Erection of Three Phase Service Connection
Erection of HT 11 KV Lines Stringing, Sagging, Binding for 7/4.09 ACSR Pin point
Dismantling & Re-Erection of HT 11 KV Lines Stringing, Sagging, Binding for 7/4.09 ACSR Pin point
Dismantling & Re-Erection of HT 11 KV Lines Stringing, Sagging, Binding for 7/3.15 and 7/3.35 ACSR Cut point
Dismantling & Re-Erection of LT Lines Stringing, Sagging, Binding for 7/2.59 ACSR & 7/2.50 AAAC Pin point
Transporting of line materials from Sub Store to section office up to 20 KM
Transporting of line materials from section office to work Spot up to 20 KM
Erection of DP structure - Double pole with center Rotating AB Switch
Erection of Single pole Transformer structure without center support
Erection of Single pole Transformer structure with center support
Erection of Double pole Transformer structure
Dismantling of Double pole Transformer structure
Erection of Transformer up to 200 kva
Loading Un loading of Distribution Transformer Below 250 Kva
Transporting of charges of DT/Line materials using Private Vehicle up to 20 KM (up and Down )
Fabrication and Erection of Concrete Ring
Coping of Structure pole
Set right of leaning of LT pole including x arms, TI fittings
Drilling / Less than 23mm holes per hole / slotted holes
For Ordinary. Tree clearance in HT or LT and Throne bushes & trees
For Coconut trees / Palmyra
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
etw78spec.pdf
Tender Documents • 1.47 MB
BOQ_772750.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid