Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC 3 6E PARK JUNCTION THIRUVARAMBU | ₹2.9 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | NISSI ELECTRICALS L1 |
|---|---|---|---|---|
| 1.01 | Loading&unloading of 9m PSC pole | 16 | Each | 9,600 ₹11,328 |
| 2.01 | Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground | 16 | per pit | 12,000 ₹14,160 |
| 3.01 | Erection of 9m PSC pole in Normal Ground | 16 | per pole | 12,800 ₹15,104 |
| 4.01 | Transportation of 9m PSC pole from road side to pole pit upto 2KM | 16 | Each Pole | 12,800 ₹15,104 |
| 5.01 | Loading&unloading of 8m PSC pole | 29 | Each | 11,600 ₹13,688 |
| 6.01 | Excavation of 8m pole pits(1.25m*0.5m*1.5m) in Normal Ground | 29 | per pit | 14,500 ₹17,110 |
| 7.01 | Erection of 8m PSC pole in Normal Ground | 29 | per pole | 15,950 ₹18,821 |
| 8.01 | Transportation of 8m PSC pole from road side to pole pit upto 2KM | 29 | Each Pole | 17,400 ₹20,532 |
| 9.01 | Erection of V X arm 4.5 feet | 14 | Each | 5,600 ₹6,608 |
| 10.01 | Fixing of HT/LT TI fittings | 14 | Each | 1,400 ₹1,652 |
Tender Value
Refer Docs
EMD Value
₹2,857
Closing Date
19 Jan 2026, 2:00 pmClosed
EE/TKY
TNEB TKY
Natural Calamity estimate for replacement of 2 nos 9mtr damaged structure poles of Surulacode SS IV in 11 KV Kuttiyani feeder by fallen of Rubber tree due to heavy rain fall and spiral wind on 28 05 2025 Under Kulasekharam Urban Section Tky division
2026_EB_639370_1
EE/D/TKY/ETW 24/Dt.04.01.2025
Open Tender
Electrical Works
90 days
EE/TKY
As specified Tender
3 documents required · 3 mandatory
₹0
₹2,857
Yes
6 Mar 2026
5 Jan 2026
20 Jan 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
6 Jan 2026 - 19 Jan 2026
Loading&unloading of 9m PSC pole
Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground
Erection of 9m PSC pole in Normal Ground
Transportation of 9m PSC pole from road side to pole pit upto 2KM
Loading&unloading of 8m PSC pole
Excavation of 8m pole pits(1.25m*0.5m*1.5m) in Normal Ground
Erection of 8m PSC pole in Normal Ground
Transportation of 8m PSC pole from road side to pole pit upto 2KM
Erection of V X arm 4.5 feet
Fixing of HT/LT TI fittings
Fixing of HT pin insulator
Fixing of LT S phase cross arm
Fixing of LT 3 phase cross arm
Fixing of LT pin insulator
Fixing of shackle
Fixing of aluminium knob
Excavation of stay pit (1.00m*0.5m*1.5m) in normal ground
Erection of stay set complete in normal ground
Paving and stringing of LT ACSR 7/2.59 conductor in pin point
Paving and stringing of LT ACSR 7/2.59 conductor in cut point
Paving and stringing of HT ACSR 7/4.09 conductors equivalent conductor in pin point
Coil earthing per pole & pole earthing
Concreting of poles as per board standards(2'*2'*5'). The material such as sand jelly etc have to be supplied by the contractor cement supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges for placing transporting of sand jelly from box and water curing for 14 days etc complete)
Coping of pole(0.6m*0.6m*0.35m)
Loading&unloading of line materials
Loading&unloading of Distribution Transformer below 250 KVA
Transportation of line materials from Section Office to work spot up to 20 KM
Transporting of Charges of DT/Line materials using private vehicle upto 20KM (up and down)
Painting of DT structure materials(Double coat) including cost of aluminium paint
Painting of single pole (Colour washing with Distember) including cost of paint
Excavation of 4nos earth pits
Excavation of earth wire trenches and paving of earth wire, Erection of 4nos earth pipe and giving earth connection, Earthing of all metal parts, LAS etc including neutral connection
Fixing of Danger Board(including clamp and Board)
Erection of LED lamp fittings
Drilling/less than 23mm hole per hole/slatted hole
Ordinary tree clearance
Dismantling & refixing of V X arm 4.5 feet
Dismantling & refixing of TI fittings
Dismantling & refixing of HT pin insulator
Dismantling & refixing of HT Disc
Dismantling& reerection of stay set in normal ground
Dismantling and Reerection of feeder cable with open type fuse unit per feeder and for each addl feeder
Dismantling and Reerection Bus bar arrangement with open type single pole and double pole
Dismantling and Reerection of Distribution Transformer upto 200 KVA
Dismantling of 9mtr PSC pole
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.37 MB
BOQ_765440.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid