Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹47.3 LAccepted-Finance 4C 1 KESHAR VIHAR NEAR NSF INTER COLLEGE BALAJI PURAM SHAHGANJ AGRA 282010 | AGRA | UTTAR PRADESH | 282010 | ₹47.3 L | L-1 | Accepted-Finance L-1 Accepted Bidder |
| 2 | L-2₹48.4 L+₹1.1 L (2.35%)Rejected-Finance 00 FAZAL MARKET KANPUR ROAD FATEHGARH FARRUKHABAD UTTAR PRADESH 209601 UDYAM UP 25 0007988 09AOAPM8748M1Z8 B R | FARRUKHABAD | UTTAR PRADESH | 209601 | ₹48.4 L+₹1.1 L (2.35%) | L-2 | Rejected-Finance Not Being L-1 |
| 3 | L-3₹48.8 L+₹1.5 L (3.11%)Rejected-Finance YUVRAJ SILVER TOWER DEPUTY PARA ROAD KUTCHERY RANCHI 834001 | RANCHI | JHARKHAND | 834001 | ₹48.8 L+₹1.5 L (3.11%) | L-3 | Rejected-Finance Not Being L-1 |
| 4 | L-4₹54.5 L+₹7.2 L (15.2%)Rejected-Finance | ₹54.5 L+₹7.2 L (15.2%) | L-4 | Rejected-Finance Not Being L-1 |
| 5 | L-5₹57.0 L+₹9.7 L (20.5%)Rejected-Finance | ₹57.0 L+₹9.7 L (20.5%) | L-5 | Rejected-Finance Not Being L-1 |
Tender Value
₹70.8 L
EMD Value
₹88,600
Closing Date
30 Apr 2026, 10:00 amClosed
Staff Officer (Civil), Magadh-Sanghmitra Area
Office of the General Manager, Magadh-Sanghmitra Area, Bachra, Dist Chatra, Jharkhand 829201
Renovation and Beautification of Pratiksha Campus and its buildings under GM Unit of Magadh-Sanghmitra Area.
2026_CCL_358267_1
GMMS/SOC/Tender/26-27/04/25
Open Tender
Civil Works - Buildings
Percentage
120 days
GM Unit, Magadh-Sanghmitra Area
As per NIT
5 documents required · 5 mandatory
₹88,600
8 Sept 2026
13 Apr 2026
2 May 2026
15 Apr 2026
30 Apr 2026
15 Apr 2026
15 Apr 2026 - 23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed within a lead of 50m. | - | Cum | - | - |
| 2 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | - | - |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m | - | Cum | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centring, shuttering1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 8 | Brick work with F.P.S. bricks of class designation 50 in foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | - | - |
| 9 | Centring and shuttering including strutting, propping etc. and removal of form for removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 10 | Centring and shuttering including strutting, propping etc. and removal of form for removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.53 MB
BOQ_371142.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .