Loading…
Loading…
Tender Value
₹11.8 L
EMD Value
₹23,600
Closing Date
14 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
TRACTION
13 conditions · 2 needing a document upload
Tenderer should submit valid "A" class Electrical Contractor License issued by Electrical Inspector to state government with the offer. If tenderer have not submitted the valid Electrical Contractor License, the offer will be summarily rejected.
In case, submission of Bid Security in the form of Bank Guarantee, the original Bank Guarantee should be delivered in person to the office of Sr. DEE/TRD/LJN, NER Lucknow, before closing date for submission of bids. (i.e. excluding the last date of submission on bids). Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
40 conditions · 4 needing a document upload
Furnish the List of Work completed in the last three financial year giving description of work, organization for the time of award, date of award and date of schedule completion of work. Date of actual start, actual completion date and final value of contract should also be given.
Furnish the list of work in hand including description of work, contract value and approximate value of balance work yet to be done and date of award.
Furnish the Audited balance sheet duly certified by the Chartered Accountant for last three years.
In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured.:- (A) The stamp duty payable in respect of Bank Guarantee differs from state to state as per provisions of Stamp Act applicable in that particular state on thedate of execution. Value of the non judicial stamp paper (NJSP) shall be higher of the following two values: (1) Stamp value asapplicable in State from where Stamp paper is purchased. (2) Stamp Value as applicable in the State of Uttar Pradesh. (B) Bid Offer of tenderer who submits BG in lieu of Bid Security money, in violation of "Para-(A)" above, will be summarily rejected. Also asper GCC-2022, ACS-05:- The original Bank Guarantee should be delivered in person to the official nominated as indicated in thetender document before closing date for submission of bids (i.e. excluding the last date of submission of bids).
Please furnish the list of personnel, organization available in hand and proposed to be engaged for the subject work.
Furnish the list of plant & machinery available in hand (own)and proposed to be included (own and hired to be given separately) for the subject work.
Please Submit your bank details i.e. Name of the bank along with bank branch code, Account Number, IFSC Code and PAN details.
Status of the Firm and Related documents such as affidavit, registration, partnership deed, power of attorney etc.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
WORKS CONTRACT - The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60th day happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day.
In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Earnest Money Deposit and other dues payable against that contract. In case a tenderer has not submitted Earnest Money Deposit on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work.
WORKS CONTRACT - The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the contract value:- (i)A deposit of cash; (ii)Irrevocable Bank Guarantee; (iii)Government Securities including State Loan Bonds at 5% below the market value; (iv)Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds. These forms of Performance Guarantee could be either of the State Bank of India or of any of the Nationalized Banks; (v)Guarantee Bonds executed or Deposit Receipts tendered by all Scheduled Banks; (vi)Deposit in the Post Office Saving Bank ; (vii)Deposit in the National Savings Certificates; (viii)Twelve years National Defence Certificates; (ix)Ten years Defence Deposits; (x)National Defence Bonds and (xi)Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also FDR in favour of FA&CAO (free from any encumbrance) may be accepted.
Works Contract: Security Deposit will be recovered by the Contractor from running bills at the rate of @ 6 percent of the bill amount till the full Security Deposit is recovered, as per rules.
Works Contract :- This contract shall be governed by the provision of GCC (General Condition of Contract) APRIL 2022 edition with up to date corrections thereto or latest edition.
Rates are inclusive of all taxes / octroi, license fee, royalty charges etc. legally leviable by state, Central Government and/or any other local authority.
Income Tax, Cess and any other tax will be recovered as per extant instruction on the subject.
Advertisement Period - Time during which all information pertaining to tender shall be available but offers can not be submitted. i.e from tender publication date to till sixteen days prier to opening of Tender.
Offer Submission Period - Fifteen days prior to opening of tender, during which tenderers can submit their offer.
Tenderer shall submit the documents regarding status of firm along with offers. It is further made clear that partnership firm shall have to attach copy of the latest partnership deed along with latest affidavit certifying the currency of the deed. Similarly, proprietorship firm should also submit the relevant certificate along with latest affidavit regarding currency of the certificate.
Tenderers shall quote the nett rate in their offer for the schedule items. Nett rates shall be treated as inclusive of all taxes.
It will be obligatory on the part of the contractors in these favour the contractor is awarded to employ civil Engineers Graduate/Diploma holders for the duration of contracts as under (Rly Bd. Letter no. 2012/CE-I/ CT/O/20 dated 10.5.13):- 1. One Qualified Graduate Engineer when the cost of work to be executed is Rs. 200 lakh and above. 2. One qualified Diploma holder Engineer when the cost of work to be executed is more than Rs. 25 lakh, but less than Rs. 200 lakh. Technical staff should be available at the site whenever required by engineer- in-charge to take instructions. Contd.
In case contractor fail to employ the Technical staff as aforesaid, he shall be liable to pay a reasonable amount not exceeding a sum of Rs. 40000/-(Rupees Forty thousands only) for each month of default in case of Graduate Engineer and Rs. 25000/- (Rupees twenty five thousands only) for each month or part thereof for the default period in case of Diploma holder. The decision of engineer-in-charge as to the period for each the required technical staff as not employed by the contractor and as the reasonableness of the amount to be deducted on this account shall be final and binding on the contractor.
STAMP DUTY :- Stamp duty shall be payable @ Rs. 70/- per thousand on security deposit if it is in the form of NSC/FDR and if it is in the form of cash it will be @ 125/- per thousand on thousand on security deposit . Till finalization of the special leave petition by the supreme court , Before execution of contract agreement , Tenderer will have to deposit the stamp duty of Rs. 100/- along with an affidavit " if an order shall be passed by supreme court in above Special Leave Petition in favour of Govt. then tenderer will have to deposit the balance stamp duty in addition to Rs. 100/- against the appropriate head of the deptt.
Tenderer will ensure the genuineness of the stamp papers / stamps being utilized. It will be the responsibility of the party entering into agreement with the railway for its genuineness
Contractor is to abide by the provisions of Payment of Wages act & Minimum Wages act in terms of clause 54 and 55 of Indian Railways General Condition of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The Registration/ updation of Portal shall be done as per para 55C of GCC 2022:
WORKS CONTRACT - The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amountingto 5% of the contract value Additional Performance Guarantee as per clause 16(4)(h) in any of the following forms :- :-(i)A deposit of cash;(ii)Irrevocable Bank Guarantee; (iii) Insurance surety bond as per Annexure-XVII (Advance Correction Slip No.9)Note - In case of extension of Date of Completion, selected bidder needs to submit extended Insurance Surety Bond/Fresh Insurance surety Bond/fresh Performance Security, in any form as given above, before expiry of existing Insurance Surety Bond. (iii)Government Securities including State Loan Bonds at 5% below the market value; (iv)Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds. These forms of Performance Guarantee could be either of the State Bank of India or of any of theNationalized Banks;(v)Guarantee Bonds executed or Deposit Receipts tendered by all Scheduled Banks; (vi)Deposit in the PostOffice Saving Bank ;(vii)Deposit in the National Savings Certificates;(viii)Twelve years National Defence Certificates;(ix)Tenyears Defence Deposits;(x)National Defence Bonds and(xi)Unit Trust Certificates at 5% below market value or at the face valuewhichever is less. Also FDR in favour of FA&CAO (free from any encumbrance) may be accepted.16(4) (h) If a tender is acceptedon the quoted rates of bidder which is below the advertised tender value, an additional performance security shall be submitted by the bidder as below :Bid quoted in % of advertised cost Below 0 - 5% (inclusive) Additional Performance Guarantee (%) =NilBid quoted in % of advertised cost Below 5% Additional Performance Guarantee (%) = 5%.
OHE Modification due to Construction of ROB between KM 99/10-11 Section SOT- PRZ in LJN Division of N.E. Railway.
SR-DEE-TRD-LJN-OT-220~NER
SR-DEE-TRD-LJN-OT-220
Open
Works - General
6 Months
Lucknow, Uttar Pradesh
₹0
₹23,600
19 Aug 2026
19 Aug 2026
31 Aug 2026
66 items across 8 schedules · ₹3,29,451.23 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 1(a) Preparation of designs and Single drawings for overhead equipment and verification of purchaser's pegging plan. | Per Track KM | 1.00 | 3,242 | 3,242 |
| 2 | 3(b) Erection of fabricated steel work other than masts. | MT | 0.33 | 2,313 | 763.29 |
| 3 | 31(a) Transfer of equipment from one mast or support to another. | Each | 5.00 | 564 | 2,820 |
| 4 | 31(f) Splicing & extension of an anchored overhead equipment. | Each | 2.00 | 552 | 1,104 |
| 5 | 31(h) Slewing of equipment(OHE). | Each Span | 7.00 | 449 | 3,143 |
| 6 | 31(i) Dismantling of an Isolator. | Each | 1.00 | 299 | 299 |
| Schedule total | ₹11,371.29 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCAPRIL2022.pdf
ATTACHMENT
ACS1to11.pdf
ATTACHMENT
ACS9ANNEXUREXVII.pdf
ATTACHMENT
SrLOGKPletterforPOA.pdf
ATTACHMENT
TenderDocumentsOT220.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].