Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAdmitted-Finance FLAT NO 151 BLOCK NO 1 DIAMOND SQUARE CGHS LTD PLOT NO 13A SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L1 | Admitted-Finance | |
| 2 | L2₹31.7 L+₹2.7 L (9.30%)Admitted-Finance WZ 831 NANGAL RAYA PANKHA ROAD NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L2 | Admitted-Finance | |
| 3 | L3₹32.0 L+₹3.0 L (10.5%)Admitted-Finance A 402 DESIGN ARCH E HOMES SITE C SURAJ PUR GREATER NOIDA GULISTANPUR GAUTAM BUDH NAGAR UP 201306 | GREATER NOIDA | GAUTAM BUDH NAGAR | UP | 201306 | L3 | Admitted-Finance | |
| 4 | L4₹32.0 L+₹3.1 L (10.5%)Admitted-Finance E 73 FF GALI NO 17B SADH NAGAR PALAM COLONY NEW DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | L4 | Admitted-Finance | |
| 5 | L5₹33.3 L+₹4.3 L (15.0%)Admitted-Finance SURAJ HOUSE KOTHI NO 1614 SECTOR 7E FARIDABAD HR | FARIDABAD | FARIDABAD | HARYANA | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Tushar engineers L2 | Deven Associates L6 | Ridhi engineers and builders L9 | DYNAMIC BUILDING SOLUTION L3 | Microsys Controls India L8 | PRASAD ELECTRICALS L4 | RS GREEN INDIA CONSTRUCTION L7 | BRIJ MOHAN LAL AND CO. L1 | AJIT PARKASH BREJA L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc 1.5 Mtr wide and not exc 1.5 Mtr deep for pipe line/cable in any type of soil getting out and levelling of bottom surface to required level all as specified and as directed. | 726 | CUM | 157 ₹1,13,982 | 109 ₹79,134 | 120 ₹87,120 | 50 ₹36,300 Lowest | 50 ₹36,300 Lowest | 155 ₹1,12,530 | 120 ₹87,120 | 100 ₹72,600 | 300 ₹2,17,800 |
| 2.00 | Returning filling in (Soils), including spreading, leveling, watering and well ramming in layers not exc 25cm thick all as specified and directed. | 545 | CUM | 25 ₹13,625 | 19 ₹10,355 | 20 ₹10,900 | 20 ₹10,900 | 5 ₹2,725 Lowest | 88 ₹47,960 | 50 ₹27,250 | 50 ₹27,250 | 50 ₹27,250 |
| 3.00 | Removing excavated material from site to a distance not exc 50mtr away and depositing where directed not exc 1.5mtr from the starting point all as directed. | 181 | CUM | 55 ₹9,955 | 59 ₹10,679 | 20 ₹3,620 | 30 ₹5,430 | 5 ₹905 Lowest | 88 ₹15,928 | 50 ₹9,050 | 50 ₹9,050 | 300 ₹54,300 |
| 4.00 | Excavation in trenches by cutting of road crossing PCC hard standing for taking out/laying of pipe including making good the existing surfaces with same finish to match the original finish and remove the rubbish / PCC from road to out side MoD land at his own arrangement complete complete all as specified and as directed. | 2 | CUM | 1,900 ₹3,800 | 329 ₹658 Lowest | 2,500 ₹5,000 | 3,500 ₹7,000 | 350 ₹700 | 2,234 ₹4,468 | 1,250 ₹2,500 | 500 ₹1,000 | 4,000 ₹8,000 |
| 5.00Taking up GI/Cast Iron/ Ductile Iron water mains of following bore including all fittings with spigot & socket ends of lead joints including burning out lead joints and recovering lead complete all as specified and as directed. (Note :- Excavation & earth work for new location shall be measured & paid separetely. | ||||||||||||
| 5.01 | 80mm Bore | 100 | RM | 31 ₹3,100 | 15 ₹1,500 | 25 ₹2,500 | 10 ₹1,000 Lowest | 10 ₹1,000 Lowest | 33 ₹3,300 | 20 ₹2,000 | 20 ₹2,000 | 50 ₹5,000 |
| 5.02 | 100 mm bore | 253 | RM | 34 ₹8,602 | 19 ₹4,807 | 25 ₹6,325 | 10 ₹2,530 Lowest | 10 ₹2,530 Lowest | 33 ₹8,349 | 20 ₹5,060 | 25 ₹6,325 | 50 ₹12,650 |
| 5.03 | 150 mm bore | 253 | RM | 37 ₹9,361 | 24 ₹6,072 | 45 ₹11,385 | 20 ₹5,060 | 10 ₹2,530 Lowest | 44 ₹11,132 | 20 ₹5,060 | 30 ₹7,590 | 50 ₹12,650 |
| 5.04 | 200 mm bore | 100 | RM | 39 ₹3,900 | 32 ₹3,200 | 95 ₹9,500 | 20 ₹2,000 | 10 ₹1,000 Lowest | 44 ₹4,400 | 20 ₹2,000 | 30 ₹3,000 | 85 ₹8,500 |
| 6.00Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. Note 4 :- Cost of Rubber gasket joints (Tyton Joint) included in quoted unit rates. | ||||||||||||
Tender Value
₹45.0 L
EMD Value
₹89,920
Closing Date
26 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE U WATER SUPPLY DELHI CANTT 10
GE U WATER SUPPLY DELHI CANTT 10
REPAIR REPLACEMENT MAINT RE ROUTING OF CI DI GI DISTRIBUTION SYSTEM INCLUDING MS PIPE LINE HEADER AND CONNECTED ITEMS AT DGIS IHQ CAMPS CAMS VIKRAM VIHAR WARDEC 1 CBPO AREA OLD VRC ANUJ VIHAR YOGINDER VIHAR AND SUBROTO PARK AND REPAIR MAINT OF CHLORO
2026_MES_787987_1
GE/WS/Token No-51 OF 2026-27
Open Tender
Civil Works
Item Rate
270 days
GE U WATER SUPPLY DELHI CANTT 10
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE U WATER SUPPLY DELHI CANTT 10
₹89,920
Yes
5 Oct 2026
5 Sept 2026
28 Sept 2026
5 Sept 2026
26 Sept 2026
20 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exc 1.5 Mtr wide and not exc 1.5 Mtr deep for pipe line/cable in any type of soil getting out and levelling of bottom surface to required level all as specified and as directed. | 726 | CUM | 2 | ₹1,452 |
| 2 | Returning filling in (Soils), including spreading, leveling, watering and well ramming in layers not exc 25cm thick all as specified and directed. | 545 | CUM | 3 | ₹1,635 |
| 3 | Removing excavated material from site to a distance not exc 50mtr away and depositing where directed not exc 1.5mtr from the starting point all as directed. | 181 | CUM | 62 | ₹11,222 |
| 4 | Excavation in trenches by cutting of road crossing PCC hard standing for taking out/laying of pipe including making good the existing surfaces with same finish to match the original finish and remove the rubbish / PCC from road to out side MoD land at his own arrangement complete complete all as specified and as directed. | 2 | CUM | 2 | ₹4 |
| 5Taking up GI/Cast Iron/ Ductile Iron water mains of following bore including all fittings with spigot & socket ends of lead joints including burning out lead joints and recovering lead complete all as specified and as directed. (Note :- Excavation & earth work for new location shall be measured & paid separetely. | |||||
| - | 80mm Bore | 100 | RM | 22 | ₹2,200 |
| - | 100 mm bore | 253 | RM | 22 | ₹5,566 |
| - | 150 mm bore | 253 | RM | 22 | ₹5,566 |
| - | 200 mm bore | 100 | RM | 22 | ₹2,200 |
| 6Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. Note 4 :- Cost of Rubber gasket joints (Tyton Joint) included in quoted unit rates. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_883175.xls
BOQ • 0.44 MB
tender.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .