Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B2 TOWER 3RD FLOOR CEREBRUM IT PARK KALYANI NAGAR PUNE PUNE MAHARASHTRA 411014 | PUNE | MAHARASHTRA | 411014 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
26 Oct 2023, 3:00 pmClosed
Mr.Tapan Sen (Head-Supply Chain Management)
Worley India Pvt. Ltd., New Energy House, Kondivita, Andheri East, Mumbai
SUPPLY OF FIRE ALARM SYSTEM
2023_REFHQ_170630_1
213102-00123-00-EL-REQ-2014
Single
Electrical - Cables, Switchgear and Other Control Equipment
Supply
180 days
IOCL, Guwahati Refinery, India
3 documents required · 3 mandatory
Exempted
19 Feb 2024
4 Sept 2023
27 Oct 2023
4 Sept 2023
26 Oct 2023
18 Sept 2023
FIRE ALARM SYSTEM -
Supply of Fire Alarm (FA) Equipment to be connected to existing FA Control Panel as per MTO (Annexure - 1) attached with this Requisition for CRU Project in Guwahati Refinery along with all its accessories & any other item required to complete the Fire alarm system in-line with the input documents attached in tender like Specifications & Data Sheets. Refer Material Requisition for details
Integration, programming and commissioning of new detectors and other devices as specified in the MTO for CRU Project of IOCL with existing Simplex make fire alarm control panel located in new control building. All required hardware, software upgrade, accessories, etc. for successful commissioning of the system shall be considered by Bidder in their scope. Refer Material Requisition for details
Description of Work / Item(s)
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.01 OF BOQ1
Description of Work / Item(s)
CHARGES FOR SITE SUPERVISION DURING INSTALLATION, TESTING AND COMMISSIONING, ETC. Refer Annexure-F of ITB for Terms & conditions for Site Supervision Services and Training for Indian bidders.
Supervision at Site during Installation, Testing and Commissioning ofFIRE ALARM SYSTEM, total 12 Man-days shall be considered as per the break-up given below - (a) Supervision during installation - 8 man-days (b) Supervision of testing and commissioning - 4 man-days (refer Material Requisition for details) i.e. Total 12 man-days shall be considered for bid evaluation
Per diem charges (per person) for 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days/ holidays (as applicable to Refinery site).
Description of Work / Item(s)
Unit rates for addition/deletion for FIRE ALARM SYSTEM
FLP (IIC) Addressable Manual Call Point
FLP (IIC) Addressable Heat Detector
Flameproof (IIC) Sounder (Audible Alarm) for (Fire/Toxic Gas/Flammable Gas)
FLP (IIC) Response Indicator
Addressable Isolator Module
Addressable Monitor Module for Flame, UV/IR, MCP & HD)
Addressable Control Module
Loop card
Power supply with Battery Back-up
Terminal block
Flashing Beacons (Red, Blue and Amber)
Flameproof Junction Box
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .