Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
14 Aug 2026, 6:00 pm
Executive Enginner REW jammu
Executive Enginner REW jammu
Construction of L P Work mohalla Parma nand,Rattan lal and Som nath w.no.3 Pyt. Bandral Khurd Block Akhnoor under PRI Distt.Capex Budget, for the year 2026-27 (Pyt Level)
2026_RDPR_318822_11
e-NIT No. 343 REWJ of 2026-27 dated 31-07-2026
Open Tender
Civil Works
Percentage
Executive Enginner REW jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,880
31 Jul 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manually means in trenches for foundation, drain, pipes, cables etc and for shafts, wells. Cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m inciuding disposal of excavated earth in: AKOS | 71.38 | cum | 479.3 | ₹34,212.43 |
| 2 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 2.41 | cum | 4,826.5 | ₹11,631.87 |
| 3 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 33.95 | cum | 5,734.6 | ₹1,94,689.67 |
| 4 | P/Laying of cement conct. 1:1.5:3( 1 cement :1.5 coarse sand :3 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 0.63 | cum | 7,788.4 | ₹4,906.69 |
| 5 | Reinforcement for RCC work includinng straightening,cutting,bending,placing in position and binding all complete | 44 | Kg | 123.2 | ₹5,420.8 |
| 6 | Centering and shuttering including strutting,propping etc and removal of form for foundations,footings,bases of column etc for mass concrete | 79 | sqm | 286.35 | ₹22,621.65 |
| 7 | Sofit of slab | 1.58 | sqm | 718.2 | ₹1,134.76 |
| 8 | Edges of slab | 9.4 | mtr | 262.2 | ₹2,464.68 |
| 9 | Carriage of sand and Aggregates upto 5 kms by MT | 69.81 | cum | 200.74 | ₹14,013.66 |
| 10 | Providing and fixing Display board including painting,writing all complete | 1 | no. | 3,000 | ₹3,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1053117.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].