Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.3 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹19.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹19.3 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹19.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹19.3 LAdmitted-Fee/PreQual/Technical/Finance 471 MAHANAGAR RAHIM NAGAR LUCKNOW 226006 | LUCKNOW | UTTAR PRADESH | 226006 | -15.00% | ₹19.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹19.3 LAdmitted-Fee/PreQual/Technical/Finance 383 ASHUTOSH NAGAR THANA KRISHNA NAGAR DISTRICT LUCKNOW 226001 | LUCKNOW | UTTAR PRADESH | 226001 | -15.00% | ₹19.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹19.3 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹19.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
17 Aug 2026, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Construction of an RCC drain for drainage in Nehru Enclave (Papermill Ward), extending from R-1 to near V-5
2026_DOLBU_1175424_1
146/CE/2026-27/03
Open Tender
Civil Works
Fixed-rate
Lucknow Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,675
Lucknow Municipal Corporation
₹2.3 L
17 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing RCC work manually/by mechanical menas including stacking of serviceable materail and disposal of unserviceable within 50 mtrs etc al comp. | 2.4 | Cum | 2,805.3 | ₹6,732.72 |
| 2 | Demolishing brick work manually/by mechanical menas including stacking of serviceable materail and disposal of unserviceable within 50 mtrs etc al comp. | 13.8 | Cum | 1,627.45 | ₹22,458.81 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavtor)/ manual menas over areas (exceeding 30cm in depth, 1.5m width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m lift upto 1.5m etc all comp. | 270 | cum | 140.21 | ₹37,856.7 |
| 4 | P/L in Position cement concrete of specified grade excluding the cost of centering ans shuttering all work upto plinth level 1:5:10 etc all comp. | 30 | Cum | 4,889.51 | ₹1,46,685.3 |
| 5 | P/L in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement all work upto plinth level 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20mm nominal size etc all comp. | 118.8 | Cum | 7,145.71 | ₹8,48,910.35 |
| 6 | Centering and shuttering work including removal of from work etc all comp For wall | 540 | sqm | 665.53 | ₹3,59,386.2 |
| 7 | For Slab | 180 | sqm | 732.48 | ₹1,31,846.4 |
| 8 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding etc all comp. | 79.27 | qtl | 8,519 | ₹6,75,301.13 |
| 9 | Disposal of surplus earth upto 8km distance etc all comp. | 229.5 | cum | 237.49 | ₹54,503.96 |
| 10 | Deduction the cost of old materail Bricks | 1,904.4 | nos | -4.72 | - |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_2.pdf
PDF • 1.40 MB
BOQ_2208914.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .