Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹164.0 CrAccepted-AOC 1ST FLOOR BLOCK B VATIKA TOWERS GOLF COURSE ROAD SECTOR 54 GURUGRAM HARYANA 122002 | GURUGRAM | GURUGRAM | HARYANA | 122002 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹176.0 Cr+₹12.0 Cr (7.30%)Rejected-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹178.2 Cr+₹14.2 Cr (8.65%)Rejected-Finance 7TH FLOOR KALPATARU SYNERGY OPP GRAND HYATT SANTACRUZ EAST MUMBAI 400055 MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400055 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹231.4 Cr+₹67.4 Cr (41.1%)Rejected-Finance C O VOLTAS LIMITED SPARE PARTS DEPOT OLD HUTMENT COLONY NCL NIGAHI SINGRAULI M P 486884 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486884 | L4 | Rejected-Finance Being L4 | |
| 5 | Rejected-Technical 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | - | Rejected-Technical Technically disqualified |
Tender Value
Refer Docs
EMD Value
₹3.9 Cr
Closing Date
28 Apr 2025, 3:00 pmClosed
Chief Electrical Engineer Project-II
Uttar Pradesh Metro Rail Corporation, Administrative Building, Vipin Khand, Gomti Nagar, Near Dr. Bhimrao Ambedkar Samajik Parivartan Sthal, Lucknow-226010, Uttar Pradesh, India
Design Verification, Detail Engineering, Supply, Installation, Testing and Commissioning of Electrical and Mechanical System, DG Sets, Environment Control System, Tunnel Ventilation System and Building Management System for 03 UG metro stations
2025_UPMRC_226110_1
KNPE-03
Open Tender
Electrical Works
Percentage
420 days
Kanpur
As per Tender
7 documents required · 7 mandatory
₹23,600
Uttar Pradesh Metro Rail Corporation Limited
₹3.9 Cr
Online
7 Nov 2025
10 Feb 2025
29 Apr 2025
10 Feb 2025
28 Apr 2025
12 Apr 2025
10 Feb 2025 - 27 Feb 2025
28 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule A : Subhead A1 | |||||
| 1.01 | Electrical & Mechanical Works (E&M) including fire protection system | 1 | As per Annexure A1 | 61,36,88,693 | ₹61,36,88,693 |
| 2Schedule A : Subhead A2 | |||||
| 2.01 | Environment Control System (ECS), Tunnel Ventillation System (TVS) & Building Management System (BMS) etc. | 1 | As per Annexure A2 | 1,02,34,71,463 | ₹1,02,34,71,463 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
162950487.xls
BOQ Document • 1.63 MB
162950488.pdf
Tender Document • 15.56 MB
Part_5.pdf
Tender Document • 35.58 MB
Part_6.pdf
Tender Document • 1.57 MB
Part_4.pdf
Tender Document • 1.24 MB
Part_2.pdf
Tender Document • 3.06 MB
Part_3.pdf
Tender Document • 21.57 MB
Part_1.pdf
Tender Document • 2.83 MB
162950490.html
Tender Document • 0.07 MB
166165802.pdf
Tender Document • 0.56 MB
167515765.pdf
Tender Document • 0.57 MB
168275626.pdf
Tender Document • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .