Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | ₹7.0 L | L1 | Admitted-Finance |
| 2 | L2₹7.4 LAdmitted-Finance | ₹7.4 L | L2 | Admitted-Finance |
| 3 | L3₹7.5 LAdmitted-Finance | ₹7.5 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical has submitted all the documents as per NIT conditions However MSME certificate is not as per NIT conditions |
| 5 | Rejected-Technical | - | - | Rejected-Technical has not submitted original certified copies of documents as mentioned in NIT in the Division office as intimated by EE Cuttack on dated 13 03 2026 and 17 03 2026 as per NIT conditions |
| Sl No | Description | Qty | Unit | BIBEKANANDA PATRA L1 | SOUMYA RANJAN MOHAPATRA L3 | AJIT KUMAR PATTANAIK L2 |
|---|---|---|---|---|---|---|
| 1.00Sub-Head : Earth Work | ||||||
| 1.01Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | ||||||
| 1.02 | All kinds of soil | 148 | One Cubic Metre | 150 ₹22,200 | 170 ₹25,160 | 180 ₹26,640 |
| 2.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge. | ||||||
| 2.01 | Ordinary rock | 4 | One Cubic Metre | 10 ₹40 | 500 ₹2,000 | 500 ₹2,000 |
| 3.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 3.01 | All kinds of soil. | 3 | One Cubic Metre | 10 ₹30 | 150 ₹450 | 180 ₹540 |
| 4.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 124 | One Cubic Metre | 150 ₹18,600 | 155 ₹19,220 | 210 ₹26,040 |
| 5.00Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. | ||||||
| 5.01 | All kinds of soil. | 85 | One Cubic Metre | 100 ₹8,500 | 75 ₹6,375 | 192 ₹16,320 |
Tender Value
₹8.2 L
EMD Value
₹16,400
Closing Date
11 Mar 2026, 3:00 pmClosed
Nodal Officer (Tender)
3rd floor DSB Unit 9 BBSR 22
Construction of 1 no. 40m. NBLW Ground Based tower foundation including DG set platform and ring earth inside District Hospital, Dhenkanal .
2026_BSNL_269463_1
57/CE(C)/2025-26/BCD/CTC
Open Tender
Civil Works
45 days
District Hospital, Dhenkanal
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Accounts Officer (Cash) BSNL O/o PGMTD,Cuttack
₹16,400
Yes
18 Mar 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
11 Mar 2026
3 Mar 2026
3 Mar 2026 - 11 Mar 2026
Sub-Head : Earth Work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge.
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge.
Ordinary rock
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.
All kinds of soil.
Ordinary or hard rock.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Sub-Head : Concrete Work
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Sub-Head : Reinforced Cement Concrete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Sub-Head : Masonry Work
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation5.0 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)
Sub-Head : Flooring
52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
Sub-Head : Finishing
12 mm cement plaster of mix :
1:6 (1 cement: 6 coarse sand)
Sub-Head : Road Work
Supplying and stacking at site.
Good earth.
Sub-Head : MARKET RATED ITEMS
Carriage of anchor bolts,templates, nuts, guide angle and base plate as required as per direction of Engineer-in-charge from place of store at BHUBANESWAR to work site. Rate includes sorting, labour charges in loading and unloading, safe handling etc all complete.
Galvanising of MS high density tower anchor nuts, washers & bolts (36 nos top 0.20m length) etc as per requirement all complete as per direction of Engineer-in-charge, for protecting against corrosion in coastal & extreme weather conditions area.
Labour charges for arranging and fixing the anchor bolts of 32mm dia @ 9.00 nos in each column (Total 36 nos) including nuts and base plate etc. in position as per direction of Engineer-in-charge. (Templates and anchor bolts, nuts and washers will be supplied by the department)
Providing and fixing ring earth consisting of specified and required ring size at site and laying of G.I. Flats of size 50 x 6 mm laid at the bottom of the tower foundation pit, one metre away from the tower base. The G.I. flats shall be connected with each other with G.I. nuts and bolts after placing lead strips/ lead wool of 90x50x1mm thick in between and with legs of tower with G.I. nuts and bolts with spring washers. All the joints shall be properly wrapped and sealed by water proof tape to avoid ingress of moisture. The G.I flats shall be covered with fine and cohesive good earth all around and duly compacted. The G.I. flats shall be bent in such a way that curves are smooth having radius not less than one metre. The rate shall be inclusive of all materials and labour including tools and plants, incidental cost etc. all complete and nothing extra shall be paid on any account except earthwork in excavation, filling available excavated earth or good earth brought from outside as the case may be. (Note: Payment shall be made only if the ohmic value of the earth resistance is 1.0 ohms or less. Security deposit for the whole work will be released only after completion of A/T Any rectification required to make earth resistance to 1.0 ohms or less is to be carried out by the agency. If the A/T is not done in one year after completion of work 75% of S.D. will be released. Remaining part of S.D. will be released after completion of A/T).
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Tender57.pdf
Tender Documents • 1.94 MB
BOQ_313857.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid