| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.4 L+₹79,929 (17.2%)Rejected-AOC | ₹5.4 L+₹79,929 (17.2%) | L2 | Rejected-AOC L2 |
| 3 | L3₹6.3 L+₹1.6 L (35.5%)Rejected-AOC | ₹6.3 L+₹1.6 L (35.5%) | L3 | Rejected-AOC L3 |
| 4 | L4₹6.3 L+₹1.6 L (35.5%)Rejected-AOC | ₹6.3 L+₹1.6 L (35.5%) | L4 | Rejected-AOC L3 |
Tender Value
₹6.3 L
EMD Value
₹62,936
Closing Date
27 Apr 2026, 3:00 pmClosed
G.M (Jal), Nagar Nigam Saharanpur
G.M (Jal), Nagar Nigam Saharanpur
Laying of 110mm dai 6kg/cm PVC Pipe Line at Maleen Basti surrounding the Dhobiwala Talab Gote Shah Road ward 63
2026_NNSAH_1137891_1
WW/767/SFC/2025-26
Open Tender
Civil Works - Water Works
Percentage
60 days
Ward No 63
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
₹62,936
21 May 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation of Kankar and Moorum mixed soil for laying pipeline and refilling the same after work completion and disposal of surplus of earth I/C all T&P labour etc. | - | cum | - | - |
| - | Supply & Fixing of following PVC Pipe line 110 mm Ø 6Kg/cm2 Pressure ISI mark with all jointing and laying complete I/C all labour T&P and all materials | 565 | Mt. | - | - |
| - | S/L of 100mm Ø M.S Pipe B-class with fittings materials complete. | 75 | No | - | - |
| - | Making interconnection between Existing 110 mm Pipe line and Newly laid 110 mm Pipe line. complete with all Material i/C C.I.D joint, with all labour etc. | 4 | Job | - | - |
| - | Making 15mmØ stand post including all materials & labour, T&P etc. | 8 | No | - | - |
| - | Shifting of water consumer connection 15mm/20mmØ including necessary items | 40 | No | - | - |
| - | Cleaning of site After completation of work | 1 | Job | - | - |
| - | Add 18% GST | 1 | No | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
BOQ_2124719.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .