Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 CrAccepted-Finance | ₹2.2 Cr | 1 | Accepted-Finance L-1 Bidder |
| 2 | 2₹2.4 Cr+₹13.5 L (6.02%)Accepted-Finance HOUSE NO 190 WARD NO 08 HAMIRPUR | ₹2.4 Cr+₹13.5 L (6.02%) | 2 | Accepted-Finance L-2 Bidder |
| 3 | 3₹2.5 Cr+₹27.2 L (12.1%)Accepted-Finance | ₹2.5 Cr+₹27.2 L (12.1%) | 3 | Accepted-Finance L-3 Bidder |
| 4 | 4₹2.7 Cr+₹42.4 L (18.9%)Accepted-Finance VILL DURANG TEHSIL BILLAWAR DISTT KATHUA J K | ₹2.7 Cr+₹42.4 L (18.9%) | 4 | Accepted-Finance L-4 Bidder |
| 5 | 5₹2.7 Cr+₹43.6 L (19.4%)Accepted-Finance | ₹2.7 Cr+₹43.6 L (19.4%) | 5 | Accepted-Finance L-5 Bidder |
| Sl No | Description | Qty | Unit | Surinder Pal Dhall L3 | Des Raj & Co. L5 | PRITAM SINGH BUILDERS L4 | SAHARANPUR DRILLING & CONSTRUCTION PVT LTD L7 | tilk singh L6 | MSC Roads And Bridges Private Limited L2 | CP SYSTEMS PVT. LTD. L8 | ASHOK CHAUHAN AND COMPANY L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of
excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 1,080 | Cum | 93,355.2 ₹1,10,159.14 | 1,35,000 ₹1,59,300 | 86,032.8 ₹1,01,518.7 Lowest | 2,46,240 ₹2,90,563.2 | 1,62,000 ₹1,91,160 | 2,16,000 ₹2,54,880 | 1,41,534 ₹1,67,010.12 | 1,72,800 ₹2,03,904 |
| 2.00 | Providing and fixingrock anchor 25 mm dia 3 to 5 m long into rock/ concrete including drilling the holes and grouting complete as per direction of EIC | 1,088 | Rm | 5,73,506.56 ₹6,76,737.74 | 8,16,000 ₹9,62,880 | 5,28,768 ₹6,23,946.24 | 13,05,600 ₹15,40,608 | 10,56,448 ₹12,46,608.64 | 2,72,000 ₹3,20,960 Lowest | 9,79,200 ₹11,55,456 | 5,98,400 ₹7,06,112 |
| 3.00 | Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing
in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 6,299.52 | kg | 3,96,239.81 ₹4,67,562.97 | 4,09,468.8 ₹4,83,173.18 | 3,95,042.9 ₹4,66,150.62 Lowest | 4,85,063.04 ₹5,72,374.39 | 6,92,947.2 ₹8,17,677.7 | 5,03,961.6 ₹5,94,674.69 | 5,66,956.8 ₹6,69,009.02 | 4,22,067.84 ₹4,98,040.05 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3,834 | Cum | 1,74,86,950.68 ₹2,06,34,601.8 | 1,76,36,400 ₹2,08,10,952 | 1,90,81,818 ₹2,25,16,545.24 | 2,16,62,100 ₹2,55,61,278 | 1,79,08,614 ₹2,11,32,164.52 | 1,72,53,000 ₹2,03,58,540 | 2,28,28,977.9 ₹2,69,38,193.92 | 1,48,56,750 ₹1,75,30,965 Lowest |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc | 1,803.6 | Sqm | 4,76,889.88 ₹5,62,730.05 | 6,31,260 ₹7,44,886.8 | 1,43,674.78 ₹1,69,536.24 Lowest | 5,33,865.6 ₹6,29,961.41 | 3,24,648 ₹3,83,084.64 | 2,70,540 ₹3,19,237.2 | 7,41,550.14 ₹8,75,029.17 | 3,22,844.4 ₹3,80,956.39 |
| 6.00 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A,including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter | 1,156 | m | 1,39,113.04 ₹1,64,153.39 Lowest | 2,60,100 ₹3,06,918 | 1,70,452.2 ₹2,01,133.6 | 3,82,636 ₹4,51,510.48 | 2,08,080 ₹2,45,534.4 | 2,31,200 ₹2,72,816 | 3,01,195.8 ₹3,55,411.04 | 2,08,080 ₹2,45,534.4 |
| 7.00 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 1,170 | Cum | 22,03,168.5 ₹25,99,738.83 | 28,66,500 ₹33,82,470 | 22,51,208.7 ₹26,56,426.27 | 40,95,000 ₹48,32,100 | 28,91,070 ₹34,11,462.6 | 14,62,500 ₹17,25,750 Lowest | 35,14,738.5 ₹41,47,391.43 | 24,80,400 ₹29,26,872 |
Tender Value
₹3.0 Cr
EMD Value
₹6 L
Closing Date
16 Aug 2025, 11:00 amClosed
Gr.Sr.Manager (E)
Procurement and Contracts Division, NHPC Office Complex, Chamera- III Power Station, Karian, Chamba , HP
Construction of retaining wall below the bus stand from joint of NH and churi bridge to river bend in downstream in front of TRT outlet at Dharwala (E-office no. 115340)
2025_NHPC_870028_1
NH/CPS- III/Cont./115340/2025-26/124
Open Tender
Civil Works
Works
180 days
Chamera-III PS
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
NHPC ltd
₹6 L
Yes
30 Jul 2026
23 Jul 2025
19 Aug 2025
23 Jul 2025
16 Aug 2025
23 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of
excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 1,080 | Cum | - | - |
| 2 | Providing and fixingrock anchor 25 mm dia 3 to 5 m long into rock/ concrete including drilling the holes and grouting complete as per direction of EIC | 1,088 | Rm | - | - |
| 3 | Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing
in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 6,299.52 | kg | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3,834 | Cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc | 1,803.6 | Sqm | - | - |
| 6 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A,including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter | 1,156 | m | - | - |
| 7 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 1,170 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 6.37 MB
BOQ.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .