Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.7 LAdmitted-Finance | ₹91.7 L | L1 | Admitted-Finance |
| 2 | L2₹97.0 L+₹5.3 L (5.79%)Admitted-Finance | ₹97.0 L+₹5.3 L (5.79%) | L2 | Admitted-Finance |
| 3 | L3₹97.9 L+₹6.2 L (6.80%)Admitted-Finance | ₹97.9 L+₹6.2 L (6.80%) | L3 | Admitted-Finance |
| 4 | L4₹1.0 Cr+₹9.6 L (10.5%)Admitted-Finance | ₹1.0 Cr+₹9.6 L (10.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.0 Cr+₹9.7 L (10.5%)Admitted-Finance JAGATSINGHPUR ODISHA 754142 | JAGATSINGHAPUR | ODISHA | 754142 | ₹1.0 Cr+₹9.7 L (10.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AM CONSTRUCTION AND ENGINEERING L8 | M/s.SAI SHREYASI CONSTRUCTION L1 | MANGALA BUILDERS ASSOCIATES L9 | GURU CHARAN DAS L3 | MAA DAKHINAKALI ENTERPRISERS L6 | M/S BHAIRAB CHARAN SWAIN L2 | BIKRAM KESHARI ROUTARAY L5 | Anuja Mohapatra L4 | LAXMIDHAR ROUT L7 | sai nithya constructions pvt ltd L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing single under reamed bored compaction pile foundation of 300mm dia & 6.00m length long with reinforced cement concrete of M-20 grade using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream at appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes but excluding GST etc.complete as directed by the Engineer-in-charge .
NB:One initial load test and one routine load test ( as per IS 2911 pt-IV) must be conducted. The agency will pay all the expenses.(excluding cost of reinforcement steel and binding wire). | 104 | Each No | 12,500 ₹13,00,000 | 4,000 ₹4,16,000 | 3,500 ₹3,64,000 Lowest | 4,000 ₹4,16,000 | 4,550 ₹4,73,200 | 6,000 ₹6,24,000 | 12,000 ₹12,48,000 | 9,500 ₹9,88,000 | 7,200 ₹7,48,800 | 4,600 ₹4,78,400 |
| 2.00 | Cutting pile head up to cut off level including disposing of the dismantled material out of work site, barricating the work site if necessary with supply of all materials, labour, T&P,PPE, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | 104 | Each No | 300 ₹31,200 | 30 ₹3,120 Lowest | 500 ₹52,000 | 50 ₹5,200 | 50 ₹5,200 | 150 ₹15,600 | 200 ₹20,800 | 210 ₹21,840 | 405 ₹42,120 | 1,000 ₹1,04,000 |
| 3.00 | Earth work in all kind of soil with initial lead and lift including rough dressing and the excavated earth transported by vehicles with supply of all material, labour, transporation cost , taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge. | 274.1 | Each Cum | 120 ₹32,891.4 | 70 ₹19,186.65 Lowest | 132 ₹36,180.54 | 200 ₹54,819 | 125 ₹34,261.88 | 100 ₹27,409.5 | 125 ₹34,261.88 | 190 ₹52,078.05 | 207 ₹56,737.67 | 310 ₹84,969.45 |
| 4.00 | Filling in foundation and plinth with excavated all kind of soil including watering and ramming with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed by EIC. as directed by the Engineer-in-charge | 182.8 | Each Cum | 200 ₹36,560 | 40 ₹7,312 | 150 ₹27,420 | 100 ₹18,280 | 70 ₹12,796 | 100 ₹18,280 | 210 ₹38,388 | 150 ₹27,420 | 36 ₹6,580.8 Lowest | 2,500 ₹4,57,000 |
| 5.00 | Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer not exceeds 0.30m.,watering ,compacting etc all complete including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollage etc all complete but excluding GST. as directed by EIC. (NB- 10% void shall be deducted from measured Qnty) | 34.2 | Each Cum | 400 ₹13,680 | 150 ₹5,130 Lowest | 300 ₹10,260 | 200 ₹6,840 | 210 ₹7,182 | 270 ₹9,234 | 300 ₹10,260 | 220 ₹7,524 | 306 ₹10,465.2 | 2,500 ₹85,500 |
| 6.00 | P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge. | 19.2 | Each Cum | 4,000 ₹76,800 | 3,800 ₹72,960 | 4,900 ₹94,080 | 4,500 ₹86,400 | 2,900 ₹55,680 Lowest | 3,800 ₹72,960 | 4,050 ₹77,760 | 3,800 ₹72,960 | 6,300 ₹1,20,960 | 7,000 ₹1,34,400 |
| 7.00 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour,T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge.
N.B:Regular cube test and after completion of work core cutting test will be conducted . The agency will execute the test with paying the test expenses. | 194.7 | Each Cum | 5,200 ₹10,12,440 | 5,800 ₹11,29,260 | 6,500 ₹12,65,550 | 5,000 ₹9,73,500 | 5,100 ₹9,92,970 | 4,800 ₹9,34,560 Lowest | 5,100 ₹9,92,970 | 6,050 ₹11,77,935 | 7,200 ₹14,01,840 | 8,200 ₹15,96,540 |
| 8.00 | Supply Tor/TMT steel rebar of minimum grade Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes, etc. all completebut excluding GST as per the direction of Engineer-in-charge. NB: (i)No payment shall be made for extra weight than theoretical co-efficient.
(ii) Manufacturing test certificate must be provided before payment of bill. | 238.3 | Each Qtl | 7,500 ₹17,87,250 | 6,000 ₹14,29,800 Lowest | 7,200 ₹17,15,760 | 7,200 ₹17,15,760 | 6,150 ₹14,65,545 | 6,000 ₹14,29,800 Lowest | 7,400 ₹17,63,420 | 7,400 ₹17,63,420 | 6,300 ₹15,01,290 | 8,100 ₹19,30,230 |
| 9.00Providing rigid smooth leak proof centering & shuttering etc made of steel/ply, plank of approved quality for R.C.C. structures and de shuttering and removing the same after due period over with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in -charge. | |||||||||||||
| 9.10 | Beam, column, girder | 1,575.81 | Each Sqm | 300 ₹4,72,743 | 250 ₹3,93,952.5 Lowest | 510 ₹8,03,663.1 | 375 ₹5,90,928.75 | 385 ₹6,06,686.85 | 250 ₹3,93,952.5 Lowest | 250 ₹3,93,952.5 Lowest | 510 ₹8,03,663.1 | 333 ₹5,24,744.73 | 600 ₹9,45,486 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
9 Apr 2026, 5:00 pmClosed
S K Samal, EE, BCD, PPA
S K Samal, EE, ECM(I/C), PPA
Construction of compound wall around the new Marine Museum near Light House at Paradip Port
2026_MoS_903128_1
CE/BC/ACCTS-01/2026/124
Open Tender
Civil Works
Works
120 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹3,000
Yes
AS PER E-TCN AND TD
₹2.5 L
Yes
5 Aug 2026
19 Mar 2026
13 Apr 2026
19 Mar 2026
9 Apr 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Providing single under reamed bored compaction pile foundation of 300mm dia & 6.00m length long with reinforced cement concrete of M-20 grade using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream at appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes but excluding GST etc.complete as directed by the Engineer-in-charge .
NB:One initial load test and one routine load test ( as per IS 2911 pt-IV) must be conducted. The agency will pay all the expenses.(excluding cost of reinforcement steel and binding wire). | - | Each No | - | - |
| - | Cutting pile head up to cut off level including disposing of the dismantled material out of work site, barricating the work site if necessary with supply of all materials, labour, T&P,PPE, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | - | Each No | - | - |
| - | Earth work in all kind of soil with initial lead and lift including rough dressing and the excavated earth transported by vehicles with supply of all material, labour, transporation cost , taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge. | - | Each Cum | - | - |
| - | Filling in foundation and plinth with excavated all kind of soil including watering and ramming with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed by EIC. as directed by the Engineer-in-charge | - | Each Cum | - | - |
| - | Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer not exceeds 0.30m.,watering ,compacting etc all complete including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollage etc all complete but excluding GST. as directed by EIC. (NB- 10% void shall be deducted from measured Qnty) | - | Each Cum | - | - |
| - | P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge. | 1 | Each Cum | - | - |
| - | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour,T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge.
N.B:Regular cube test and after completion of work core cutting test will be conducted . The agency will execute the test with paying the test expenses. | 1 | Each Cum | - | - |
| - | Supply Tor/TMT steel rebar of minimum grade Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes, etc. all completebut excluding GST as per the direction of Engineer-in-charge. NB: (i)No payment shall be made for extra weight than theoretical co-efficient.
(ii) Manufacturing test certificate must be provided before payment of bill. | - | Each Qtl | - | - |
| - | Providing rigid smooth leak proof centering & shuttering etc made of steel/ply, plank of approved quality for R.C.C. structures and de shuttering and removing the same after due period over with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in -charge. | - | - | - | - |
| - | Beam, column, girder | 1 | Each Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_949246.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .