Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAdmitted-Finance | ₹6.2 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical NOT AS PER NIT |
| 3 | Rejected-Technical VITHAL UDYOGNAGAR GMM PFAUDLER LTD VITHAL UDYOGNAGAR ANAND SOJITRA ROAD KARAMSAD ANAND GUJARAT 388325 KARAMSAD | ANAND | GUJARAT | 388325 | - | - | Rejected-Technical NOT AS PER NIT |
| 4 | Rejected-Technical NO 67 73 PACHAYANKUPPAM VALLALAR NAGAR SIPCOT CUDDALORE TAMIL NADU 607005 | CUDDALORE | TAMIL NADU | 607005 | - | - | Rejected-Technical NOT AS PER NIT |
| 5 | Rejected-Technical 148 149 VILL SAJJANPUR PILLI SHYAMPUR HARIDWAR HARIDWAR UTTARAKHAND 249408 | HARIDWAR | UTTARAKHAND | 249408 | - | - | Rejected-Technical NOT AS PER NIT |
| Sl No | Description | Qty | Unit | GEMINI ENGI-FAB LIMITED L1 |
|---|---|---|---|---|
| 1.00SUPPLY OF ITEMS AS PER FOLLOWING SPECIFICATIONS | ||||
| 1.01 | PROCUREMENT OF RAW MATERIAL,MANUFACTURING,TESTING, INSPECTION AND SUPPLY
OF THIRD STAGE COOLER E-433 FOR SYN GAS COMPRESSOR OF AMMONIA PLANT AS
PER DRAWING NO TH/011/2516 AND TH/011/2529. | 1 | Number | 1,48,35,000 ₹1,48,35,000 Lowest |
| 1.02 | Total TPI Charges for SN 1.01 | 1 | Lumpsum | - |
| 1.03 | PROCUREMENT OF RAW MATERIAL, MANUFACTURE INSPECTION, TESTING AND
TRANSPORTATION OF U TUBE BUNDLE FOR BENFIELD REBOILER, E-302 FOR AMMONIA
PLANT. | 1 | Number | 1,49,25,000 ₹1,49,25,000 Lowest |
| 1.04 | Total TPI Charges for SN 1.03 | 1 | Lumpsum | - |
| 1.05 | FINAL GAS COOLER E-312, AS PER DRAWINGS AND SCOPE OF SUPPLY ENCLOSED. | 1 | Number | 1,30,00,000 ₹1,30,00,000 Lowest |
| 1.06 | Total TPI Charges for SN 1.05 | 1 | Lumpsum | - |
| 1.07 | PROCUREMENT OF RAW MATERIAL,MANUFACTURING,TESTING, INSPECTION AND SUPPLY
OF FOURTH STAGE IMNTER COOLER E-434 FOR SYN GAS COMPRESSOR OF AMMONIA
PLANT. AS PER SCOPE OF SUPPLY AND DRAWINGS ENCLOSED | 1 | Number | 1,47,00,000 ₹1,47,00,000 Lowest |
| 1.08 | Total TPI Charges for SN 1.07 | 1 | Lumpsum | - |
| 1.09 | PROCUREMENT OF RAW MATERIAL,MANUFACTURING,TESTING, INSPECTION AND SUPPLY
OF FIFTH STAGE IMNTER COOLER E-435 FOR SYN GAS COMPRESSOR OF AMMONIA
PLANT. AS PER SCOPE OF SUPPLY AND DRAWINGS ENCLOSED | 1 | Number | 41,00,000 ₹41,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
17 Aug 2020, 10:30 amClosed
CM Purchase
RCF Thal
Exchangers and Tube Bundle
2020_RCFL_568502_1
AN-65940
Open Tender
Miscellaneous Goods
Supply
270 days
RCF Thal
Please refer Tender documents.
7 documents required · 7 mandatory
₹1
Yes
₹5 L
Yes
11 Jan 2021
1 Jul 2020
17 Aug 2020
1 Jul 2020
17 Aug 2020
1 Jul 2020
SUPPLY OF ITEMS AS PER FOLLOWING SPECIFICATIONS
PROCUREMENT OF RAW MATERIAL,MANUFACTURING,TESTING, INSPECTION AND SUPPLY OF THIRD STAGE COOLER E-433 FOR SYN GAS COMPRESSOR OF AMMONIA PLANT AS PER DRAWING NO TH/011/2516 AND TH/011/2529.
Total TPI Charges for SN 1.01
PROCUREMENT OF RAW MATERIAL, MANUFACTURE INSPECTION, TESTING AND TRANSPORTATION OF U TUBE BUNDLE FOR BENFIELD REBOILER, E-302 FOR AMMONIA PLANT.
Total TPI Charges for SN 1.03
FINAL GAS COOLER E-312, AS PER DRAWINGS AND SCOPE OF SUPPLY ENCLOSED.
Total TPI Charges for SN 1.05
PROCUREMENT OF RAW MATERIAL,MANUFACTURING,TESTING, INSPECTION AND SUPPLY OF FOURTH STAGE IMNTER COOLER E-434 FOR SYN GAS COMPRESSOR OF AMMONIA PLANT. AS PER SCOPE OF SUPPLY AND DRAWINGS ENCLOSED
Total TPI Charges for SN 1.07
PROCUREMENT OF RAW MATERIAL,MANUFACTURING,TESTING, INSPECTION AND SUPPLY OF FIFTH STAGE IMNTER COOLER E-435 FOR SYN GAS COMPRESSOR OF AMMONIA PLANT. AS PER SCOPE OF SUPPLY AND DRAWINGS ENCLOSED
Total TPI Charges for SN 1.09
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .