| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.6 LAccepted-AOC | ₹11.6 L | L-1 | Accepted-AOC AOC |
| 2 | L-2₹11.6 LRejected-Finance | ₹11.6 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹11.8 LRejected-Finance ANWALKHEDA MR | CHHINDWARA | MADHYA PRADESH | 460663 | ₹11.8 L | L-3 | Rejected-Finance L-3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per clouse no 6(iv) |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
16 Oct 2024, 2:00 pmClosed
EE, BDGC, BSR
EE, BDGC, BSR
RECONSTRUCTION OF VRB AT KM. 18.930 OF MAIN KALDA DY
2024_UPIDC_964699_4
04/EE/2024-25
Open Tender
Civil Works
60 days
Bulandshahr
FEE/EMD/TECH
2 documents required · 2 mandatory
₹266
₹28,000
28 Jan 2026
10 Oct 2024
16 Oct 2024
10 Oct 2024
16 Oct 2024
10 Oct 2024
Amount
Earth work in cutting in all type of soil in in foundation with ramming and dressing.
Laying C.C. 1:3:6 in foundation with cement, coarse sand & stone grit 25 to 37.25 mm. size including all cost of material, labour and T&P etc. complete.
M-100 brick work in 1:4 cement and coarse sand mortar including all cost of material, labour and T&P etc. complete.
Laying R.C.C. in 1:1.5:3cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete.
Laying C.C. in 1:1.5:3cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete
P/Laying of steel Reinforcement in slab & Lintel i/c cost of all material ,labour and T&P etc
P/LCentering & Shuttering for R. C. C. work i/c all cost of material, labour and T&P etc. complete..
P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete.
P/F of PVC Pipe 75mm dia including all cost of material, labour and T&P etc. complete.!
Earth work in filling in all type of soil i/c ramming, dressing with lead upto 1.00 Km.
Earth work in Cutting for Removing Bund
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a 60 M distance.as per direction Engineer-in-charge
Dismantling reinforcement cement concrete in 1:2:4 including stacking of material with in a 60 M distance.
Finishing wall with weather coat by premium acrylic exterior paint applied @ 1.67 ltr/10sqm (asian or berger brand ) of approved make and quality on wall with two or more coat to give an even shade i/c a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg/10 sqm after throughly brushing the surface free from mortar drooping and other foregin matters and sand papered smooth i/c supply of all materials,labours,Tools @ Plants etc. required for proper complection of the work.
Laying of colour precast Interlocking tiles (colour & shape approved by Engineer-in-charge) of thickness 80mm (Compressive strength not less then 30Mpa and weight 5.0 kg) Including 25mm thick local sand base levelling of Interlocking tiles ,dressing of surface to required level and slope, filling joints with local sand all complete work.etc.
P/F of Wheel Gard 750 x 200 x 200 mm size including all cost of material, labour and T&P etc. complete.
Painting latters up to 10.0 cm size including all cost of material, labour and T&P etc. complete
M/S MADAN LAL CONTRACTOR & SUPLAYARS
M/S SHIVAM SINGH CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid