Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
7 Sept 2026, 3:00 pm
Executive Engineer ,PWD
Collectorate Campus Kancheepuram
Special repairs to F500 Ward rear side entrance, sanitary line works for Kitchen, PG Hostel, X-Ray rear side, sewage well main line, painting works for Female ward toilet side, F500 ward rear side wall in Government Arignar Anna Memorial Cancer Hospi
2026_PWD_696948_1
7KPM/03/2026-2027
Open Tender
Civil Works - Buildings
Percentage
Karapettai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹7,000
21 Aug 2026
21 Aug 2026
7 Sept 2026
21 Aug 2026
7 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling clearing away and carfuly stacking materials useful for reuse the existing RCC etc. complete as per the standard specification | 0.45 | m3 | 4,610.31 | ₹2,074.64 |
| 2 | Dismantling clearing away and carfuly stacking materials useful for reuse the FOR any thickness of Brick / Stone Masonry in cement mortar walls under 3m high etc. complete as per the standard specification | 0.75 | m3 | 302.96 | ₹227.22 |
| 3 | Dismantling clearing away and carfuly stacking materials useful for reuse the existing Doors & windows including removal of frames, hinges and fastenings etc. complete as per the standard specification | 4.95 | m2 | 164.31 | ₹813.33 |
| 4 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever nec- essary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard speci- fication and as directed by the departmental officers.- Upto 2.40m Footing Depth.
Data worked out for 48 m3 per day/8 hrs. | 130.5 | m3 | 366.82 | ₹47,870.01 |
| 5 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct- ed by the departmental officers. | 36.6 | m3 | 111.1 | ₹4,066.26 |
| 6 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 4.1 | m3 | 1,845.95 | ₹7,568.39 |
| 7 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 6.3 | m3 | 5,420.4 | ₹34,148.52 |
| 8Renewing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | |||||
| 8.01 | For Foundation and Basement | 0.25 | m3 | 8,128.39 | ₹2,032.1 |
| 9Renewing, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
GeneralCondition.pdf
Tender Documents • 0.31 MB
ETN0703.pdf
Tender Documents • 0.23 MB
BOQ_837875.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].