| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.3 CrAccepted-AOC 309 10 SURESHWAR TECHNO IT PARK PREMISES CO OP SOC LTD NEW LINK ROAD BORIVALI WEST MUMBAI 400092 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400092 | L1 | Accepted-AOC AOC | |
| 2 | L2₹36.5 Cr+₹1.2 Cr (3.39%)Rejected-Finance 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L2 | Rejected-Finance Not L1 Hence Reject. | |
| 3 | L3₹37.2 Cr+₹1.9 Cr (5.33%)Rejected-Finance NIKHIL GROUP BEHIND ICC TOWERS NEAR JW MARIOTT SHRI SHIVAJI CHS P NO 65 SENAPATI BAPAT ROAD PUNE MAHARASHTRA 411016 PUNE MAHARASHTRA INDIA 411016 | PUNE | MAHARASHTRA | 411016 | L3 | Rejected-Finance Not L1 Hence Reject. | |
| 4 | Not Admitted-Fee/PreQual/Technical OFFICE NO 515 PLOT NO 194 NMS ICON SECTOR 19 ULWE NAVI MUMBAI MAHARASHTRA 410206 | NAVI MUMBAI | THANE | MAHARASHTRA | 410206 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹31.4 Cr
EMD Value
₹15.7 L
Closing Date
11 Jul 2022, 6:55 pmClosed
Executive Engineer, Public Works Division, Pune 1.
Executive Engineer, Public Works Division, Pune, Central Building Premises, Pune Station, Pune 411001.
9-1 - Construction of Nondani Bhavan Building for Inspector General Register (I.G.R.) of Maharashtra State, at Bundgarden, S. No. 10A, Munjeri 38, Pune -1 (Including Electrical Work).
2022_PWDRP_811434_1
E-Tender Notice No. 9 for 2022-2023 (Short Period)
Open Tender
Civil Works - Buildings
Item Wise
550 days
Council Hall Chawk, Bund Garden, Pune 1
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,360
₹15.7 L
Chief Engineer, Public Works Region, Pune 1
29 Nov 2022
24 Jun 2022
12 Jul 2022
24 Jun 2022
11 Jul 2022
24 Jun 2022
1 Jul 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing grass,grazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc.complete. | 1,460.54 | One Square Metre | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming , watering including shoring and strutting etc. complete. (Lift upto 1.5 metre) By Mechanical Means | 264.37 | One Cubic Metre | - | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming , watering including shoring and strutting etc. complete. (Lift upto 1.50 metre) By Mechanical Mean | 721 | One Cubic Metre | - | - |
| 4 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/ murum, ramming , watering including shoring and strutting etc. complete (lift upto 1.5 metre) By Mechanical Means | 240.33 | One Cubic Metre | - | - |
| 5 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming , watering including shoring and strutting etc. complete. (Lift from 1.5 metre to 3.0 metre) By Mechanical Means | 961.33 | One Cubic Metre | - | - |
| 6 | Excavation for foundation in Softrock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary backfilling with available earth/ murum, ramming , watering including shoring and strutting etc.complete. (Lift from1.5 metre To 3.0 metre) By Mechanical Means | 240.33 | One Cubic Metre | - | - |
| 7 | Excavation for foundation in Softrock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary backfilling with available earth/ murum, ramming , watering including shoring and strutting etc.complete. (Lift from 3.0 metre To 4.5 metre) By Mechanical Means | 1,041.44 | One Cubic Metre | - | - |
| 8 | Excavation for foundation in Softrock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary backfilling with available earth/ murum, ramming , watering including shoring and strutting etc.complete. (Lift from 4.5 metre To 6.0 metre) By Mechanical Means | 160.22 | One Cubic Metre | - | - |
| 9 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including tri millimetre ing and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift from 4.5 metre to 6.0 metre). By Mechanical Means | 881.22 | One Cubic Metre | - | - |
| 10 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 3.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | 600 | One Hour | - | - |
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1399093.xls
BOQ Document • 1.16 MB
100501566.pdf
Tender Document • 0.17 MB
9-1IGRFinal...pdf
Tender Document • 5.30 MB
IGR-Drawings.rar
Tender Document • 1.04 MB
100501568.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .