Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Finance 603 POCKET 1 SECTOR A5 NARELA NORTH WEST DELHI DELHI 110040 UDYAM DL 04 0001018 | NORTH DELHI | DELHI | 110040 | -7.51% | ₹4.0 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 LAdmitted-Finance | -2.55% | ₹4.2 L | L2 | Admitted-Finance |
Updated dates
Tender Value
₹4.3 L
EMD Value
₹8,669
Closing Date
19 Feb 2026, 3:00 pmClosed
EE/HCD-1 Dilshad Garden
EE/HCD-1 Pocket-I Dilshad Garden
Construction of RCC post fencing at Plot A adjacent to ISBT loop near park at Chauhan Khadar, Shastri Park.
2026_DDA_896450_1
22/EE/HCD-1/DDA/2025-26
Open Tender
Civil Works
30 days
EE/HCD-1 Dilshad Garden
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹8,669
10 Mar 2026
31 Jan 2026
20 Feb 2026
31 Jan 2026
19 Feb 2026
31 Jan 2026
Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately).
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
Amount after correction factor of 0.973 on existing items of DSR 2023
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_942259.xls
BOQ • 0.32 MB
NIT22.pdf
Tender Documents • 1.80 MB
Download all tender documents and submit your bid