Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC 1 19 12 KATHAR MEERAN NAGAR THERMAL NAGAR TUTICORIN 628 006 | TUTICORIN | TAMIL NADU | 628006 | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹3.0 L+₹62,640 (25.9%)Rejected-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | L2 | Rejected-AOC L2 Bidder |
Tender Value
Refer Docs
EMD Value
₹3,100
Closing Date
3 Jun 2023, 2:00 pmClosed
SE/ES/TTPS
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
EM I Scraping Cleaning and painting of two coats enamel paint in the Unit Auxiliary Transformer 3A 3B UST 3 SST 3 and Busduct support columns of bus duct LAS and support insulators at 4.5mtr floor and at Transformer yard
2023_EB_316312_1
SE/ES /TTPS /No.75/2023-24
Open Tender
Electrical Works
Item Rate
45 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹3,100
Yes
26 Jul 2023
17 May 2023
5 Jun 2023
17 May 2023
3 Jun 2023
17 May 2023
Unit Auxiliary Transformer 3A,3B, UST-3, SST-3 and Busduct: Scraping, cleaning and painting with two coats of enamel paint for Unit Auxiliary Transformer 3A, 3B, UST-3,SST-3 and Busduct in Unit-III .
SUPPORT COLUMNS Scraping, cleaning and painting with two coats of Aluminium paint for support columns of bus duct, LAS and support insulators at 4.5mtr floor and at Transformer yard
S. MURUGAN CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .