Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance BOGDANG | -27.86% | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 CrAdmitted-Finance | -26.00% | ₹2.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.3 CrAdmitted-Finance | -21.00% | ₹2.3 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.3 CrAdmitted-Finance | -20.00% | ₹2.3 Cr | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.9 Cr
EMD Value
₹6.9 L
Closing Date
12 Jan 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of irrigation canal from Khemi Tokpo to Zangnan Thang (Under Capex)
2025_PWD_18201_4
90 of I and FC Division Leh 2025-26
Open Tender
Civil Works - Canal
720 days
LEH
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,428
Payable To Executive Engineer InFC division Leh
₹6.9 L
23 Mar 2026
19 Dec 2025
14 Jan 2026
20 Dec 2025
12 Jan 2026
20 Dec 2025
Earth work in excavation by manual means infoundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. A. All kinds of soil 70%
B. Ordinary soil 20%.
C. Hard rock 10%
Dry stone pitching (any thickness) excluding cost of stones.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns.
Carriage of material from source to site by mechanical transport. A. Sand and stone agg an avg lead 20 kms.
B. Cement an avg lead 180 kms.
stage.html
html • 0.03 MB
technical_43980.pdf
techsummary_43980.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 2.25 MB
BOQ_43980.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid