Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
16 Apr 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Kapil Mandil
Power Grid Corporation of India Limited Saudamini 3rd Floor Plot No 2 Sector 29 Gurgaon Haryana 122001
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh.
CC-CS/1073-NER/REW-4219/3/G2
Open
Power/Energy Projects/Products
Turn-key
Arunachal Pradesh
₹25,000
2 Mar 2021
2 Mar 2021
20 Apr 2021
2 Mar 2021
16 Apr 2021
2 Mar 2021
16 Mar 2021
Package Name Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
Package Code ARP-DMS-05 Bought-out
Specification No. Specification No.: CC-CS/1073-NER/REW-4219/3/G2
Specification No.: CC-CS/1073-NER/REW-4219/3/G2
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3 and Bid Form 2nd Envelope.
2 All the cells in Sch-5, Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Sole Bidder or JV (Joint Venture) from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
● Type Test charges if applicable shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of GST applicable on supply of Goods and Services) :
● Amount of GST shall be calculated automatically.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Not applicable, hence no cell is required to be filled up.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid form 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Sole Bidder 1
JV (Joint Venture) 2 or more
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] Sole Bidder 1 0
Name of Sole Bidder
Address of Sole Bidder
Name of other Partner - 1
Address of other Partner - 1
Name of other Partner - 2 (more, if any)
Address of other Partner - 2 (more, if any)
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 SCHEDULE-1
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services Direct
Name : Power Grid Corporation of India Ltd., Bought-out
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Plant and Equipment (including Mandatory Spares Parts) to be supplied , including Type Test Charges for Tests to be conducted:
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Description Material Code HSN Code Whether HSN in column ‘6’ is confirmed. If not indicate applicable the HSN code # Rate of GST applicable ( in %) Whether rate of GST in column ‘8’ is confirmed. If not indicate applicable rate of GST # Item Description Unit Qty. Unit Ex-works price (excluding GST) Total Ex-works price (excluding GST)
(I) PKG DMS WORKS: ARP-DMS-05
1 7000002230 23030 66Kv S/C TL 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 31.239 INCLUDED 0 0 0%
2 7000002230 23040 66Kv S/C TL 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 18.023 INCLUDED 0 0 5%
3 7000002230 23050 66Kv S/C TL 1000015276 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 0.236 INCLUDED 0 0 12%
4 7000002230 23060 66Kv S/C TL 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 3.337 INCLUDED 0 0 18%
5 7000002230 23070 66Kv S/C TL 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 4.268 INCLUDED 0 0 28%
6 7000002230 23080 66Kv S/C TL 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.205 INCLUDED 0 0
7 7000002230 23090 66Kv S/C TL 1000010003 73082011 18 Supply of Counterpoise type (120 m length) EA 24 INCLUDED 0 0
8 7000002230 23100 66Kv S/C TL 1000032563 73082011 18 DANGER PLATE FOR 66 KV EA 24 INCLUDED 0 0
9 7000002230 23110 66Kv S/C TL 1000034828 73082011 18 NUMBER PLATE FOR 66 KV TOWER EA 24 INCLUDED 0 0
10 7000002230 23120 66Kv S/C TL 1000017508 73082011 18 Phase Plate (Set of three) SET 24 INCLUDED 0 0
11 7000002230 23130 66Kv S/C TL 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 24 INCLUDED 0 0
12 7000002230 23140 66Kv S/C TL 1000030857 76141000 18 ACSR DOG CONDUCTOR KM 15.75 INCLUDED 0 0
13 7000002230 23150 66Kv S/C TL 1000034331 85469090 18 COMPOSITE LONGROD INSULATOR - 66KV - 45KN (LENGTH 1160 MM) EA 144 INCLUDED 0 0
14 7000002230 23160 66Kv S/C TL 1000034337 73082011 18 SINGLE TENSION STRING-66KV ACSR DOG CONDUCTOR EA 144 INCLUDED 0 0
15 7000002230 23170 66Kv S/C TL 1000015512 76169990 18 Mid Span Compression Joint for Conductor-ACSR Dog EA 10 INCLUDED 0 0
16 7000002230 23180 66Kv S/C TL 1000018441 76169990 18 Repair Sleeve for Conductor-ACSR Dog EA 4 INCLUDED 0 0
17 7000002230 23190 66Kv S/C TL 1000022429 73082011 18 Vibration Damper for Conductor-ACSR Dog EA 144 INCLUDED 0 0
18 7000002230 21440 Substation works 1000001109 85042200 18 2.5MVA, 33/11 kV power transformer with Cu winding along with allaccessories and oil EA 50 INCLUDED 0 0
19 7000002230 21450 Substation works 1000004936 85042200 18 5MVA, 33/11 kV power transformer with Cu winding along with allaccessories and oil EA 7 INCLUDED 0 0
20 7000002230 21460 Substation works 1000022797 85352122 18 Supply of 33 kV , 1250 Amp 25kA 3 phaseVaccum Circuit Breaker with structure(combined structure to facilitatemounting of CT's as per apprd drg)andall accessories as per TS EA 98 INCLUDED 0 0
21 7000002230 21470 Substation works 1000002094 85353090 18 36 kV, 630A, 25 KA, 3-Phase DoubleBreak Isolator without E/S EA 134 INCLUDED 0 0
22 7000002230 21480 Substation works 1000002095 85353090 18 36 kV, 630A, 25 KA, 3-Phase DoubleBreak Isolator with one E/S EA 41 INCLUDED 0 0
23 7000002230 21490 Substation works 1000000001 85359090 18 Supply of 33 kV, 1 phase , 300-150/1-1 Amp Current transformer (longwithall accessories as per TS EA 294 INCLUDED 0 0
24 7000002230 21500 Substation works 1000020373 85354010 18 Supply of 30 kV, 1 phase, 10 KA porcelain housing ZnO LA with allaccessories as per TS EA 366 INCLUDED 0 0
25 7000002230 21510 Substation works 1000020375 85354010 18 Supply of 9 kV, 1 phase, 10 KA porcelain housing ZnO LA with allaccessories as per TS EA 348 INCLUDED 0 0
26 7000002230 21520 Substation works 1000000269 85359090 18 Supply of 33/√3 kV/110 /√3 Volts, 1 phase PT alongwith all accessoriesas per TS EA 294 INCLUDED 0 0
27 7000002230 21530 Substation works 1000044608 85462023 18 33 KV SOLID CORE BUS POST INSULATORS, FITTINGS AND ACCESSORIES SET 189 INCLUDED 0 0
28 7000002230 21540 Substation works 1000044609 85462023 18 45 KV SOLID CORE BUS POST INSULATORS, FITTINGS AND ACCESSORIES SET 21 INCLUDED 0 0
29 7000002230 21550 Substation works 1000028385 85042100 18 100 KVA, 33/0.433 KV, 3 PH, 50 HZ, ONAN, OUTDOOR STATION TRANSFORMERON DOUBLE POLE STRUCTURE ALONG WITH TRANSFORMER OIL AND ALLACCESSORIES AS PER TS. EA 24 INCLUDED 0 0
30 7000002230 21560 Substation works 1000022827 73089070 18 Galvanised STEEL TUBULAR POLE 540 MPA, SP64, 12 METER EA 150 INCLUDED 0 0
31 7000002230 21570 Substation works 1000044624 73089070 18 GALVANISED STEEL TUBULAR 12 MTS. 540,SP-64 POLE, MADE FROM STEELGRADE E410C EA 16 INCLUDED 0 0
32 7000002230 21580 Substation works 1000015954 73082011 18 Fabrication, galvanising and supply of Lattice Structures (MS Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 210.11 INCLUDED 0 0
33 7000002230 21590 Substation works 1000044621 73089040 18 GALVANISED FABRICATED STRUCTURE FOR 33 KV BUS & LINE GANTRY- GRADE CSTEEL STRUCTURE AS PER IS 2062 MT 23.35 INCLUDED 0 0
34 7000002230 21600 Substation works 1000022813 73089090 18 Fabrication and Supply of M.S. Galvanised items- Pole Top Bracket,V-Cross arm, Back Clamps for V-Cross arm , D P Channel, D P Channelclamp, Stay clamps angle, Stay clamps side, D P cross bracing &clamps,Guarding arm etc etc. complete as required. MT 82.98 INCLUDED 0 0
35 7000002230 21610 Substation works 1000044622 73089040 18 GALVANISED FABRICATED STRUCTURE FOR STATION TRANSFORMER, DP STRUCTUREFOR OUTGOING 11 KV FEEDERS, PORECLAIN LA, ISOLATOR, BUS COUPLERISOLATOR & BUS POST INSULATOR- GRADE C STEEL STRUCTURE AS PER IS 2062 MT 9.22 INCLUDED 0 0
36 7000002230 21620 Substation works 1000022819 73181500 18 nuts,bolts,foundation bolts and washer and other accessories forstructures. MT 32.57 INCLUDED 0 0
37 7000002230 21630 Substation works 1000022807 85462019 18 INSULATOR HARDWARE & ACCESSORIES ALL COMPLETE ALONG WITH 70 KN B&SDISC INSULATOR ( ONE SET CONSISTING OF 4NOS DISC INSULATOR) AS PERTECHNICAL SPECIFICATION. SET 513 INCLUDED 0 0
38 7000002230 21720 Substation works 1000030867 76141000 18 ACSR WOLF CONDUCTOR KM 4.831 INCLUDED 0 0
39 7000002230 22180 Substation works 1000037509 72125090 18 75X8 MS FLAT FOR EARTHING MT 123.69 INCLUDED 0 0
40 7000002230 21640 Substation works 1000029996 72125090 18 60X8MM GALVANISED FLAT FOR RAISER MT 18.6 INCLUDED 0 0
41 7000002230 21650 Substation works 1000012682 73063010 18 40mm x 3000 mm long GI Pipe earth electrode for earth pit alongwithclamping arrangement to connect GI Wire as per TS EA 677 INCLUDED 0 0
42 7000002230 21660 Substation works 1000004302 72159090 18 40 mm MS rod for Main Earthmat M 4800 INCLUDED 0 0
43 7000002230 21670 Substation works 1000028395 72149990 18 20 MM DIA., 3000 MM LONG GI ROD AND OTHER ACCESSORIES AS PER TECHNICALSPECIFICATION. SET 731 INCLUDED 0 0
44 7000002230 21680 Substation works 1000029987 85446090 18 SUPPLY OF 11 KV, XLPE INSULATED, ARMORED ALUMINIUM CABLE AS PERTS - 3CX400 SQ. MM M 350 INCLUDED 0 0
45 7000002230 21690 Substation works 1000029986 85446090 18 SUPPLY OF 11 KV, XLPE INSULATED, ARMORED ALUMINIUM CABLE AS PERTS - 3CX120 SQ. MM M 5450 INCLUDED 0 0
46 7000002230 21700 Substation works 1000029995 85479090 28 END TERMINATION KIT SUITABLE FOR TERMINATION IN CABLE BOX ON 11KVSIDE OF TRANSFORMER FOR 3CX400 SQ. MM CABLE SET 7 INCLUDED 0 0
47 7000002230 21710 Substation works 1000029994 85479090 28 END TERMINATION KIT SUITABLE FOR TERMINATION IN CABLE BOX ON 11KVSIDE OF TRANSFORMER FOR 3CX120 SQ. MM CABLE SET 50 INCLUDED 0 0
48 7000002230 21730 Substation works 1000029993 85479090 28 END TERMINATION KIT SUITABLE FOR TERMINATION IN 11 KV INDOOR VCBPANEL FOR 3CX400 SQ. MM CABLE SET 7 INCLUDED 0 0
49 7000002230 21740 Substation works 1000029991 85479090 28 END TERMINATION KIT SUITABLE FOR TERMINATION IN 11 KV INDOOR VCBPANEL FOR 3CX120 SQ. MM CABLE SET 107 INCLUDED 0 0
50 7000002230 21750 Substation works 1000029992 85479090 28 OUTDOOR END TERMINATION KIT (REQUIRED AT DOUBLE POLE STRUCTURE ) FOR11 KV 3CX120 SQ. MM. CABLE SET 58 INCLUDED 0 0
51 7000002230 21760 Substation works 1000000496 85446020 18 1.1kV grade 3.5Cx50 sqmm Armoured (PVC) Power Cable M 1800 INCLUDED 0 0
52 7000002230 21770 Substation works 1000000512 85446020 18 1.1kV grade 4Cx16 sqmm (PVC) Power Cable M 3825 INCLUDED 0 0
53 7000002230 21780 Substation works 1000000476 85446020 18 1.1kV grade 2Cx10 sqmm Armoured (PVC) Power Cable M 1665 INCLUDED 0 0
54 7000002230 21790 Substation works 1000000480 85446020 18 1.1kV grade 2Cx2.5 sqmm Control Cable M 6860 INCLUDED 0 0
55 7000002230 21800 Substation works 1000000520 85446020 18 1.1kV grade 5Cx2.5 sqmm Control Cable M 23520 INCLUDED 0 0
56 7000002230 21810 Substation works 1000000446 85446020 18 1.1kV grade 10Cx2.5 sqmm Control Cable M 11760 INCLUDED 0 0
57 7000002230 21820 Substation works 1000000450 85446020 18 1.1kV grade 12Cx2.5 sqmm Control Cable M 2400 INCLUDED 0 0
58 7000002230 21830 Substation works 1000028408 85371000 18 33KV CONTROL & RELAY PANEL ALONGWITH E/F & O/C RELAYS, MIMIC DIAGRAM,VOLTMETER, AMMETER, ANNUNCIATION WINDOWS WITH ANNUNCIATION RELAYS ANDOTHER COMPONENTS ETC AS PER TS FOR CONTROLLING POWER TRANSFORMER 33 KVVCB WITH STATIC TRI-VECTOR ENERGY METER SET 50 INCLUDED 0 0
59 7000002230 21840 Substation works 1000022810 85371000 18 SUPPLY OF 33 KV TRF. C&R PANEL (WITH O/C & E/F PROTECTION ALONGWITHALL OTHER MANDATORY SYSTEM REQUIRED FOR 5 MVA, 33/11 KV TRF) EA 7 INCLUDED 0 0
60 7000002230 21850 Substation works 1000028406 85371000 18 33KV CONTROL & RELAY PANEL ALONGWITH E/F & O/C RELAYS, MIMIC DIAGRAM,VOLTMETER, AMMETER, ANNUNCIATION WINDOWS WITH ANNUNCIATION RELAYS ANDOTHER COMPONENTS ETC AS PER TS FOR CONTROLLING 33 KV FEEDER VCB WITHSTATIC TRI-VECTOR ENERGY METER SET 41 INCLUDED 0 0
61 7000002230 21860 Substation works 1000022778 85352121 18 Supply of 11 kV, 630 Amp C&R Cum VCBPanel for incoming 11 kV feeder withPT. EA 57 INCLUDED 0 0
62 7000002230 21870 Substation works 1000022776 85352121 18 Supply of 11 kV, 630 Amp C&R Cum VCBPanel for 11 kV Bus Coupler. EA 28 INCLUDED 0 0
63 7000002230 21880 Substation works 1000022777 85352121 18 Supply of 11 kV, 630 Amp C&R Cum VCBPanel for Out-Going 11 kV feeder EA 59 INCLUDED 0 0
64 7000002230 21890 Substation works 1000000571 85073000 28 110V, 150AH, Ni-Cd type Battery Set andall other accessories complete. SET 36 INCLUDED 0 0
65 7000002230 21900 Substation works 1000000567 85044030 18 110 V, Float-Cum-Boost Battery Chargerwith full wave, full controlrectification, 50Hz Input Voltage forcharging 110V, 150AH Battery alongwithinbuit DCDB, connectors etc. completeand conection with 110V, 150AH BatterySet and single phase AC input supply. SET 36 INCLUDED 0 0
66 7000002230 21910 Substation works 1000004303 85371000 18 415V AC Distribution Board (ACDB) as per Technical Specification SET 36 INCLUDED 0 0
67 7000002230 21920 Substation works 1000028787 85371000 18 BAY MARSHELLING KIOSK COMPLETE AS PER TS EA 61 INCLUDED 0 0
68 7000002230 21930 Substation works 1000022818 85371000 18 LIGHTING SYSTEM COMPLETE FOR SWITCHYARD INCLUDING MAINGATE &SUBSTATION BOUNDARY AS PER TS EA 24 INCLUDED 0 0
69 7000002230 21940 Substation works 1000022817 94054090 12 LIGHTING SYSTEM COMPLETE FOR CONTROL ROOM BUILDING AS PER TS EA 24 INCLUDED 0 0
70 7000002230 21950 Substation works 1000029990 76169990 18 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS SET 1 INCLUDED 0 0
71 7000002230 21960 Substation works 1000022811 76169990 18 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS, 1 NO. 33 KV LINE SET 18 INCLUDED 0 0
72 7000002230 21970 Substation works 1000029989 76169990 18 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS, 2 NOS. 33 KV FEEDER. LOT 2 INCLUDED 0 0
73 7000002230 21980 Substation works 1000033204 76169990 18 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS, 3 NOS. 33 KV LINE SET 2 INCLUDED 0 0
74 7000002230 21990 Substation works 1000033205 76169990 18 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS, 4 NOS. 33 KV LINE FEEDER. SET 1 INCLUDED 0 0
75 7000002230 22000 Substation works 1000029988 76169990 18 CLAMP & CONNECTORS ETC FOR 1 NEW 33 KV LINE BAY IN EXISTING S/S LOT 5 INCLUDED 0 0
76 7000002230 22010 Substation works 1000033211 76169990 18 CLAMP & CONNECTORS ETC FOR 2 NEW 33 KV LINE BAY IN EXISTING S/S SET 2 INCLUDED 0 0
77 7000002230 22020 Substation works 1000033210 76169990 18 CLAMP & CONNECTORS ETC FOR 1 NEW 33/11 KV TRANSFORMER BAY INEXISTING S/S LOT 1 INCLUDED 0 0
78 7000002230 22030 Substation works 1000033209 76169990 18 CLAMP & CONNECTORS ETC FOR 1 NEW 33/11 KV TRANSFORMER BAY & 1REPLACEMENT OF EXISTING TRANSFORMER IN EXISTING S/S SET 3 INCLUDED 0 0
79 7000002230 22040 Substation works 1000033212 76169990 18 CLAMP & CONNECTORS ETC FOR REPLACEMENT OF 2 EXISTING TRANSFORMER INEXISTING S/S SET 1 INCLUDED 0 0
80 7000002230 22050 Substation works 1000022798 85359030 18 33 kV , 400 Amp, 3 phase , verticalmounted AB switch as per TS EA 24 INCLUDED 0 0
81 7000002230 22060 Substation works 1000028100 85049010 18 36 kV, 3-Ph Horn Gap Fuse as per Technical Specification EA 24 INCLUDED 0 0
82 7000002230 22070 Substation works 1000022782 85359030 18 11 kV , 400 Amp,3 phase , verticalmounted AB switch for Outgoing DP asper TS EA 59 INCLUDED 0 0
83 7000002230 22080 Substation works 1000012026 84241000 18 6Kg dry chemical powered type Portable Fire extinguisher EA 24 INCLUDED 0 0
84 7000002230 22090 Substation works 1000012022 84241000 18 4.5 kg CO2 type Portable Fire extinguisher EA 24 INCLUDED 0 0
85 7000002230 22100 Substation works 1000027449 84241000 18 22.5 kg CO2 type Portable Fire Extinguisher EA 24 INCLUDED 0 0
86 7000002230 22190 Substation works 1000025035 90303950 18 Hand Held Megger Measurement Test Kit(5KV) with all necessary accessories asper Technical specification. EA 24 INCLUDED 0 0
87 7000002230 22110 Substation works 1000024644 90303100 18 Digital Multimeter for testing EA 48 INCLUDED 0 0
88 7000002230 22120 Substation works 1000024639 90303390 18 Digital Earth Tester-Battery (Rechargeable) Operated Earth Resistance/Resistivity Tester EA 24 INCLUDED 0 0
89 7000002230 22130 Substation works 1000025500 73239990 12 Supply Stainless Steel oil samplingbottles (one liter capacity) as perTechnical specification EA 48 INCLUDED 0 0
90 7000002230 22140 Substation works 1000033187 85471090 28 11 KV DISCHARGE ROD(1 SET OF 3 RODS) SET 24 INCLUDED 0 0
91 7000002230 22150 Substation works 1000033199 90303900 18 BATTERY VOLTAGE TESTER EA 48 INCLUDED 0 0
92 7000002230 22160 Substation works 1000033192 85471090 28 33 KV DISCHARGE ROD (1 SET OF 3 RODS) SET 24 INCLUDED 0 0
93 7000002230 22170 Substation works 1000044854 84212900 18 SUPPLY OF OIL FILTRATION MACHINE WITH FILTRATION CAPACITY OF 4K LITREPER HOUR EA 1 INCLUDED 0 0
94 7000002230 22200 New 33 kV line with ACSR Racoon 1000030863 76141000 18 ACSR RACOON CONDUCTOR KM 2377.725 INCLUDED 0 0
95 7000002230 22210 New 33 kV line with ACSR Racoon 1000022827 73089070 18 Galvanised STEEL TUBULAR POLE 540 MPA, SP64, 12 METER EA 14173 INCLUDED 0 0
96 7000002230 22220 New 33 kV line with ACSR Racoon 1000044624 73089070 18 GALVANISED STEEL TUBULAR 12 MTS. 540,SP-64 POLE, MADE FROM STEELGRADE E410C EA 1788 INCLUDED 0 0
97 7000002230 22230 New 33 kV line with ACSR Racoon 1000022825 73089070 18 STEEL TUBULAR POLE 540 MPA, SP76, 14.5 METER EA 1610 INCLUDED 0 0
98 7000002230 22240 New 33 kV line with ACSR Racoon 1000044623 73089070 18 GALVANISED STEEL TUBULAR 14.5 MTS. 540,SP-76 POLE, MADE FROM STEELGRADE E410C EA 179 INCLUDED 0 0
99 7000002230 22250 New 33 kV line with ACSR Racoon 1000022813 73089090 18 Fabrication and Supply of M.S. Galvanised items- Pole Top Bracket,V-Cross arm, Back Clamps for V-Cross arm , D P Channel, D P Channelclamp, Stay clamps angle, Stay clamps side, D P cross bracing &clamps,Guarding arm etc etc. complete as required. MT 1172.35 INCLUDED 0 0
100 7000002230 22260 New 33 kV line with ACSR Racoon 1000022819 73181500 18 nuts,bolts,foundation bolts and washer and other accessories forstructures. MT 117.235 INCLUDED 0 0
101 7000002230 22270 New 33 kV line with ACSR Racoon 1000022795 85462033 18 33 KV PORCELAIN PIN INSULATOR WITH 900 MM CREEPAGE DISTANCE ALONGWITH10 KN PIN, NUT AND WASHERS COMPLETE AS PER TS SET 45266 INCLUDED 0 0
102 7000002230 22280 New 33 kV line with ACSR Racoon 1000022806 85462019 18 INSULATOR HARDWARE & ACCESSORIES ALL COMPLETE ALONG WITH 70 KN B&SDISC INSULATOR ( ONE SET CONSISTING OF 3 NOS DISC INSULATOR) AS PER TS SET 13146 INCLUDED 0 0
103 7000002230 22290 New 33 kV line with ACSR Racoon 1000022807 85462019 18 INSULATOR HARDWARE & ACCESSORIES ALL COMPLETE ALONG WITH 70 KN B&SDISC INSULATOR ( ONE SET CONSISTING OF 4NOS DISC INSULATOR) AS PERTECHNICAL SPECIFICATION. SET 5634 INCLUDED 0 0
104 7000002230 22300 New 33 kV line with ACSR Racoon 1000022824 76052990 18 PREFORMED INSULATOR BINDINGS (SUITABLE FOR ACSR CONDUCTOR) FOR 33 KVPIN INSULATOR SET 45266 INCLUDED 0 0
105 7000002230 22310 New 33 kV line with ACSR Racoon 1000022796 73089090 18 33 kV Stay set complete including Hardware, Stay wire (7/10 SWG), insulator etc as per TS SET 15306 INCLUDED 0 0
106 7000002230 22320 New 33 kV line with ACSR Racoon 1000022814 85462050 18 GUY STRAIN INSULATORS DESIGNATION 'C' EA 30612 INCLUDED 0 0
107 7000002230 22330 New 33 kV line with ACSR Racoon 1000022805 73121020 18 Stay wire (7/8 SWG) KG 135444.65 INCLUDED 0 0
108 7000002230 22340 New 33 kV line with ACSR Racoon 1000032344 72171010 18 8SWG GI WIRE FOR PROTECTIVE GUARDING & EARTHING AS PER TS KG 226301.79 INCLUDED 0 0
109 7000002230 22350 New 33 kV line with ACSR Racoon 1000012682 73063010 18 40mm x 3000 mm long GI Pipe earth electrode for earth pit alongwithclamping arrangement to connect GI Wire as per TS EA 2860 INCLUDED 0 0
110 7000002230 22360 Highway/Railway Crossing by Underground 1000001990 85446090 18 33 kV 3Cx300 sq.mm aluminium, armoured XLPE cable M 3600 INCLUDED 0 0
111 7000002230 22370 Highway/Railway Crossing by Underground 1000008867 85446020 18 33 kV Outdoor Termination Kit suitable for 33 kV, 3Cx300 sq.mm XLPEcable SET 48 INCLUDED 0 0
112 7000002230 22380 Highway/Railway Crossing by Underground 1000022798 85359030 18 33 kV , 400 Amp, 3 phase , verticalmounted AB switch as per TS EA 24 INCLUDED 0 0
113 7000002230 22400 Supply of FO Cabling & Accessories 1000030947 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE (WITH CENTRAL FIBRE OPTIC UNITOF STEEL TUBE DESIGN ) KM 705 INCLUDED 0 0
114 7000002230 22410 Supply of FO Cabling & Accessories 1000020444 82057000 18 Suspension clamp assembly for 24 fibre OPGW EA 13750 INCLUDED 0 0
115 7000002230 22420 Supply of FO Cabling & Accessories 1000010558 82057000 18 Dead end Tension clamp for 24 fibre OPGW EA 46 INCLUDED 0 0
116 7000002230 22430 Supply of FO Cabling & Accessories 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 353 INCLUDED 0 0
117 7000002230 22440 Supply of FO Cabling & Accessories 1000017489 82057000 18 Passing Tension clamp for 24 fibre OPGW EA 2467 INCLUDED 0 0
118 7000002230 22450 Supply of FO Cabling & Accessories 1000031041 82057000 18 TENSION FITTINGS ASSEMBLY ON SUSPENSION TOWER FOR 24F OPGW INCLUDINGALL ACCESSORIES AT JOINT BOX (SPLICING) LOCATION SET 50 INCLUDED 0 0
119 7000002230 22460 Supply of FO Cabling & Accessories 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 3790 INCLUDED 0 0
120 7000002230 22470 Supply of FO Cabling & Accessories 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 150 INCLUDED 0 0
121 7000002230 22480 Supply of FO Cabling & Accessories 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 353 INCLUDED 0 0
122 7000002230 22490 Supply of FO Cabling & Accessories 1000031020 85447090 18 48 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE (WITH CENTRAL FIBRE OPTIC UNITOF STEEL TUBE DESIGN ) KM 10 INCLUDED 0 0
123 7000002230 22500 Supply of FO Cabling & Accessories 1000020445 82057000 18 Suspension clamp assembly for 48 fibre OPGW EA 195 INCLUDED 0 0
124 7000002230 22510 Supply of FO Cabling & Accessories 1000010559 82057000 18 Dead end Tension clamp for 48 fibre OPGW EA 4 INCLUDED 0 0
125 7000002230 22520 Supply of FO Cabling & Accessories 1000031040 82057000 18 TENSION FITTINGS ASSEMBLY FOR 48F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 5 INCLUDED 0 0
126 7000002230 22530 Supply of FO Cabling & Accessories 1000033147 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 48 FIBEROPGW SET 35 INCLUDED 0 0
127 7000002230 22540 Supply of FO Cabling & Accessories 1000033143 82057000 18 TENSION ASSEMBLY FOR JOINTING AT SUSPENSION TOWER FOR 48 FIBER OPGW SET 5 INCLUDED 0 0
128 7000002230 22550 Supply of FO Cabling & Accessories 1000022418 82057000 18 Vibration Damper for 48 fibre OPGW EA 10 INCLUDED 0 0
129 7000002230 22560 Supply of FO Cabling & Accessories 1000010820 82057000 18 Down Lead clamp Assembly for 48 fibre OPGW EA 90 INCLUDED 0 0
130 7000002230 22570 Supply of FO Cabling & Accessories 1000014201 85353090 18 Joint Box for 48 fibre OPGW EA 5 INCLUDED 0 0
131 7000002230 22580 Supply of FO Cabling & Accessories 1000030834 85447090 18 24 FIBRE ADSS KM 60 INCLUDED 0 0
132 7000002230 22590 Supply of FO Cabling & Accessories 1000034328 82057000 18 INSTALLATION HARDWARE SET FOR 24F ARIEL (ADSS) FIBRE OPTIC CABLINGINCLUDING ALL CABLE FITTINGS & ACCESSORIES EXCEPT JOINT BOX. SET 60 INCLUDED 0 0
133 7000002230 22680 Supply of FO Cabling & Accessories 1000014198 85444992 28 Joint box 24Fibre EA 30 INCLUDED 0 0
134 7000002230 22720 Supply of FO Cabling & Accessories 1000050017 85389000 18 24F UNARMOURED FIBRE OPTIC CABLE (UGFO) KM 4 INCLUDED 0 0
135 7000002230 22600 Supply of FO Cabling & Accessories 1000023340 85444992 28 Joint box 24Fibre EA 3 INCLUDED 0 0
136 7000002230 22610 Supply of FO Cabling & Accessories 1000012674 73063010 18 GI Pipe 100mm dia M 100 INCLUDED 0 0
137 7000002230 22620 Supply of FO Cabling & Accessories 1000023654 68109100 28 RCC Hume pipe (NP3) 100mm (inside) M 40 INCLUDED 0 0
138 7000002230 22630 Supply of FO Cabling & Accessories 1000023514 39172190 18 PLB HDPE pipe O.D. 40 mm Including accessories as per technicalSpecification. M 4000 INCLUDED 0 0
139 7000002230 22650 Supply of FO Cabling & Accessories 1000023470 85372000 18 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 48F EA 35 INCLUDED 0 0
140 7000002230 22660 Supply of FO Cabling & Accessories 1000023471 85372000 18 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F EA 7 INCLUDED 0 0
141 7000002230 22670 Supply of FO Cabling & Accessories 1000037545 85447090 18 24F (DWSM) APPROACH FIBRE OPTIC CABLE KM 24 INCLUDED 0 0
142 7000002230 22690 Supply of FO Cabling & Accessories 1000013927 39269079 28 Installation hardware set for above 24 Fibre, Fibre Optic ApproachCable SET 24 INCLUDED 0 0
143 7000002230 22700 Supply of FO Cabling & Accessories 1000037546 85447090 18 48F (DWSM) APPROACH FIBRE OPTIC CABLE KM 1 INCLUDED 0 0
144 7000002230 22710 Supply of FO Cabling & Accessories 1000013926 82057000 18 Installation hardware set for above 48 Fibre, Fibre Optic ApproachCable SET 1 INCLUDED 0 0
145 7000002230 22740 Spares for FO Cabling & Accessories 1000030947 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE (WITH CENTRAL FIBRE OPTIC UNITOF STEEL TUBE DESIGN ) KM 15 INCLUDED 0 0
146 7000002230 22750 Spares for FO Cabling & Accessories 1000020444 82057000 18 Suspension clamp assembly for 24 fibre OPGW EA 138 INCLUDED 0 0
147 7000002230 22760 Spares for FO Cabling & Accessories 1000010558 82057000 18 Dead end Tension clamp for 24 fibre OPGW EA 3 INCLUDED 0 0
148 7000002230 22770 Spares for FO Cabling & Accessories 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 4 INCLUDED 0 0
149 7000002230 22780 Spares for FO Cabling & Accessories 1000017489 82057000 18 Passing Tension clamp for 24 fibre OPGW EA 26 INCLUDED 0 0
150 7000002230 22790 Spares for FO Cabling & Accessories 1000031041 82057000 18 TENSION FITTINGS ASSEMBLY ON SUSPENSION TOWER FOR 24F OPGW INCLUDINGALL ACCESSORIES AT JOINT BOX (SPLICING) LOCATION SET 3 INCLUDED 0 0
151 7000002230 22800 Spares for FO Cabling & Accessories 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 39 INCLUDED 0 0
152 7000002230 22810 Spares for FO Cabling & Accessories 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 21 INCLUDED 0 0
153 7000002230 22820 Spares for FO Cabling & Accessories 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 6 INCLUDED 0 0
154 7000002230 22830 Spares for FO Cabling & Accessories 1000031020 85447090 18 48 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE (WITH CENTRAL FIBRE OPTIC UNITOF STEEL TUBE DESIGN ) KM 4 INCLUDED 0 0
155 7000002230 22840 Spares for FO Cabling & Accessories 1000020445 82057000 18 Suspension clamp assembly for 48 fibre OPGW EA 2 INCLUDED 0 0
156 7000002230 22850 Spares for FO Cabling & Accessories 1000010559 82057000 18 Dead end Tension clamp for 48 fibre OPGW EA 1 INCLUDED 0 0
157 7000002230 22860 Spares for FO Cabling & Accessories 1000031040 82057000 18 TENSION FITTINGS ASSEMBLY FOR 48F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 INCLUDED 0 0
158 7000002230 22870 Spares for FO Cabling & Accessories 1000033147 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 48 FIBEROPGW SET 1 INCLUDED 0 0
159 7000002230 22880 Spares for FO Cabling & Accessories 1000033143 82057000 18 TENSION ASSEMBLY FOR JOINTING AT SUSPENSION TOWER FOR 48 FIBER OPGW SET 1 INCLUDED 0 0
160 7000002230 22890 Spares for FO Cabling & Accessories 1000022418 82057000 18 Vibration Damper for 48 fibre OPGW EA 6 INCLUDED 0 0
161 7000002230 22900 Spares for FO Cabling & Accessories 1000010820 82057000 18 Down Lead clamp Assembly for 48 fibre OPGW EA 1 INCLUDED 0 0
162 7000002230 22910 Spares for FO Cabling & Accessories 1000014201 85353090 18 Joint Box for 48 fibre OPGW EA 2 INCLUDED 0 0
163 7000002230 22920 Spares for FO Cabling & Accessories 1000030834 85447090 18 24 FIBRE ADSS KM 15 INCLUDED 0 0
164 7000002230 22930 Spares for FO Cabling & Accessories 1000034328 82057000 18 INSTALLATION HARDWARE SET FOR 24F ARIEL (ADSS) FIBRE OPTIC CABLINGINCLUDING ALL CABLE FITTINGS & ACCESSORIES EXCEPT JOINT BOX. SET 15 INCLUDED 0 0
165 7000002230 22940 Spares for FO Cabling & Accessories 1000014198 85444992 28 Joint box 24Fibre EA 6 INCLUDED 0 0
166 7000002230 22730 Spares for FO Cabling & Accessories 1000050017 85389000 18 24F UNARMOURED FIBRE OPTIC CABLE (UGFO) KM 4 INCLUDED 0 0
167 7000002230 22950 Spares for FO Cabling & Accessories 1000023340 85444992 28 Joint box 24Fibre EA 2 INCLUDED 0 0
168 7000002230 22970 Spares for FO Cabling & Accessories 1000013927 39269079 28 Installation hardware set for above 24 Fibre, Fibre Optic ApproachCable SET 6 INCLUDED 0 0
169 7000002230 22960 Spares for FO Cabling & Accessories 1000037545 85447090 18 24F (DWSM) APPROACH FIBRE OPTIC CABLE KM 6 INCLUDED 0 0
170 7000002230 22980 Spares for FO Cabling & Accessories 1000037546 85447090 18 48F (DWSM) APPROACH FIBRE OPTIC CABLE KM 1 INCLUDED 0 0
171 7000002230 22990 Spares for FO Cabling & Accessories 1000013926 82057000 18 Installation hardware set for above 48 Fibre, Fibre Optic ApproachCable SET 1 INCLUDED 0 0
Total Ex-Works Price 0.00 0 1 0
Total Type Test charges as per Schedule-7 0.00
Total Ex-works Price including Type Test charges 0.00
Note : # In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Date : -- Printed Name : 0
Place : 00-Jan-00 Designation : 0
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Schedule - 2
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Local Transportation, In-transit Insurance, loading and unloading
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Description Material Code Description Unit Quantity Unit Freight, In-transit Insurance, loading & unloading Charges Total Freight, In-transit Insurance, loading & unloading Charges
(I) Balance work of Package ARP-DMS-04
1 7000002230 23030 66Kv S/C TL 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 31.239 INCLUDED
2 7000002230 23040 66Kv S/C TL 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 18.023 INCLUDED
3 7000002230 23050 66Kv S/C TL 1000015276 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 0.236 INCLUDED
4 7000002230 23060 66Kv S/C TL 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 3.337 INCLUDED
5 7000002230 23070 66Kv S/C TL 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 4.268 INCLUDED
6 7000002230 23080 66Kv S/C TL 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.205 INCLUDED
7 7000002230 23090 66Kv S/C TL 1000010003 Supply of Counterpoise type (120 m length) EA 24 INCLUDED
8 7000002230 23100 66Kv S/C TL 1000032563 DANGER PLATE FOR 66 KV EA 24 INCLUDED
9 7000002230 23110 66Kv S/C TL 1000034828 NUMBER PLATE FOR 66 KV TOWER EA 24 INCLUDED
10 7000002230 23120 66Kv S/C TL 1000017508 Phase Plate (Set of three) SET 24 INCLUDED
11 7000002230 23130 66Kv S/C TL 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 24 INCLUDED
12 7000002230 23140 66Kv S/C TL 1000030857 ACSR DOG CONDUCTOR KM 15.75 INCLUDED
13 7000002230 23150 66Kv S/C TL 1000034331 COMPOSITE LONGROD INSULATOR - 66KV - 45KN (LENGTH 1160 MM) EA 144 INCLUDED
14 7000002230 23160 66Kv S/C TL 1000034337 SINGLE TENSION STRING-66KV ACSR DOG CONDUCTOR EA 144 INCLUDED
15 7000002230 23170 66Kv S/C TL 1000015512 Mid Span Compression Joint for Conductor-ACSR Dog EA 10 INCLUDED
16 7000002230 23180 66Kv S/C TL 1000018441 Repair Sleeve for Conductor-ACSR Dog EA 4 INCLUDED
17 7000002230 23190 66Kv S/C TL 1000022429 Vibration Damper for Conductor-ACSR Dog EA 144 INCLUDED
18 7000002230 21440 Substation works 1000001109 2.5MVA, 33/11 kV power transformer with Cu winding along with allaccessories and oil EA 50 INCLUDED
19 7000002230 21450 Substation works 1000004936 5MVA, 33/11 kV power transformer with Cu winding along with allaccessories and oil EA 7 INCLUDED
20 7000002230 21460 Substation works 1000022797 Supply of 33 kV , 1250 Amp 25kA 3 phaseVaccum Circuit Breaker with structure(combined structure to facilitatemounting of CT's as per apprd drg)andall accessories as per TS EA 98 INCLUDED
21 7000002230 21470 Substation works 1000002094 36 kV, 630A, 25 KA, 3-Phase DoubleBreak Isolator without E/S EA 134 INCLUDED
22 7000002230 21480 Substation works 1000002095 36 kV, 630A, 25 KA, 3-Phase DoubleBreak Isolator with one E/S EA 41 INCLUDED
23 7000002230 21490 Substation works 1000000001 Supply of 33 kV, 1 phase , 300-150/1-1 Amp Current transformer (longwithall accessories as per TS EA 294 INCLUDED
24 7000002230 21500 Substation works 1000020373 Supply of 30 kV, 1 phase, 10 KA porcelain housing ZnO LA with allaccessories as per TS EA 366 INCLUDED
25 7000002230 21510 Substation works 1000020375 Supply of 9 kV, 1 phase, 10 KA porcelain housing ZnO LA with allaccessories as per TS EA 348 INCLUDED
26 7000002230 21520 Substation works 1000000269 Supply of 33/√3 kV/110 /√3 Volts, 1 phase PT alongwith all accessoriesas per TS EA 294 INCLUDED
27 7000002230 21530 Substation works 1000044608 33 KV SOLID CORE BUS POST INSULATORS, FITTINGS AND ACCESSORIES SET 189 INCLUDED
28 7000002230 21540 Substation works 1000044609 45 KV SOLID CORE BUS POST INSULATORS, FITTINGS AND ACCESSORIES SET 21 INCLUDED
29 7000002230 21550 Substation works 1000028385 100 KVA, 33/0.433 KV, 3 PH, 50 HZ, ONAN, OUTDOOR STATION TRANSFORMERON DOUBLE POLE STRUCTURE ALONG WITH TRANSFORMER OIL AND ALLACCESSORIES AS PER TS. EA 24 INCLUDED
30 7000002230 21560 Substation works 1000022827 Galvanised STEEL TUBULAR POLE 540 MPA, SP64, 12 METER EA 150 INCLUDED
31 7000002230 21570 Substation works 1000044624 GALVANISED STEEL TUBULAR 12 MTS. 540,SP-64 POLE, MADE FROM STEELGRADE E410C EA 16 INCLUDED
32 7000002230 21580 Substation works 1000015954 Fabrication, galvanising and supply of Lattice Structures (MS Steel),to be designed during detailed engineering, for towers, beams andequipment support structure including pack plates / packwashers andgusset plates excluding fasteners and foundation bolts MT 210.11 INCLUDED
33 7000002230 21590 Substation works 1000044621 GALVANISED FABRICATED STRUCTURE FOR 33 KV BUS & LINE GANTRY- GRADE CSTEEL STRUCTURE AS PER IS 2062 MT 23.35 INCLUDED
34 7000002230 21600 Substation works 1000022813 Fabrication and Supply of M.S. Galvanised items- Pole Top Bracket,V-Cross arm, Back Clamps for V-Cross arm , D P Channel, D P Channelclamp, Stay clamps angle, Stay clamps side, D P cross bracing &clamps,Guarding arm etc etc. complete as required. MT 82.98 INCLUDED
35 7000002230 21610 Substation works 1000044622 GALVANISED FABRICATED STRUCTURE FOR STATION TRANSFORMER, DP STRUCTUREFOR OUTGOING 11 KV FEEDERS, PORECLAIN LA, ISOLATOR, BUS COUPLERISOLATOR & BUS POST INSULATOR- GRADE C STEEL STRUCTURE AS PER IS 2062 MT 9.22 INCLUDED
36 7000002230 21620 Substation works 1000022819 nuts,bolts,foundation bolts and washer and other accessories forstructures. MT 32.57 INCLUDED
37 7000002230 21630 Substation works 1000022807 INSULATOR HARDWARE & ACCESSORIES ALL COMPLETE ALONG WITH 70 KN B&SDISC INSULATOR ( ONE SET CONSISTING OF 4NOS DISC INSULATOR) AS PERTECHNICAL SPECIFICATION. SET 513 INCLUDED
38 7000002230 21720 Substation works 1000030867 ACSR WOLF CONDUCTOR KM 4.831 INCLUDED
39 7000002230 22180 Substation works 1000037509 75X8 MS FLAT FOR EARTHING MT 123.69 INCLUDED
40 7000002230 21640 Substation works 1000029996 60X8MM GALVANISED FLAT FOR RAISER MT 18.6 INCLUDED
41 7000002230 21650 Substation works 1000012682 40mm x 3000 mm long GI Pipe earth electrode for earth pit alongwithclamping arrangement to connect GI Wire as per TS EA 677 INCLUDED
42 7000002230 21660 Substation works 1000004302 40 mm MS rod for Main Earthmat M 4800 INCLUDED
43 7000002230 21670 Substation works 1000028395 20 MM DIA., 3000 MM LONG GI ROD AND OTHER ACCESSORIES AS PER TECHNICALSPECIFICATION. SET 731 INCLUDED
44 7000002230 21680 Substation works 1000029987 SUPPLY OF 11 KV, XLPE INSULATED, ARMORED ALUMINIUM CABLE AS PERTS - 3CX400 SQ. MM M 350 INCLUDED
45 7000002230 21690 Substation works 1000029986 SUPPLY OF 11 KV, XLPE INSULATED, ARMORED ALUMINIUM CABLE AS PERTS - 3CX120 SQ. MM M 5450 INCLUDED
46 7000002230 21700 Substation works 1000029995 END TERMINATION KIT SUITABLE FOR TERMINATION IN CABLE BOX ON 11KVSIDE OF TRANSFORMER FOR 3CX400 SQ. MM CABLE SET 7 INCLUDED
47 7000002230 21710 Substation works 1000029994 END TERMINATION KIT SUITABLE FOR TERMINATION IN CABLE BOX ON 11KVSIDE OF TRANSFORMER FOR 3CX120 SQ. MM CABLE SET 50 INCLUDED
48 7000002230 21730 Substation works 1000029993 END TERMINATION KIT SUITABLE FOR TERMINATION IN 11 KV INDOOR VCBPANEL FOR 3CX400 SQ. MM CABLE SET 7 INCLUDED
49 7000002230 21740 Substation works 1000029991 END TERMINATION KIT SUITABLE FOR TERMINATION IN 11 KV INDOOR VCBPANEL FOR 3CX120 SQ. MM CABLE SET 107 INCLUDED
50 7000002230 21750 Substation works 1000029992 OUTDOOR END TERMINATION KIT (REQUIRED AT DOUBLE POLE STRUCTURE ) FOR11 KV 3CX120 SQ. MM. CABLE SET 58 INCLUDED
51 7000002230 21760 Substation works 1000000496 1.1kV grade 3.5Cx50 sqmm Armoured (PVC) Power Cable M 1800 INCLUDED
52 7000002230 21770 Substation works 1000000512 1.1kV grade 4Cx16 sqmm (PVC) Power Cable M 3825 INCLUDED
53 7000002230 21780 Substation works 1000000476 1.1kV grade 2Cx10 sqmm Armoured (PVC) Power Cable M 1665 INCLUDED
54 7000002230 21790 Substation works 1000000480 1.1kV grade 2Cx2.5 sqmm Control Cable M 6860 INCLUDED
55 7000002230 21800 Substation works 1000000520 1.1kV grade 5Cx2.5 sqmm Control Cable M 23520 INCLUDED
56 7000002230 21810 Substation works 1000000446 1.1kV grade 10Cx2.5 sqmm Control Cable M 11760 INCLUDED
57 7000002230 21820 Substation works 1000000450 1.1kV grade 12Cx2.5 sqmm Control Cable M 2400 INCLUDED
58 7000002230 21830 Substation works 1000028408 33KV CONTROL & RELAY PANEL ALONGWITH E/F & O/C RELAYS, MIMIC DIAGRAM,VOLTMETER, AMMETER, ANNUNCIATION WINDOWS WITH ANNUNCIATION RELAYS ANDOTHER COMPONENTS ETC AS PER TS FOR CONTROLLING POWER TRANSFORMER 33 KVVCB WITH STATIC TRI-VECTOR ENERGY METER SET 50 INCLUDED
59 7000002230 21840 Substation works 1000022810 SUPPLY OF 33 KV TRF. C&R PANEL (WITH O/C & E/F PROTECTION ALONGWITHALL OTHER MANDATORY SYSTEM REQUIRED FOR 5 MVA, 33/11 KV TRF) EA 7 INCLUDED
60 7000002230 21850 Substation works 1000028406 33KV CONTROL & RELAY PANEL ALONGWITH E/F & O/C RELAYS, MIMIC DIAGRAM,VOLTMETER, AMMETER, ANNUNCIATION WINDOWS WITH ANNUNCIATION RELAYS ANDOTHER COMPONENTS ETC AS PER TS FOR CONTROLLING 33 KV FEEDER VCB WITHSTATIC TRI-VECTOR ENERGY METER SET 41 INCLUDED
61 7000002230 21860 Substation works 1000022778 Supply of 11 kV, 630 Amp C&R Cum VCBPanel for incoming 11 kV feeder withPT. EA 57 INCLUDED
62 7000002230 21870 Substation works 1000022776 Supply of 11 kV, 630 Amp C&R Cum VCBPanel for 11 kV Bus Coupler. EA 28 INCLUDED
63 7000002230 21880 Substation works 1000022777 Supply of 11 kV, 630 Amp C&R Cum VCBPanel for Out-Going 11 kV feeder EA 59 INCLUDED
64 7000002230 21890 Substation works 1000000571 110V, 150AH, Ni-Cd type Battery Set andall other accessories complete. SET 36 INCLUDED
65 7000002230 21900 Substation works 1000000567 110 V, Float-Cum-Boost Battery Chargerwith full wave, full controlrectification, 50Hz Input Voltage forcharging 110V, 150AH Battery alongwithinbuit DCDB, connectors etc. completeand conection with 110V, 150AH BatterySet and single phase AC input supply. SET 36 INCLUDED
66 7000002230 21910 Substation works 1000004303 415V AC Distribution Board (ACDB) as per Technical Specification SET 36 INCLUDED
67 7000002230 21920 Substation works 1000028787 BAY MARSHELLING KIOSK COMPLETE AS PER TS EA 61 INCLUDED
68 7000002230 21930 Substation works 1000022818 LIGHTING SYSTEM COMPLETE FOR SWITCHYARD INCLUDING MAINGATE &SUBSTATION BOUNDARY AS PER TS EA 24 INCLUDED
69 7000002230 21940 Substation works 1000022817 LIGHTING SYSTEM COMPLETE FOR CONTROL ROOM BUILDING AS PER TS EA 24 INCLUDED
70 7000002230 21950 Substation works 1000029990 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS SET 1 INCLUDED
71 7000002230 21960 Substation works 1000022811 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS, 1 NO. 33 KV LINE SET 18 INCLUDED
72 7000002230 21970 Substation works 1000029989 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS, 2 NOS. 33 KV FEEDER. LOT 2 INCLUDED
73 7000002230 21980 Substation works 1000033204 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS, 3 NOS. 33 KV LINE SET 2 INCLUDED
74 7000002230 21990 Substation works 1000033205 CLAMP & CONNECTORS ETC FOR SUB-STATION HAVING 2 NOS. 33/11 KVTRANSFORMERS, 4 NOS. 33 KV LINE FEEDER. SET 1 INCLUDED
75 7000002230 22000 Substation works 1000029988 CLAMP & CONNECTORS ETC FOR 1 NEW 33 KV LINE BAY IN EXISTING S/S LOT 5 INCLUDED
76 7000002230 22010 Substation works 1000033211 CLAMP & CONNECTORS ETC FOR 2 NEW 33 KV LINE BAY IN EXISTING S/S SET 2 INCLUDED
77 7000002230 22020 Substation works 1000033210 CLAMP & CONNECTORS ETC FOR 1 NEW 33/11 KV TRANSFORMER BAY INEXISTING S/S LOT 1 INCLUDED
78 7000002230 22030 Substation works 1000033209 CLAMP & CONNECTORS ETC FOR 1 NEW 33/11 KV TRANSFORMER BAY & 1REPLACEMENT OF EXISTING TRANSFORMER IN EXISTING S/S SET 3 INCLUDED
79 7000002230 22040 Substation works 1000033212 CLAMP & CONNECTORS ETC FOR REPLACEMENT OF 2 EXISTING TRANSFORMER INEXISTING S/S SET 1 INCLUDED
80 7000002230 22050 Substation works 1000022798 33 kV , 400 Amp, 3 phase , verticalmounted AB switch as per TS EA 24 INCLUDED
81 7000002230 22060 Substation works 1000028100 36 kV, 3-Ph Horn Gap Fuse as per Technical Specification EA 24 INCLUDED
82 7000002230 22070 Substation works 1000022782 11 kV , 400 Amp,3 phase , verticalmounted AB switch for Outgoing DP asper TS EA 59 INCLUDED
83 7000002230 22080 Substation works 1000012026 6Kg dry chemical powered type Portable Fire extinguisher EA 24 INCLUDED
84 7000002230 22090 Substation works 1000012022 4.5 kg CO2 type Portable Fire extinguisher EA 24 INCLUDED
85 7000002230 22100 Substation works 1000027449 22.5 kg CO2 type Portable Fire Extinguisher EA 24 INCLUDED
86 7000002230 22190 Substation works 1000025035 Hand Held Megger Measurement Test Kit(5KV) with all necessary accessories asper Technical specification. EA 24 INCLUDED
87 7000002230 22110 Substation works 1000024644 Digital Multimeter for testing EA 48 INCLUDED
88 7000002230 22120 Substation works 1000024639 Digital Earth Tester-Battery (Rechargeable) Operated Earth Resistance/Resistivity Tester EA 24 INCLUDED
89 7000002230 22130 Substation works 1000025500 Supply Stainless Steel oil samplingbottles (one liter capacity) as perTechnical specification EA 48 INCLUDED
90 7000002230 22140 Substation works 1000033187 11 KV DISCHARGE ROD(1 SET OF 3 RODS) SET 24 INCLUDED
91 7000002230 22150 Substation works 1000033199 BATTERY VOLTAGE TESTER EA 48 INCLUDED
92 7000002230 22160 Substation works 1000033192 33 KV DISCHARGE ROD (1 SET OF 3 RODS) SET 24 INCLUDED
93 7000002230 22170 Substation works 1000044854 SUPPLY OF OIL FILTRATION MACHINE WITH FILTRATION CAPACITY OF 4K LITREPER HOUR EA 1 INCLUDED
94 7000002230 22200 New 33 kV line with ACSR Racoon 1000030863 ACSR RACOON CONDUCTOR KM 2377.725 INCLUDED
95 7000002230 22210 New 33 kV line with ACSR Racoon 1000022827 Galvanised STEEL TUBULAR POLE 540 MPA, SP64, 12 METER EA 14173 INCLUDED
96 7000002230 22220 New 33 kV line with ACSR Racoon 1000044624 GALVANISED STEEL TUBULAR 12 MTS. 540,SP-64 POLE, MADE FROM STEELGRADE E410C EA 1788 INCLUDED
97 7000002230 22230 New 33 kV line with ACSR Racoon 1000022825 STEEL TUBULAR POLE 540 MPA, SP76, 14.5 METER EA 1610 INCLUDED
98 7000002230 22240 New 33 kV line with ACSR Racoon 1000044623 GALVANISED STEEL TUBULAR 14.5 MTS. 540,SP-76 POLE, MADE FROM STEELGRADE E410C EA 179 INCLUDED
99 7000002230 22250 New 33 kV line with ACSR Racoon 1000022813 Fabrication and Supply of M.S. Galvanised items- Pole Top Bracket,V-Cross arm, Back Clamps for V-Cross arm , D P Channel, D P Channelclamp, Stay clamps angle, Stay clamps side, D P cross bracing &clamps,Guarding arm etc etc. complete as required. MT 1172.35 INCLUDED
100 7000002230 22260 New 33 kV line with ACSR Racoon 1000022819 nuts,bolts,foundation bolts and washer and other accessories forstructures. MT 117.235 INCLUDED
101 7000002230 22270 New 33 kV line with ACSR Racoon 1000022795 33 KV PORCELAIN PIN INSULATOR WITH 900 MM CREEPAGE DISTANCE ALONGWITH10 KN PIN, NUT AND WASHERS COMPLETE AS PER TS SET 45266 INCLUDED
102 7000002230 22280 New 33 kV line with ACSR Racoon 1000022806 INSULATOR HARDWARE & ACCESSORIES ALL COMPLETE ALONG WITH 70 KN B&SDISC INSULATOR ( ONE SET CONSISTING OF 3 NOS DISC INSULATOR) AS PER TS SET 13146 INCLUDED
103 7000002230 22290 New 33 kV line with ACSR Racoon 1000022807 INSULATOR HARDWARE & ACCESSORIES ALL COMPLETE ALONG WITH 70 KN B&SDISC INSULATOR ( ONE SET CONSISTING OF 4NOS DISC INSULATOR) AS PERTECHNICAL SPECIFICATION. SET 5634 INCLUDED
104 7000002230 22300 New 33 kV line with ACSR Racoon 1000022824 PREFORMED INSULATOR BINDINGS (SUITABLE FOR ACSR CONDUCTOR) FOR 33 KVPIN INSULATOR SET 45266 INCLUDED
105 7000002230 22310 New 33 kV line with ACSR Racoon 1000022796 33 kV Stay set complete including Hardware, Stay wire (7/10 SWG), insulator etc as per TS SET 15306 INCLUDED
106 7000002230 22320 New 33 kV line with ACSR Racoon 1000022814 GUY STRAIN INSULATORS DESIGNATION 'C' EA 30612 INCLUDED
107 7000002230 22330 New 33 kV line with ACSR Racoon 1000022805 Stay wire (7/8 SWG) KG 135444.65 INCLUDED
108 7000002230 22340 New 33 kV line with ACSR Racoon 1000032344 8SWG GI WIRE FOR PROTECTIVE GUARDING & EARTHING AS PER TS KG 226301.79 INCLUDED
109 7000002230 22350 New 33 kV line with ACSR Racoon 1000012682 40mm x 3000 mm long GI Pipe earth electrode for earth pit alongwithclamping arrangement to connect GI Wire as per TS EA 2860 INCLUDED
110 7000002230 22360 Highway/Railway Crossing by Underground 1000001990 33 kV 3Cx300 sq.mm aluminium, armoured XLPE cable M 3600 INCLUDED
111 7000002230 22370 Highway/Railway Crossing by Underground 1000008867 33 kV Outdoor Termination Kit suitable for 33 kV, 3Cx300 sq.mm XLPEcable SET 48 INCLUDED
112 7000002230 22380 Highway/Railway Crossing by Underground 1000022798 33 kV , 400 Amp, 3 phase , verticalmounted AB switch as per TS EA 24 INCLUDED
113 7000002230 22400 Supply of FO Cabling & Accessories 1000030947 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE (WITH CENTRAL FIBRE OPTIC UNITOF STEEL TUBE DESIGN ) KM 705 INCLUDED
114 7000002230 22410 Supply of FO Cabling & Accessories 1000020444 Suspension clamp assembly for 24 fibre OPGW EA 13750 INCLUDED
115 7000002230 22420 Supply of FO Cabling & Accessories 1000010558 Dead end Tension clamp for 24 fibre OPGW EA 46 INCLUDED
116 7000002230 22430 Supply of FO Cabling & Accessories 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 353 INCLUDED
117 7000002230 22440 Supply of FO Cabling & Accessories 1000017489 Passing Tension clamp for 24 fibre OPGW EA 2467 INCLUDED
118 7000002230 22450 Supply of FO Cabling & Accessories 1000031041 TENSION FITTINGS ASSEMBLY ON SUSPENSION TOWER FOR 24F OPGW INCLUDINGALL ACCESSORIES AT JOINT BOX (SPLICING) LOCATION SET 50 INCLUDED
119 7000002230 22460 Supply of FO Cabling & Accessories 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 3790 INCLUDED
120 7000002230 22470 Supply of FO Cabling & Accessories 1000022417 Vibration Damper for 24 fibre OPGW EA 150 INCLUDED
121 7000002230 22480 Supply of FO Cabling & Accessories 1000014198 Joint Box for 24 fibre OPGW EA 353 INCLUDED
122 7000002230 22490 Supply of FO Cabling & Accessories 1000031020 48 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE (WITH CENTRAL FIBRE OPTIC UNITOF STEEL TUBE DESIGN ) KM 10 INCLUDED
123 7000002230 22500 Supply of FO Cabling & Accessories 1000020445 Suspension clamp assembly for 48 fibre OPGW EA 195 INCLUDED
124 7000002230 22510 Supply of FO Cabling & Accessories 1000010559 Dead end Tension clamp for 48 fibre OPGW EA 4 INCLUDED
125 7000002230 22520 Supply of FO Cabling & Accessories 1000031040 TENSION FITTINGS ASSEMBLY FOR 48F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 5 INCLUDED
126 7000002230 22530 Supply of FO Cabling & Accessories 1000033147 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 48 FIBEROPGW SET 35 INCLUDED
127 7000002230 22540 Supply of FO Cabling & Accessories 1000033143 TENSION ASSEMBLY FOR JOINTING AT SUSPENSION TOWER FOR 48 FIBER OPGW SET 5 INCLUDED
128 7000002230 22550 Supply of FO Cabling & Accessories 1000022418 Vibration Damper for 48 fibre OPGW EA 10 INCLUDED
129 7000002230 22560 Supply of FO Cabling & Accessories 1000010820 Down Lead clamp Assembly for 48 fibre OPGW EA 90 INCLUDED
130 7000002230 22570 Supply of FO Cabling & Accessories 1000014201 Joint Box for 48 fibre OPGW EA 5 INCLUDED
131 7000002230 22580 Supply of FO Cabling & Accessories 1000030834 24 FIBRE ADSS KM 60 INCLUDED
132 7000002230 22590 Supply of FO Cabling & Accessories 1000034328 INSTALLATION HARDWARE SET FOR 24F ARIEL (ADSS) FIBRE OPTIC CABLINGINCLUDING ALL CABLE FITTINGS & ACCESSORIES EXCEPT JOINT BOX. SET 60 INCLUDED
133 7000002230 22680 Supply of FO Cabling & Accessories 1000014198 Joint box 24Fibre EA 30 INCLUDED
134 7000002230 22720 Supply of FO Cabling & Accessories 1000050017 24F UNARMOURED FIBRE OPTIC CABLE (UGFO) KM 4 INCLUDED
135 7000002230 22600 Supply of FO Cabling & Accessories 1000023340 Joint box 24Fibre EA 3 INCLUDED
136 7000002230 22610 Supply of FO Cabling & Accessories 1000012674 GI Pipe 100mm dia M 100 INCLUDED
137 7000002230 22620 Supply of FO Cabling & Accessories 1000023654 RCC Hume pipe (NP3) 100mm (inside) M 40 INCLUDED
138 7000002230 22630 Supply of FO Cabling & Accessories 1000023514 PLB HDPE pipe O.D. 40 mm Including accessories as per technicalSpecification. M 4000 INCLUDED
139 7000002230 22650 Supply of FO Cabling & Accessories 1000023470 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 48F EA 35 INCLUDED
140 7000002230 22660 Supply of FO Cabling & Accessories 1000023471 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F EA 7 INCLUDED
141 7000002230 22670 Supply of FO Cabling & Accessories 1000037545 24F (DWSM) APPROACH FIBRE OPTIC CABLE KM 24 INCLUDED
142 7000002230 22690 Supply of FO Cabling & Accessories 1000013927 Installation hardware set for above 24 Fibre, Fibre Optic ApproachCable SET 24 INCLUDED
143 7000002230 22700 Supply of FO Cabling & Accessories 1000037546 48F (DWSM) APPROACH FIBRE OPTIC CABLE KM 1 INCLUDED
144 7000002230 22710 Supply of FO Cabling & Accessories 1000013926 Installation hardware set for above 48 Fibre, Fibre Optic ApproachCable SET 1 INCLUDED
145 7000002230 22740 Spares for FO Cabling & Accessories 1000030947 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE (WITH CENTRAL FIBRE OPTIC UNITOF STEEL TUBE DESIGN ) KM 15 INCLUDED
146 7000002230 22750 Spares for FO Cabling & Accessories 1000020444 Suspension clamp assembly for 24 fibre OPGW EA 138 INCLUDED
147 7000002230 22760 Spares for FO Cabling & Accessories 1000010558 Dead end Tension clamp for 24 fibre OPGW EA 3 INCLUDED
148 7000002230 22770 Spares for FO Cabling & Accessories 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 4 INCLUDED
149 7000002230 22780 Spares for FO Cabling & Accessories 1000017489 Passing Tension clamp for 24 fibre OPGW EA 26 INCLUDED
150 7000002230 22790 Spares for FO Cabling & Accessories 1000031041 TENSION FITTINGS ASSEMBLY ON SUSPENSION TOWER FOR 24F OPGW INCLUDINGALL ACCESSORIES AT JOINT BOX (SPLICING) LOCATION SET 3 INCLUDED
151 7000002230 22800 Spares for FO Cabling & Accessories 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 39 INCLUDED
152 7000002230 22810 Spares for FO Cabling & Accessories 1000022417 Vibration Damper for 24 fibre OPGW EA 21 INCLUDED
153 7000002230 22820 Spares for FO Cabling & Accessories 1000014198 Joint Box for 24 fibre OPGW EA 6 INCLUDED
154 7000002230 22830 Spares for FO Cabling & Accessories 1000031020 48 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE (WITH CENTRAL FIBRE OPTIC UNITOF STEEL TUBE DESIGN ) KM 4 INCLUDED
155 7000002230 22840 Spares for FO Cabling & Accessories 1000020445 Suspension clamp assembly for 48 fibre OPGW EA 2 INCLUDED
156 7000002230 22850 Spares for FO Cabling & Accessories 1000010559 Dead end Tension clamp for 48 fibre OPGW EA 1 INCLUDED
157 7000002230 22860 Spares for FO Cabling & Accessories 1000031040 TENSION FITTINGS ASSEMBLY FOR 48F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 INCLUDED
158 7000002230 22870 Spares for FO Cabling & Accessories 1000033147 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 48 FIBEROPGW SET 1 INCLUDED
159 7000002230 22880 Spares for FO Cabling & Accessories 1000033143 TENSION ASSEMBLY FOR JOINTING AT SUSPENSION TOWER FOR 48 FIBER OPGW SET 1 INCLUDED
160 7000002230 22890 Spares for FO Cabling & Accessories 1000022418 Vibration Damper for 48 fibre OPGW EA 6 INCLUDED
161 7000002230 22900 Spares for FO Cabling & Accessories 1000010820 Down Lead clamp Assembly for 48 fibre OPGW EA 1 INCLUDED
162 7000002230 22910 Spares for FO Cabling & Accessories 1000014201 Joint Box for 48 fibre OPGW EA 2 INCLUDED
163 7000002230 22920 Spares for FO Cabling & Accessories 1000030834 24 FIBRE ADSS KM 15 INCLUDED
164 7000002230 22930 Spares for FO Cabling & Accessories 1000034328 INSTALLATION HARDWARE SET FOR 24F ARIEL (ADSS) FIBRE OPTIC CABLINGINCLUDING ALL CABLE FITTINGS & ACCESSORIES EXCEPT JOINT BOX. SET 15 INCLUDED
165 7000002230 22940 Spares for FO Cabling & Accessories 1000014198 Joint box 24Fibre EA 6 INCLUDED
166 7000002230 22730 Spares for FO Cabling & Accessories 1000050017 24F UNARMOURED FIBRE OPTIC CABLE (UGFO) KM 4 INCLUDED
167 7000002230 22950 Spares for FO Cabling & Accessories 1000023340 Joint box 24Fibre EA 2 INCLUDED
168 7000002230 22970 Spares for FO Cabling & Accessories 1000013927 Installation hardware set for above 24 Fibre, Fibre Optic ApproachCable SET 6 INCLUDED
169 7000002230 22960 Spares for FO Cabling & Accessories 1000037545 24F (DWSM) APPROACH FIBRE OPTIC CABLE KM 6 INCLUDED
170 7000002230 22980 Spares for FO Cabling & Accessories 1000037546 48F (DWSM) APPROACH FIBRE OPTIC CABLE KM 1 INCLUDED
171 7000002230 22990 Spares for FO Cabling & Accessories 1000013926 Installation hardware set for above 48 Fibre, Fibre Optic ApproachCable SET 1 INCLUDED
Total of Schedule-2 0.00
Date : -- Printed Name : 0
Place : 00-Jan-00 Designation : 0
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Schedule - 3
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
Contract Services Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Sector-29, Multipackage lum-sum 0.00%
Gurgaon (Haryana) - 122001
Installation Charges : All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column ‘8’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘10’ is confirmed. If not indicate applicable rate of GST # Description Unit Quantity Unit Charges Total Charges Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
I Balance work of Package ARP-DMS-04
1 7000002230 23020 60 10 Substation works 150000001 998736 18 Installation, testing & commissioning of 2.5 MVA, 33/11 kV transformer along with all accessories complete as per TS SET 50 INCLUDED 0 0 0%
2 7000002230 23020 60 20 Substation works 150000003 998736 18 Installation, testing & commissioning of 5 MVA, 33/11 kV transformer along with all accessories complete as per TS EA 7 INCLUDED 0 0 5%
3 7000002230 23020 60 30 Substation works 150000089 995429 18 Dismantling of existing 1/1.6 MVA , 33/11 kV transformer along with all accessories EA 5 INCLUDED 0 0 12%
4 7000002230 23020 60 40 Substation works 150000092 998736 18 Loading, transporting and unloading 1/1.6 MVA dismantled 33/11 kV transformer alongwith all accessories from location ofdismantling to designated store of DISCOM EA 5 INCLUDED 0 0 18%
5 7000002230 23020 60 50 Substation works 150000005 998736 18 Erection with structure, testing & commissioning of new 33 kV , 1250 Amp VCBs EA 93 INCLUDED 0 0 28%
6 7000002230 23020 60 60 Substation works 100007088 995421 18 Dismantling of existing 33 kV, VCB foundation manually/ by mechanical means including stacking of steel bars and disposal ofunserviceable material as per direction of Engineer - in- charge . EA 5 INCLUDED 0 0
7 7000002230 23020 60 70 Substation works 150000105 995429 18 Replacement of existing 33 kV, VCB by the new 33 kV , 1250 Amp. VCB, testing & commissioning of new VCB as per TS. This includesdismantling of existing VCB structure & erection of new VCB structure on existing/modified foundation (Required if existing VCBneeds to be replaced) EA 5 INCLUDED 0 0
8 7000002230 23020 60 80 Substation works 150000007 998736 18 Erection alongwith structure , testing & commissioning of new 33 kV , 630 Amp DBCR Isolator with earth switch EA 41 INCLUDED 0 0
9 7000002230 23020 60 90 Substation works 150000009 998736 18 Erection alongwith structure , testing & commissioning of new 33 kV , 630 Amp DBCR Isolator without earth switch EA 128 INCLUDED 0 0
10 7000002230 23020 60 100 Substation works 100007089 995421 18 Dismantling of existing 33 kV, isolator structure & erection of new isolator structure on existing/modified foundation(Required ifexisting isolator structure needs to be replaced) . EA 6 INCLUDED 0 0
11 7000002230 23020 60 110 Substation works 150000118 995429 18 Dismantling of existing 33 kV, isolator structure & erection of new isolator structure on existing/modified foundation (Requiredif existing isolator structure needs to be replaced) EA 6 INCLUDED 0 0
12 7000002230 23020 60 120 Substation works 150000123 995429 18 Replacement of existing 33 kV, isolator by the new 33 kV , 630 Amp DBCR isolator, testing & commissioning of new isolator (withoutearth switch) as per TS. (Required if existing isolator needs to be replaced) EA 6 INCLUDED 0 0
13 7000002230 23020 60 130 Substation works 150000010 998736 18 Installation of 33 kV, 1 phase,300-150/1-1 Amp new Current Transformerincluding testing & commissioning (Tobe installed on combined VCB structure) EA 279 INCLUDED 0 0
14 7000002230 23020 60 140 Substation works 150000112 995429 18 Replacement of existing 33 kV, 1 phase Current transformer by the new 33 kV, 1 phase Current transformer on existing structure,testing & commissioning of new CT as per TS. (Required if CT in existing transformer bay needs to be replaced. It is assumed theexisting CT foundation & structure is adequate. However, if some modification is required in existing structure to match withmounting base of new CT, the bidder will carry out the same at no extra cost to POWERGRID/DISCOM ) EA 15 INCLUDED 0 0
15 7000002230 23020 60 150 Substation works 150000012 998736 18 Erection alongwith structure 33 kV, 1 phase, 10 KA new porcelain LA including testing & commissioning EA 156 INCLUDED 0 0
16 7000002230 23020 60 160 Substation works 150000015 998736 18 Installation of 33 kV, 1 phase, 10 KA porcelain LA on line gantry including testing & commissioning for 33 kV line EA 123 INCLUDED 0 0
17 7000002230 23020 60 170 Substation works 150000124 995429 18 Replacement of existing 30 kV LA by the new 33 kV , 1 phase porcelain LA on existing structure, testing & commissioning of newLA as per TS. (Required if LA in existing transformer bay needs to be replaced. It is assumed the existing LA foundation &structure is adequate. However, if some modification is required in existing structure to match with mounting base of new LA, thebidder will carry out the same at no extra cost to POWERGRID/DISCOM ) EA 15 INCLUDED 0 0
18 7000002230 23020 60 180 Substation works 150000014 998736 18 Erection alongwith structure 11 kV, 1 phase, 10 KA new porcelain LA including testing & commissioning EA 156 INCLUDED 0 0
19 7000002230 23020 60 190 Substation works 150000125 995429 18 Replacement of existing 9 kV LA by the new 9 kV , 1 phase porcelain LA on existing structure, testing & commissioning of new LAas per TS. (Required if LA in existing transformer bay needs to be replaced. It is assumed the existing LA foundation & structureis adequate. However, if some modification is required in existing structure to match with mounting base of new LA, the bidder willcarry out the same at no extra cost to POWERGRID/ DISCOM ) EA 15 INCLUDED 0 0
20 7000002230 23020 60 200 Substation works 150000016 998736 18 Installation [33/Sqrt(3)] kV/[110 /sqrt(3)] Volts, 1 phase PT including testing & commissioning (To be mounted on Bus Gantry) EA 156 INCLUDED 0 0
21 7000002230 23020 60 210 Substation works 150000115 998736 18 Installation [33/Sqrt(3)] kV/[110 /sqrt(3)] Volts, 1 phase PT alongwith structure including testing & commissioning EA 123 INCLUDED 0 0
22 7000002230 23020 60 220 Substation works 150000117 995429 18 Replacement of existing PT with new [33/Sqrt(3)] kV/[110 /sqrt(3)] Volts, 1 phase PT on existing structure, testing &commissioning of new PT as per TS. (Required if PT existing PT needs to be replaced. It is assumed the existing PT foundation &structure is adequate. However, if some modification is required in existing structure to match with mounting base of new PT, thebidder will carry out the same at no extra cost to POWERGRID/DISCOM ) EA 15 INCLUDED 0 0
23 7000002230 23020 60 230 Substation works 150000019 998736 18 Erection alongwith structure 33 kV post insulators assembly comprises 2 nos. of insulators along with all fittings and accessories EA 189 INCLUDED 0 0
24 7000002230 23020 60 240 Substation works 100006923 995468 18 Erection alongwith structure 45 kV post insulators along with allfittings and accessories . SET 21 INCLUDED 0 0
25 7000002230 23020 60 250 Substation works 150000154 998736 18 Replacement of existing 33 kV post insulator by new 33 kV post insulator on existing structure, testing & commissioning of newpost insulator as per TS. (Required if existing post insulator needs to be replaced. It is assumed the existing post insulatorfoundation & structure is adequate. However, if some modification is required in existing structure to match with mounting base ofnew post insulator, the bidder will carry out the same at no extra cost to POWERGRID/DISCOM ) EA 15 INCLUDED 0 0
26 7000002230 23020 60 260 Substation works 150000020 998736 18 Erection, testing & commissioning of100 kVA, 33/0.415 kV, 3 ph, 50 Hz,ONAN, Outdoor Station Transformer ondouble pole steel tubular poleincluding PCC (1:2:4) foundation withfor pole,erection poles and all steelfabricated structures, installationof transformer and all accessories vizAB switch, HG fuse,LA etc complete inall respect EA 24 INCLUDED 0 0
27 7000002230 23020 60 270 Substation works 150000150 995429 18 Loading, transporting & unloading the old VCB (all 3 poles)/Isolator (all 3 poles)/LA (3 No.)/CT (3No.)/PT (3 No.)/PI (3 No.) alongwith all accessories from site of dismantling to the designated stores of DISCOM (for this purpose any item for all the 3 phase makeone set e.g. 3 PI will make one set, similarly 3 PTs will make another set) SET 24 INCLUDED 0 0
28 7000002230 23020 60 280 Substation works 150000021 995455 18 Erection of 33 kV bus gantry (consisting of 2 towers & 1 beam) as per approved drawing. This also includes the erection of onespike per gantry for lightning protection and its earthing EA 100 INCLUDED 0 0
29 7000002230 23020 60 290 Substation works 150000023 995455 18 Erection of 33 kV line gantry (consisting of 2 towers & 1 beam) as per approved drawing. This also includes the erection of onespike per gantry for lightning protection and its earthing EA 23 INCLUDED 0 0
30 7000002230 23020 60 300 Substation works 150000024 995455 18 Erection of 33 kV line gantry (Total 3 towers & 2 beams) as per approved drawing. This also includes the erection of one spikeper gantry for lightning protection and its earthing EA 4 INCLUDED 0 0
31 7000002230 23020 60 310 Substation works 150000161 995455 18 Erection of 33 kV line gantry (consisting of 4 towers & 3 beams) as per approved drawing. This also includes the erection of onespike per gantry for lightning protection and its earthing EA 2 INCLUDED 0 0
32 7000002230 23020 60 320 Substation works 150000082 995455 18 Erection of 33 kV line gantry (Total 5 towers & 4 beams) as per approved drawing. This also includes the erection of one spikeper gantry for lightning protection and its earthing EA 1 INCLUDED 0 0
33 7000002230 23020 60 330 Substation works 150000027 995468 18 Stringing of 33 kV Bus bar, Line bay & transformer bay, as required, including all droppers, jumpers and inter connection withall outdoor equipments using ACSR wolf conductor & insulator with hardware, clamps, connector etc complete in all respect M 4831.2 INCLUDED 0 0
34 7000002230 23020 60 340 Substation works 150000028 998739 18 Laying of earth mat in switch yard using 75 x 8 mm MS flat as per approved drawing MT 123.69 INCLUDED 0 0
35 7000002230 23020 60 350 Substation works 150000173 998739 18 Earthing structures/equipment in switch yard using 60 x 8 mm galvanize MS flat for raiser as per approved drawing MT 18.6 INCLUDED 0 0
36 7000002230 23020 60 360 Substation works 150000030 998739 18 Earthing - using 40 mm dia 3000mm long pipe earth electrodes with test links, RCC pits, CI cover hinged to CI frame, Charcoal, Salt(Alternatively Calcium Bentonite clay & black soil as per TS) and other accessories required for connection with earth mat (including supply of all materials required for treated earth pit except supply items like 40 mm dia GI pipe with fixing arrangement) SET 677 INCLUDED 0 0
37 7000002230 23020 60 370 Substation works 150000031 998739 18 Earthing - using 20mm dia, 3000mm long GI Rod as earth electrodes and other accessories etc. ( Untreated) to be buried below groundand other accessories required for connection with earth mat ( including supply of all materials required for untreated earth pitexcept supply items like 20 mm dia GI rod with fixing arrangement) SET 731 INCLUDED 0 0
38 7000002230 23020 60 380 Substation works 150000032 998739 18 DRILLING OF HOLE IN ALL KINDS OF SOIL/BOULDER/ROCK UPTO 50 MTR DEPTH BELOW GROUND LEVEL AT 4 LOCATIONS FOR INSTALLATION OF 40 MM DIAMS ROD USING ANY SUITABLE METHOD AS PER IS STANDARD. THIS INCLUDES SUPPLY OF ALL MATERIALS (EXCLUDING 40 MM DIA MS ROD),EQUIPMENTS, LABOURS, TOOLS ETC REQUIRED FOR BORING AND PROTECTING THE SOIL FROM FALLING BACK INTO THE PIT DURING THE PROCESS ALLCOMPLETE AS PER TECHNICAL SPECIFICATION. THIS INCLUDES INSTALLATION OF 40 MM DIA ROD IN THE PIT AND BACK FILLING THE SAME WITHSOIL FREE FROM FOREIGN MATERIAL. M 4800 INCLUDED 0 0
39 7000002230 23020 60 390 Substation works 150000033 998739 18 MOBILISATION /TRANSPORTATION CHARGES OF PLANT & MACHINERY,TOOLS & TACKLES,MEN & MATERIALS ETC. LS 24 INCLUDED 0 0
40 7000002230 23020 60 400 Substation works 150000034 998739 18 LAYING OF 11 KV HT, XLPE CABLE IN GROUND INCLUDING TERMINATION IN CABLE BOX ON POWER TRANSFORMER ,INDOOR 11KV VCB PANEL AND 11KVOUTDOOR DP STRUCTURE- 3 CORE X 120 MM2 SINGLE RUN M 5450 INCLUDED 0 0
41 7000002230 23020 60 410 Substation works 150000035 998739 18 LAYING OF 11 KV HT, XLPE CABLE IN GROUND INCLUDING TERMINATION IN CABLE BOX ON POWER TRANSFORMER ,INDOOR 11KV VCB PANEL AND 11KVOUTDOOR DP STRUCTURE- 3 CORE X 400 MM2 SINGLE RUN M 350 INCLUDED 0 0
42 7000002230 23020 60 420 Substation works 150000036 998739 18 Erection of double pole structure usingsteel tubular pole including PCC(1:2:4) foundation for pole, erectionpoles and all steel fabricatedstructures along with allaccessories, viz LA, AB switch etccomplete in all respect for 11kVoutgoing feeder. EA 59 INCLUDED 0 0
43 7000002230 23020 60 430 Substation works 150000037 998739 18 LAYING OF 1.1 KV GRADE PVC INSULATED, ARMORED 4C X 16 MM2 ALUMINUM CABLE INCLUDING ITS TERMINATION ALONG WITH SUPPLY &INSTALLATION OF ALL ACCESSORIES LIKE DOUBLE COMPRESSION TYPE CABLE GLANDS, FERULES, LUGGING ETC. AS PER APPROVED CABLE SCHEDULE. M 3825 INCLUDED 0 0
44 7000002230 23020 60 440 Substation works 150000038 998739 18 LAYING OF 1.1 KV GRADE PVC INSULATED, ARMORED 3.5CX50 MM2 ALUMINUM CABLE INCLUDING ITS TERMINATION ALONG WITH SUPPLY &INSTALLATION OF ALL ACCESSORIES LIKE DOUBLE COMPRESSION TYPE CABLE GLANDS, FERULES, LUGGING ETC. AS PER APPROVED CABLE SCHEDULE. M 1800 INCLUDED 0 0
45 7000002230 23020 60 450 Substation works 150000039 998739 18 LAYING OF 1.1 KV GRADE PVC INSULATED, ARMORED 2C X 10 MM2 COPPER CABLE INCLUDING ITS TERMINATION ALONG WITH SUPPLY & INSTALLATIONOF ALL ACCESSORIES LIKE DOUBLE COMPRESSION TYPE CABLE GLANDS, FERULES, LUGGING ETC. AS PER APPROVED CABLE SCHEDULE. M 1665 INCLUDED 0 0
46 7000002230 23020 60 460 Substation works 150000040 998739 18 LAYING OF 1.1 KV GRADE PVC INSULATED, ARMORED 2C X 2.5 MM2 COPPER CABLE INCLUDING ITS TERMINATION ALONG WITH SUPPLY &INSTALLATION OF ALL ACCESSORIES LIKE DOUBLE COMPRESSION TYPE CABLE GLANDS, FERULES, LUGGING ETC. AS PER APPROVED CABLE SCHEDULE. M 6860 INCLUDED 0 0
47 7000002230 23020 60 470 Substation works 150000041 998739 18 LAYING OF 1.1 KV GRADE PVC INSULATED, ARMORED 5C X 2.5 MM2 COPPER CABLE INCLUDING ITS TERMINATION ALONG WITH SUPPLY &INSTALLATION OF ALL ACCESSORIES LIKE DOUBLE COMPRESSION TYPE CABLE GLANDS, FERULES, LUGGING ETC. AS PER APPROVED CABLE SCHEDULE. M 23520 INCLUDED 0 0
48 7000002230 23020 60 480 Substation works 150000042 998739 18 LAYING OF 1.1 KV GRADE PVC INSULATED, ARMORED 10C X 2.5 MM2 COPPER CABLE INCLUDING ITS TERMINATION ALONG WITH SUPPLY &INSTALLATION OF ALL ACCESSORIES LIKE DOUBLE COMPRESSION TYPE CABLE GLANDS, FERULES, LUGGING ETC. AS PER APPROVED CABLE SCHEDULE. M 11760 INCLUDED 0 0
49 7000002230 23020 60 490 Substation works 150000043 998739 18 LAYING OF 1.1 KV GRADE PVC INSULATED, ARMORED 12C X 2.5 MM2 COPPER CABLE INCLUDING ITS TERMINATION ALONG WITH SUPPLY &INSTALLATION OF ALL ACCESSORIES LIKE DOUBLE COMPRESSION TYPE CABLE GLANDS, FERULES, LUGGING ETC. AS PER APPROVED CABLE SCHEDULE. M 2400 INCLUDED 0 0
50 7000002230 23020 60 500 Substation works 150000044 998736 18 Installation (including foundation, as per approved drawing, alongwith supply of all foundation material), testing & commissioningof 33 kV C&R panel for Power trf. EA 53 INCLUDED 0 0
51 7000002230 23020 60 510 Substation works 150000128 995429 18 Replacement of existing 33 kV Trf. C&R panel with new 33 kV Trf. C&R panel , testing & commissioning of new C&R panel as per TS.(Required if existing C&R panel is not suitable for new trf.)This includes all activities required to complete the work. EA 4 INCLUDED 0 0
52 7000002230 23020 60 520 Substation works 150000045 998736 18 Installation (including foundation, as per approved drawing, alongwith supply of all foundation material), testing & commissioningof 33 kV C&R panel for 33 kV line EA 41 INCLUDED 0 0
53 7000002230 23020 60 530 Substation works 150000046 998736 18 INSTALLATION (INCLUDING FOUNDATION, AS PER APPROVED DRAWING, ALONG WITH SUPPLY OF ALL FOUNDATION MATERIAL) , TESTING &COMMISSIONING OF NEW 11 KV, 630 AMP C&R CUM VCB INCOMER FEEDER PANELS AS PER APPROVED DRAWING. THIS INCLUDES ALL INTER-PANELCONNECTIONS (ALL MATERIAL EXCEPT CABLE REQUIRED FOR THIS PURPOSE WILL BE INCLUDED IN THIS ITEM.) EA 53 INCLUDED 0 0
54 7000002230 23020 60 540 Substation works 150000047 998736 18 INSTALLATION (INCLUDING FOUNDATION, AS PER APPROVED DRAWING, ALONG WITH SUPPLY OF ALL FOUNDATION MATERIAL) , TESTING &COMMISSIONING OF NEW 11 KV, 630 AMP C&R CUM VCB BUS COUPLER PANELS AS PER APPROVED DRAWING. THIS INCLUDES ALL INTER-PANELCONNECTIONS (ALL MATERIAL EXCEPT CABLE REQUIRED FOR THIS PURPOSE WILL BE INCLUDED IN THIS ITEM.) EA 28 INCLUDED 0 0
55 7000002230 23020 60 550 Substation works 150000048 998736 18 INSTALLATION (INCLUDING FOUNDATION, AS PER APPROVED DRAWING, ALONG WITH SUPPLY OF ALL FOUNDATION MATERIAL) , TESTING &COMMISSIONING OF NEW 11 KV, 630 AMP C&R CUM VCB OUT GOING FEEDER PANELS AS PER APPROVED DRAWING. THIS INCLUDES ALL INTER-PANELCONNECTIONS (ALL MATERIAL EXCEPT CABLE REQUIRED FOR THIS PURPOSE WILL BE INCLUDED IN THIS ITEM.) EA 59 INCLUDED 0 0
56 7000002230 23020 60 560 Substation works 150000129 995429 18 Replacement of existing 11 kV C&R cum VCB panel with new 11 kV C&R cum VCB panel for in-coming/out-going/Bus Coupler panels ,testing & commissioning of new panel as per TS. (Required if existing C&R cum VCB panel is not suitable). This includes allactivities required to complete the work and to deposit the dismantled panel to the designated store of DISCOM. EA 4 INCLUDED 0 0
57 7000002230 23020 60 570 Substation works 150000049 998736 18 Installation, testing & commissioningof 110V, 150 AH, Ni-Cd type Battery Setalongwith supply & installation ofaccessories SET 36 INCLUDED 0 0
58 7000002230 23020 60 580 Substation works 150000050 998736 18 Installation, testing & commissioningof 110V, Float-Cum-Boost BatteryCharger & in-built DCDB alongwithsupply & installation of allaccessories to complete the DC powersystem ( with 110V, 150 AH Battery)as per TS. EA 36 INCLUDED 0 0
59 7000002230 23020 60 590 Substation works 150000051 998739 18 Installation of (floor/wall mounted including supply of all material required for installation), testing & commissioning of 415Volts AC Distribution board/panel alongwith supply & installation of all accessories to complete auxiliary AC power supply systemas per TS. EA 36 INCLUDED 0 0
60 7000002230 23020 60 600 Substation works 150000052 998739 18 Installation of Bay Marshalling Kiosk (including foundation, as per approved drawing, along with supply of all foundationmaterial) , testing & commissioning complete with cabling as per TS EA 61 INCLUDED 0 0
61 7000002230 23020 60 610 Substation works 150000053 998739 18 Installation of all fittings & fixtures as per approved layout complete with cabling, switch boards etc for switchyard LightingSystem , main-gate & substation boundary as per TS SET 24 INCLUDED 0 0
62 7000002230 23020 60 620 Substation works 150000054 998739 18 Installation of all fittings & fixtures as per approved layout complete with cabling, switch boards etc for control room buildinglightng as per TS SET 24 INCLUDED 0 0
63 7000002230 23020 60 630 Substation works 100001324 995433 18 Excavation in all types of soil and rock including backfilling disposal etc. for all leads and lifts M3 35640 INCLUDED 0 0
64 7000002230 23020 60 640 Substation works 100001325 995454 18 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) M3 1630 INCLUDED 0 0
65 7000002230 23020 60 650 Substation works 100001326 995454 18 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) M3 172 INCLUDED 0 0
66 7000002230 23020 60 660 Substation works 100001754 995454 18 Providing and laying of Reinforced Cement Concrete 1:1.5:3 including pre cast, shuttering, Grouting of pockets & underpinning butexcluding steel reinforcement M3 5715 INCLUDED 0 0
67 7000002230 23020 60 670 Substation works 100001329 995454 18 Steel Reinforcement MT 475 INCLUDED 0 0
68 7000002230 23020 60 680 Substation works 100001331 995455 18 Misc. Structural steel including rails, embedments, edge protection angles, gratings etc. but excluding the reinforcement steel andsteel for lattice and pipe structures. MT 15.13 INCLUDED 0 0
69 7000002230 23020 60 690 Substation works 100003114 995454 18 External finishing / painting of fire wall (water proofing cement paint) (DSR 13.44.1) M2 1242 INCLUDED 0 0
70 7000002230 23020 60 700 Substation works 100001740 995441 18 Septic tank and soakpit for CRB EA 24 INCLUDED 0 0
71 7000002230 23020 60 710 Substation works 100001683 995414 18 Control Room Building - Civil Works All civil works as per drawing and specifications complete, including - brickwork, finishing(external and internal), windows etc. However, excavation, PCC, RCC and reinforcement shall be paid separately as per BPS. M2 3840 INCLUDED 0 0
72 7000002230 23020 60 720 Substation works 100001460 995414 18 All civil works as per drawing and specification( but excluding excavation, PCC, RCC, reinforcement and external finish) forextension of control room building M2 120 INCLUDED 0 0
73 7000002230 23020 60 730 Substation works 150000055 995432 18 Soil Investigation & Contour Survey of Substation area (New Sub-station) EA 24 INCLUDED 0 0
74 7000002230 23020 60 740 Substation works 150000059 995428 18 Gravel filling in switchyard area excluding road, trenches etc. M3 2280 INCLUDED 0 0
75 7000002230 23020 60 750 Substation works 150000174 995454 18 Construction of Boundary Wall ( including supply of all material) with fixing of MS angle & Barbed Wire fencing all along theboundary wall including supply and fixing of main gate - complete with painting etc all as per approved drawing & TS (Measurementfor this purpose will include length of gate along boundary wall) M 4320 INCLUDED 0 0
76 7000002230 23020 60 760 Substation works 150000061 995477 18 CONSTRUCTION (INCLUDING SUPPLY OF ALL MATERIAL) ERECTION OF SECURITY FENCING WITH TOE WALL ALONGWITH ONE SWITCHYARD GATE AS PERAPPROVED DRAWINGS & TS. M 1320 INCLUDED 0 0
77 7000002230 23020 60 770 Substation works 150000062 995462 18 Construction of Drainage System in the Substation premises all complete as approved Drawing. M 4128 INCLUDED 0 0
78 7000002230 23020 60 780 Substation works 150000175 995421 18 Construction of 3.75 meter wide RCC Approach Road (including supply of all material) all complete as per approved drawing & TS. M 2400 INCLUDED 0 0
79 7000002230 23020 60 790 Substation works 150000176 995454 18 Construction (including supply of all material) of Cable Trench alongwith pre-cast RCC Trench Cover, Brick Work wherever requiredall complete as approved Drawing & TS outside the control room building. - 0.5 Meter wide Trench ( 500 mm deep) M 720 INCLUDED 0 0
80 7000002230 23020 60 800 Substation works 150000065 995454 18 Construction (including supply of all material) of Cable Trench alongwith pre-cast RCC Trench Cover, Brick Work wherever requiredall complete as approved Drawing & TS outside the control room building. - 0.5 Meter wide Trench ( 500 mm deep) M 840 INCLUDED 0 0
81 7000002230 23020 60 810 Substation works 150000132 995454 18 Construction (including supply of all material) for extension of trench in existing control room required for installation of new C&R panels as per approved drawing - 0.5 Mtrs wide Trench ( 500 mm deep). This item will be executed if no trench is available incontrol room for placing new planels M 48 INCLUDED 0 0
82 7000002230 23020 60 820 Substation works 150000133 995454 18 Construction (including supply of all material) for extension of trench in existing control room required for installation of new C&R panels as per approved drawing - 0.75 Mtrs wide Trench ( 500 mm deep) M 36 INCLUDED 0 0
83 7000002230 23020 60 830 Substation works 150000067 998739 18 Sinking of Tubewell and installation of motor operated submersible pump of suitable capacity and reputed make (All items to besupplied by the contractor. Make of motor/pump to be approved by POWERGRID) EA 24 INCLUDED 0 0
84 7000002230 23020 60 840 Substation works 150000068 995429 18 Dismantling of existing security fencing & depositing the dismatled material to the designated store of DISCOM including itloading, un-loading & transportation M 168 INCLUDED 0 0
85 7000002230 23020 60 850 Substation works 100006920 995456 18 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6coarse sand : 12 graded stone aggregate 20 mm nominal size) uptoplinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) . M3 4800 INCLUDED 0 0
86 7000002230 23020 60 860 Substation works 100006921 995456 18 Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up withcement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level andthe like.:Cement mortar 1:6 (1 cement : 6 coarse sand) . M3 3600 INCLUDED 0 0
87 7000002230 23020 60 870 Substation works 170002803 995473 18 Providing and fixing 100mm UPVC pipes conforming to IS : 15328, for weep holes M 1200 INCLUDED 0 0
88 7000002230 23020 60 880 Substation works 150000058 995432 18 Dry stone pitching including supply of stone and preparing surface complete as per approved drawing M2 2400 INCLUDED 0 0
89 7000002230 23020 60 890 Substation works 150000057 995432 18 CUTTING ,FILLING AND LEVELING OF SOIL. M3 24000 INCLUDED 0 0
90 7000002230 23020 60 900 Substation works 150000149 998739 18 Cutting and disposal upto lead of 2km as per instrcution of Site-Incharge. M3 24000 INCLUDED 0 0
91 7000002230 23020 60 910 Substation works 150000056 995432 18 Earth filling & Site Leveling: Earth work in PSS site with ordinary soil (vide classification of soil item - A) obtained fromborrow pits free from logs, stumps, roots, rubbish or any other ingredients likely to deteriorate or affect the stability of thesite surface including breaking the clods maximum to 60 mm cubes, placing the earth in layers not exceeding 225 mm in loosethickness, rough dressing including cost of cutting and removing shrubs , roots falling in borrow area all complete as per approveddesign ( Mode of measurement: sectional measurement after required compaction) M3 7200 INCLUDED 0 0
92 7000002230 23020 60 920 Substation works 100001327 995454 18 Providing and laying of Reinforced Cement Concrete M25 mix including pre cast, shuttering, Grouting of pockets & underpinning butexcluding steel reinforcement M3 1430 INCLUDED 0 0
93 7000002230 22390 70 10 New 33 kV line with ACSR Racoon 150000069 998344 18 Route survey and pole spotting of 33 KV line as perTS. KM 715 INCLUDED 0 0
94 7000002230 22390 70 20 New 33 kV line with ACSR Racoon 150000070 998739 18 Erection of 12 mts. long steel tubular including concrete foundation as per approved drawing & TS. This includes supply offoundation material EA 15961 INCLUDED 0 0
95 7000002230 22390 70 30 New 33 kV line with ACSR Racoon 150000152 998739 18 Erection of 14.5 mts. long steel tubular pole(540 SP76) including concrete foundation as per approved drawing & TS. This includessupply of foundation material EA 1789 INCLUDED 0 0
96 7000002230 22390 70 40 New 33 kV line with ACSR Racoon 150000071 995468 18 Stringing of 3- ph 3-wire 33 kV S/C linewith ACSR Racoon conductor includinginstallation of all fabricatedmaterial, insulators, hardwarefittings, guarding along the line (inbusy area and at various crossings),continous earth wire along the line &jumpering etc. as per TS. This shallalso include supply and installation ofmid span joints, repair sleeves PGclamps, danger plate & anti-climbingdevice. Danger plate & anti-climbingdevice will be installed on allDouble/three/four Pole structuresand poles on both side of variouscrossings. Cost of the Danger plate &anti-climbing device is to be includedin this item. The stringing of one runof Optical Ground Wire (OPGW ) fibreoptic cable including all associatedhardware fittings, its splicing,installation of joint box etc isalso included in this item. KM 664.75 INCLUDED 0 0
97 7000002230 22390 70 50 New 33 kV line with ACSR Racoon 150000190 995468 18 Stringing of 3- ph 3-wire 33 kV D/C line with ACSR Racoon conductor including installation of all fabricated material, insulators,hardware fittings, guarding along the line (in busy area and at various crossings), continous earth wire along the line &jumpering etc. as per TS. This shall also include supply and installation of mid span joints, repair sleeves PG clamps, dangerplate & anti-climbing device. Danger plate & anti-climbing device will be installed on all Double/three/four Pole structuresadn poles on both side of various crossings. Cost of the Danger plate & anti-climbing device is to be included in this item. Thestringing of one run of Optical Ground Wire (OPGW ) fibre optic cable including all associated hardware fittings, its splicing,installation of joint box etc is also included in this item. KM 45 INCLUDED 0 0
98 7000002230 22390 70 60 New 33 kV line with ACSR Racoon 150000072 995455 18 33 kV Stay Set complete in all respect as per TS SET 15306 INCLUDED 0 0
99 7000002230 22390 70 70 New 33 kV line with ACSR Racoon 150000073 998739 18 Earthing of pole using 40 mm dia 3000 mm long pipe as earth electrodes in the pit treated with Charcoal & Salt as per TS. Thisincludes supply of all materials required for completion of job except supply of 40 mm dia GI pipe which is included in supplyportion. SET 2860 INCLUDED 0 0
100 7000002230 22390 70 80 New 33 kV line with ACSR Racoon 150000074 995455 18 Erection 33 kV railway / road crossing complete in all respect as per TS. This also includes supply of 2 nos. GI Pipes of 1.5times the dia of cable required for two seperate ducts as per TS. EA 12 INCLUDED 0 0
101 7000002230 23010 80 20 Installation of Fibre Optic Cabling 170000540 998336 18 Installation of 24F (DWSM) Aerial (ADSS) Fibre Optic Cable including all hardware fittings & accessories except joint box. KM 60 INCLUDED 0 0
102 7000002230 23010 80 30 Installation of Fibre Optic Cabling 170000265 998716 18 Installation of Joint box above ground (Including Splicing & Testing) : 24 fibres EA 30 INCLUDED 0 0
103 7000002230 23010 80 40 Installation of Fibre Optic Cabling 100003249 998336 18 Laying of 24 fibres UndergrounD Optical Fibre Cable KM 4 INCLUDED 0 0
104 7000002230 23010 80 50 Installation of Fibre Optic Cabling 170000261 998716 18 Installation of Joint box in underground (Including Splicing & Testing) : 24 fibres EA 3 INCLUDED 0 0
105 7000002230 23010 80 60 Installation of Fibre Optic Cabling 100003362 995462 18 GI Pipe 100mm ( Nominal Bore) M 100 INCLUDED 0 0
106 7000002230 23010 80 70 Installation of Fibre Optic Cabling 170000252 998716 18 RCC Hume Pipe (Full) : 100mm internal dia (for single duct) : Installation M 40 INCLUDED 0 0
107 7000002230 23010 80 80 Installation of Fibre Optic Cabling 100003247 998336 18 Laying of PLB HDPE pipe in Open Trench for Fibre Optic Cable KM 4 INCLUDED 0 0
108 7000002230 23010 80 90 Installation of Fibre Optic Cabling 100002713 998336 18 Survey & documentation for under ground fibre optic cabling KM 4 INCLUDED 0 0
109 7000002230 23010 80 100 Installation of Fibre Optic Cabling 100002714 998336 18 Excavation & Backfilling for under ground fibre optic cabling treches KM 4 INCLUDED 0 0
110 7000002230 23010 80 110 Installation of Fibre Optic Cabling 170000248 998716 18 Warning Tape: Supply & Installation M 4000 INCLUDED 0 0
111 7000002230 23010 80 120 Installation of Fibre Optic Cabling 170000240 998716 18 Installation of PLB HDPE Pipe by Trenchless Digging : For Single duct : 0-10 Mtrs [span]( Manual /Hand Augering) M 4000 INCLUDED 0 0
112 7000002230 23010 80 130 Installation of Fibre Optic Cabling 170000241 998716 18 Installation of PLB HDPE Pipe by Trenchless Digging : For Single duct : 10-30 Mtrs [span]( Impact Moling) M 2000 INCLUDED 0 0
113 7000002230 23010 80 140 Installation of Fibre Optic Cabling 170000242 998716 18 Installation of PLB HDPE Pipe by Trenchless Digging : For Single duct : More than 30 Mtrs [span] (HDD) M 2000 INCLUDED 0 0
114 7000002230 23010 80 150 Installation of Fibre Optic Cabling 170000270 998716 18 RCC Manholes : For Joint locations as per technical specification EA 3 INCLUDED 0 0
115 7000002230 23010 80 160 Installation of Fibre Optic Cabling 170000271 998716 18 RCC Manholes : For providing Service loops as per technical specification EA 3 INCLUDED 0 0
116 7000002230 23010 80 170 Installation of Fibre Optic Cabling 170000272 998716 18 Brick walled Manholes : For Joint locations as per technical specification EA 3 INCLUDED 0 0
117 7000002230 23010 80 180 Installation of Fibre Optic Cabling 170000273 998716 18 Brick walled Manholes : For providing Service loops as per technical specification EA 3 INCLUDED 0 0
118 7000002230 23010 80 190 Installation of Fibre Optic Cabling 170000275 998716 18 Installation of PLB HDPE Pipe on wall in building premises [including routing of OFC through it] M 50 INCLUDED 0 0
119 7000002230 23010 80 200 Installation of Fibre Optic Cabling 170000281 998716 18 Reinstatement of excavated area/damages M2 50 INCLUDED 0 0
120 7000002230 23010 80 210 Installation of Fibre Optic Cabling 170000355 998336 18 Fibre Optic Distribution Panel (FODP): Indoor Type: FC Coupling and mounted on ETSI 19 INCH rack or slimline rack: Type 1 (48Fibre) EA 35 INCLUDED 0 0
121 7000002230 23010 80 220 Installation of Fibre Optic Cabling 170000356 998336 18 Fibre Optic Distribution Panel (FODP): Indoor Type: FC Coupling and mounted on ETSI 19" rack or slimline rack: Type 2 (96 Fibre) EA 7 INCLUDED 0 0
122 7000002230 23010 80 230 Installation of Fibre Optic Cabling 100002882 998336 18 Fibre Optic Approach cabling: Including installation hardware like ties/clips/cleats, conduits, ducts, supports, fittings,accessories etc.: 24 Fibre KM 24 INCLUDED 0 0
123 7000002230 23010 80 240 Installation of Fibre Optic Cabling 100002883 998336 18 Fibre Optic Approach cabling: Including installation hardware like ties/clips/cleats, conduits, ducts, supports, fittings,accessories etc.: 48 Fibre KM 1 INCLUDED 0 0
124 7000002230 23010 80 250 Installation of Fibre Optic Cabling 100003445 998336 18 Survey of Transmission Line (for live line Installation of OPGW) KM 60 INCLUDED 0 0
125 7000002230 23200 100 10 Erection of 66KV S/C TL 100001244 998342 18 Detailed soil investigation: All kinds of soils except fissured rock and hard rock EA 3 INCLUDED 0 0
126 7000002230 23200 100 20 Erection of 66KV S/C TL 100001245 998342 18 Detailed soil investigation: Fissured Rock EA 3 INCLUDED 0 0
127 7000002230 23200 100 30 Erection of 66KV S/C TL 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 53.53 INCLUDED 0 0
128 7000002230 23200 100 40 Erection of 66KV S/C TL 100001252 995432 18 Benching: All kinds of soils except fissured rock,hard rock and sandy soil M3 800 INCLUDED 0 0
129 7000002230 23200 100 50 Erection of 66KV S/C TL 100001253 995432 18 Benching: Fissured Rock M3 640 INCLUDED 0 0
130 7000002230 23200 100 60 Erection of 66KV S/C TL 100001255 995433 18 Excavation : Dry Soil M3 226 INCLUDED 0 0
131 7000002230 23200 100 70 Erection of 66KV S/C TL 100001257 995433 18 Excavation: Dry Fissured Rock M3 291 INCLUDED 0 0
132 7000002230 23200 100 80 Erection of 66KV S/C TL 100001258 995433 18 Excavation: Wet Fissured Rock M3 129 INCLUDED 0 0
133 7000002230 23200 100 90 Erection of 66KV S/C TL 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 107 INCLUDED 0 0
134 7000002230 23200 100 100 Erection of 66KV S/C TL 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 14 INCLUDED 0 0
135 7000002230 23200 100 110 Erection of 66KV S/C TL 100001262 995454 18 Reinforcement Steel : Supply and placement MT 7.42 INCLUDED 0 0
136 7000002230 23200 100 120 Erection of 66KV S/C TL 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 3.778 INCLUDED 0 0
137 7000002230 23200 100 130 Erection of 66KV S/C TL 100001270 995468 18 Installation of earthing of towers: Counterpoise type (120 m length) EA 24 INCLUDED 0 0
138 7000002230 23200 100 140 Erection of 66KV S/C TL 100001274 995444 18 Installation of tower accessories : Danger Plate EA 24 INCLUDED 0 0
139 7000002230 23200 100 150 Erection of 66KV S/C TL 100001275 995444 18 Installation of tower accessories: Number Plate EA 24 INCLUDED 0 0
140 7000002230 23200 100 160 Erection of 66KV S/C TL 100001276 995444 18 Installation of tower accessories: Phase Plate (Set of three) SET 24 INCLUDED 0 0
141 7000002230 23200 100 170 Erection of 66KV S/C TL 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 24 INCLUDED 0 0
142 7000002230 23200 100 180 Erection of 66KV S/C TL 100004415 995468 18 Installation of insulator strings complete with arcing horns and necessary hardware, installing and stringing of ACSR Dog conductorincluding fixing of conductor accessories, installing and stringing of OPGW including fixing of OPGW accessories for the 66kV S/Cline KM 5.25 INCLUDED 0 0
Total of Schedule-3 0.00 0 1.00 0.00 0.00
# In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Date : -- Printed Name : 0
Place : 00-Jan-00 Designation : 0
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Schedule - 4
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Training Charges :
SI. No. PR No Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Rate of GST applicable ( in %) Description Unit Quantity Unit Charges Total Charges
Total for Training Charges [Total Schedule 4] 0
Date : -- Printed Name : 0
Place : 00-Jan-00 Designation : 0
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Schedule - 5
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
(SUMMARY OF TAXES & DUTIES )
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST on Goods 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST on Services 0.00
Total GST on Installation Services (indentified in Schedule-3) and Training to be imparted in India (identified in Schedule-4) which are not included in the Installation and Training charges as per the provision of the Bidding Documents, as applicable
GRAND TOTAL [1+2] 0.00
Date : -- Printed Name : 0
Place : 0 Designation : 0
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Schedule - 5
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
(SUMMARY OF TAXES & DUTIES )
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST on Goods 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST on Services 0.00
Total GST on Installation Services (indentified in Schedule-3) and Training to be imparted in India (identified in Schedule-4) which are not included in the Installation and Training charges as per the provision of the Bidding Documents, as applicable
GRAND TOTAL [1+2] 0.00
Date : -- Printed Name : 0
Place : 0 Designation : 0
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Schedule - 6
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading and unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 - (NOT APPLICABLE) 0.00
Training Charges
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 - (NOT APPLICABLE) 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name : 0
Place : 00-Jan-00 Designation : 0
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Schedule - 6 After Discount
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading and unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 - (NOT APPLICABLE) 0.00
Training Charges
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 - (NOT APPLICABLE) 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name : 0
Place : 00-Jan-00 Designation : 0
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Schedule 7
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
Contract Services Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Sector-29, Multipackage Discount 0.0000%
Gurgaon (Haryana) - 122001
Type Test Charges for Type Tests to be conducted:
Sl. No. PR No Line Item No Activity Description Code HSN Code Whether HSN in column ‘ 2 ’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description of Test Unit Quantity Unit Charges Total for Type Test charges 0% Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
I Extn.of Kanpur S/s incl series Reactor 18%
1 7000009657 310 9000000434 998346 18 TYPE TEST ON AIR CORE REACTOR LOT 1 INCLUDED 0 0 28%
II Extn.of Bhiwani S/s incl Series reactor
2 7000009657 800 9000000434 998346 18 TYPE TEST ON AIR CORE REACTOR LOT 1 INCLUDED 0 0
TOTAL TYPE TEST CHARGES 0 0 1 0
Date : -- Printed Name : 0
Place : 00-Jan-00 Designation : 0
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Specification No.: CC-CS/1073-NER/REW-4219/3/G2
Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0
Bidder’s Name and Address (Sole Bidder) :
Sl. No. Whether HSN in column ‘ 2 ’ is confirmed. If not indicate applicable the HSN code * #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
This letter of discount is optional. Bidder may / may not offer any discount.
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Letter of Discount Schedule 1 0.00
Schedule 2 0.00
LETTER OF DISCOUNT Schedule 3 0.00
To: Schedule 7 0 1 Schedule 4
Contract Services Schedule 1 0.00 1 Schedule 7
Power Grid Corporation of India Ltd., Schedule 2 0.00 1 Total 0.00
"Saudamini", Plot No.-2 Schedule 3 0.00 1
Sector-29, (near IFFCO Chowk) Total Bid Price 0.00 1
Gurgaon (Haryana) - 122001
Subject : Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Sch 1 Sch 2 Sch 3 Sch 7 Final Discount Factor Sch-1 Sch-2 Sch-3 Sch-4 Sch-7
1 Discount on lum-sum basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3, Sch-4 & Sch-7] In Rs. 0.00 0.00 0.00 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2 Discount on percent basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3, Sch-4 & Sch-7] In Percent (%) 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00 Schedule-1 : (Direct Only) 0.0000000000% 0.00 X X X X
Schedule-2 : Freight & Insurance In Rs. 0.00 Schedule-2 : Freight & Insurance 0.0000000000% X 0.00 X X X
Schedule-3 : Erection Charges In Rs. 0.00 Schedule-3 : Erection Charges 0.0000000000% X X 0.00 X X
Schedule-4 : Training Charges (NOT APPLICABLE) In Rs. 0.00 X X X 0.00 X
Schedule-7 : Type Test Charges (NOT APPLICABLE) In Rs. Schedule-6 : Type Test Charges 0.0000000000% X X X X 0.00
4 Discount on percent basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0 0.00 X X X X
Schedule-2 : Freight & Insurance In Percent (%) 0.00 X 0.00 X X X
Schedule-3 : Erection Charges In Percent (%) 0.00 X X 0.00 X X
Schedule-4 : Training Charges (NOT APPLICABLE) In Percent (%) 0 X X X 0.00 X
Schedule-7 : Type Test Charges (NOT APPLICABLE) In Percent (%) X X X X 0.00
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules. 0.00 0.00 0.00 0.00
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation.
Please consider this letter of discount as the integral part of our price bid. 0 0 0 0
Thanking you, we remain, 1 1 1 1 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Yours faithfully,
For and on behalf of
Date : -- Printed Name : 0
Place : 00-Jan-00 Designation : 0
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
Specification No.: CC-CS/1073-NER/REW-4219/3/G2 Bid Form 2nd Envelope Sole Bidder 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : -- 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 th 10 October
"Saudamini", Plot No.-2 11 th 11 November
Sector-29, 12 th 12 December
Gurgaon (Haryana) - 122001 13 th
Name of Contract : Package ARP-DMS-05 for distribution works in Arunachal Pradesh under Comprehensive Scheme for Strengthening of Transmission & Distribution system in NER & Sikkim: Intra State - Arunachal Pradesh 15 th
Dear Ladies and/or Gentlemen, 16 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading. 22 th
Schedule 3 Installation Charges. Sole Bidder 23 th
Schedule 4 Training charges for training to be imparted. 24 th
Schedule 5 Taxes and Duties 25 th
Schedule 6 Grand Summary [Schedule 1to 6] 26 th
Schedule 7 Break-up of Type Test Charges for Type Tests to be conducted 27 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.4 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN , in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 1
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : -- Printed Name : 0
Place : 0 Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Total Ex-Works Price Direct 0.00
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF!
Total Ex-works Price including Type Test charges #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
^ If the item(s) quoted/considered as "Bought-out" in the bid are manufactured at Bidder's works and confirmed to be supplied under “Direct transaction” by the bidder, then the taxes and duties on such items shall be paid/reimbursed by POWERGRID in line with the provisions of Bidding Documents. For this purpose, at the time of award, the Ex-works price (exclusive of taxes & duties) shall be arrived at from the quoted Ex-works price (inclusive of taxes ad duties) by excluding taxes and duties applicable on such items, as on date of Bid opening, in case of supplies from manufacturer proposed in the bid. During contract execution, the taxes and duties on such items shall be paid/reimbursed at actuals, limited to the rates prevailing on date of Bid opening.
Place : Printed Name : --
Total F&I Price (=SUM(I16:I27))
Date : (='Sch-1'!B43)
Place : (='Sch-1'!B44) Printed Name : (='Sch-1'!E44)
Designation : (='Sch-1'!E45)
Total Installaiton Charges #REF!
Date : (='Sch-1'!B43)
Place : (='Sch-1'!B44) Printed Name : (='Sch-1'!E44)
Designation : (='Sch-1'!E45)
Date : (=IF('Sch-1'!B43=0,"", 'Sch-1'!B43)) (="Printed Name : " & IF('Sch-1'!E44=0,"",'Sch-1'!E44))
Place : (=IF('Sch-1'!B44=0,"", 'Sch-1'!B44)) (="Designation : " & IF('Sch-1'!E45=0,"",'Sch-1'!E45))
TOTAL TYPE TEST CHARGES (=SUM(I17:I18))
Date : (='Sch-1'!B43) (="Printed Name : " & 'Sch-1'!E44)
Place : (='Sch-1'!B44) (="Designation : " & 'Sch-1'!E45)
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Appendix I _ Guidelines for Approach cable installation.pdf
pdf • 1.27 MB
Appendix_F_1_ TYPE TEST PROCEDURE FOR OPTICAL FIBRE.pdf
pdf • 0.62 MB
Appendix_F_2_ Type Test procedure OPGW Cable.pdf
pdf • 1.52 MB
Appendix_F_3_ OPGW HARDWARE FITTINGS TYPE TEST PROCEDURE.pdf
pdf • 0.49 MB
Appendix_F_4_ GENERAL TYPE TEST PROCEDURE-VIBRATION DAMPER.pdf
pdf • 0.29 MB
Appendix_F_5 Type Test Procedure for Joint Box.pdf
pdf • 0.28 MB
Appendix_H_1 SAT Procedure.pdf
pdf • 1.70 MB
Appendix-A UGFO Specifications.doc
doc • 0.47 MB
Appendix-E-Splicing_guideline.pdf
pdf • 1.02 MB
Appendix-G_1_ FAT Procedure for OPGW.pdf
pdf • 0.52 MB
Appendix-G_2_ FAT Procedure for OPGW Fitting, JB & FODP.pdf
pdf • 0.71 MB
Appendix-G_3 FAT Procedure for Vibration Damper.pdf
pdf • 0.22 MB
Appendix-G_4_ FAT procedure of Approach Cable.pdf
pdf • 0.43 MB
GTR Forms for OPGW manufacturer.docx
docx • 0.03 MB
Section VI - Appendix-B_ DRS.doc
doc • 0.55 MB
Section VI - Chapter-02 Testing requirements-fin.doc
doc • 0.52 MB
Section VI - Chapter-03 Installation requirements-fin.doc
doc • 0.18 MB
Section VI - Chapter-04 Aerial Fibre Optic Cabling requirement-fin.doc
doc • 0.17 MB
Section VI - Chapter-05-Documentation-fin.doc
doc • 0.19 MB
Section VI - Chapter-06-Project Mgmt-fin .doc
doc • 0.20 MB
Section VI- Chapter-01 General & OPGW Cable-fin.doc
doc • 0.29 MB
~$ction IV Chapter-1 (Transformer).doc
doc • 0.00 MB
~$ction IV Chapter-18 (Steel tubular poles).doc
doc • 0.00 MB
~$ction IV Chapter-26 (66 kV Tower).doc
doc • 0.00 MB
~WRL2366.tmp
tmp • 0.31 MB
~WRL2504.tmp
tmp • 1.82 MB
APP-II_SFQP Transmission Line, Revision 06.pdf
pdf • 2.80 MB
APP-III_SMQP Rev-5.pdf
pdf • 3.40 MB
Section IV Chapter-1 (Transformer).doc
doc • 0.32 MB
Section IV Chapter-10 (Fire Protection).doc
doc • 0.13 MB
Section IV Chapter-11 (BMK).doc
doc • 0.13 MB
Section IV Chapter-12(ENERGY METER).doc
doc • 0.22 MB
Section IV Chapter-13 (Cables and Jointing Kit).doc
doc • 0.17 MB
Section IV Chapter-14 ( HG Fuse ).doc
doc • 0.16 MB
Section IV Chapter-15 (Cable laying and Erection).doc
doc • 0.45 MB
Section IV Chapter-16 (Rail Pole & RS Joist).doc
doc • 0.13 MB
Section IV Chapter-17 (PSC Pole).doc
doc • 0.16 MB
Section IV Chapter-18 (Steel tubular poles).doc
doc • 0.16 MB
Section IV Chapter-19 (Hardware Fittings).doc
doc • 0.15 MB
Section IV Chapter-2 (VCB).doc
doc • 0.65 MB
Section IV Chapter-20 (ACSR Conductor).doc
doc • 0.23 MB
Section IV Chapter-21 (G.I Wire for Guarding and Lacing).doc
doc • 0.13 MB
Section IV Chapter-22 (PG clamp).doc
doc • 0.12 MB
Section IV Chapter-23 (Insulator).doc
doc • 0.23 MB
Section IV Chapter-24 (Mid span compression joint & Repair sleeve).doc
doc • 0.34 MB
Section IV Chapter-25 (Stay Set).doc
doc • 0.15 MB
Section IV Chapter-26 (66 kV Tower).doc
doc • 0.40 MB
Section IV Chapter-27 (AB Switch).doc
doc • 0.13 MB
Section IV Chapter-3 (C&R Panel).doc
doc • 0.20 MB
Section IV Chapter-4 (Isolators).doc
doc • 0.17 MB
Section IV Chapter-5 ( Instrument Transformer).doc
doc • 0.16 MB
Section IV Chapter-6 (LA).doc
doc • 0.28 MB
Section IV Chapter-7 (Battery & Battery Charger).doc
doc • 0.20 MB
Section IV Chapter-8 (ACDB & DCDB).doc
doc • 0.15 MB
Section IV Chapter-9 (Station Lighting).doc
doc • 0.22 MB
INDEX.doc
doc • 0.05 MB
~$ction I( Introduction and General Technical Requirements)-Arunachal 02.doc
doc • 0.00 MB
~WRL0001.tmp
tmp • 0.25 MB
Section I( Introduction and General Technical Requirements)-Arunachal 02.doc
doc • 0.30 MB
~$ction II (CIVIL WORKS AND SOIL INVESTIGATION).doc
doc • 0.00 MB
Section II (Civil works and Soil Investigation) R1.doc
doc • 2.99 MB
SLD One transformer.pdf
pdf • 1.11 MB
SLD Two transformer.pdf
pdf • 0.57 MB
Section III( Construction Details).doc
doc • 0.21 MB
QA&I Amendment Anexxure-ZY.pdf
pdf • 1.30 MB
Section V ( Project Management) - updated by QA&I.doc
doc • 0.30 MB
01_First Envelope Attachments and Bid Form.xls
xls • 4.71 MB
02_Attachment-3_Qualification Requirement data.doc
doc • 0.14 MB
03_Attachment-8_Manufacturer Authorization Form.doc
doc • 0.05 MB
04_Attachment-18_SAFETY PACT-rev1.docx
docx • 0.04 MB
05_Attachment-20_KMP Declaration.doc
doc • 0.06 MB
06_Attachment-21_E-RA Compliance.docx
docx • 0.03 MB
07_Attachment-22_Declaration.docx
docx • 0.03 MB
08_Attachment 23- authorization certifacte issued by Domestci Manufacturer.docx
docx • 0.02 MB
09_Attachemnt-24- Affidavit for self-certifictaion.docx
docx • 0.03 MB
10_attachment 25- certifacte by bidder as per DOE.docx
docx • 0.03 MB
11_Attachemnt-26- Affidavit for self-certifictaion PPP-MII.DOCX
docx • 0.03 MB
12_Attachment 27- certifacte by Auditor PPP-MII.docx
docx • 0.03 MB
13_Attachment 28-Bid securing Declaration.docx
docx • 0.02 MB
14_Second Envelope Price Schedules.xlsx
xlsx • 0.60 MB
01- IFB.doc
doc • 0.11 MB
02-Section - II ITB SSTE S&I Rev 5-DCB-Mjn.pdf
pdf • 1.95 MB
03-Section - III_BDS.docx
docx • 0.07 MB
04-Annexure-A (BDS).doc
doc • 0.09 MB
04-Annexure-B to BDS.docx
docx • 0.03 MB
04-Annexure-C to BDS.docx
docx • 0.03 MB
04-Annexure-D to BDS.docx
docx • 0.03 MB
05-Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
06-Section - V_SCC.doc
doc • 0.17 MB
07-Appendix -I to SCC.doc
doc • 0.17 MB
08-Annexure-I to Section-V (SCC).docx
docx • 0.02 MB
09-Sample Forms and Procedures-AIS.doc
doc • 0.55 MB
Annulment_Letter.doc
doc • 0.42 MB
Link_for_Pre-Bid_meeting.docx
docx • 0.16 MB
Letter for Amendment No-I.docx
docx • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .