Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Qualified | Qualified |
| 2 | Qualified | Qualified |
| 3 | Qualified | Qualified |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
11 Nov 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Pallavi Mishra
NR III RHQ, Lucknow
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting and conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
NR3/NT/W-CIVIL/DOM/K00/24/14070
Open
Electrical - All
Works
Orai
₹5,000
₹2.7 L
13 Nov 2024
18 Oct 2024
13 Nov 2024
18 Oct 2024
8 Nov 2024
18 Oct 2024
Name of Package: Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962)
: Schedules : General guidelines for filling up the Attachments
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962)
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
1 Bidder may note that non-submission of Bid Form shall lead to outright rejection of their bid and no clarification shall be sought from them in this regard.
2 Fill up only green shaded cells in the relevent attachments.
3 Bid Form and Attachment-3, 4, 5, 5A, 6, 7, 8, 9, 10, 11 & 13 are enclosed here in this workbook.
4 Attachment-1 (Bid Security) : To be submitted as per proforma provided in the bidding document. Bid Security should remain valid for 250 days from the original date of Bid Opening of First Envelope.
5 Attachment-2 (Power of Attorney) : No specific format is provided by POWERGRID. Bidder may use their own format.
6 Integrity Pact : To be submitted in line with clause 6(j) of ITB, Volume-IA
7 Attachment: 12 (Declaration of Key Managerial Person and Power of Attorney holder) shall be submitted in the format provided separately in Volume-III of Bidding Documents. Bidders are required to sign and stamp the same and upload the scanned copy in line with provisions of bidding documents
8 Attachment: 14 (Format for Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order, 2017), if applicable, shall be submitted on a non-judicial stamp paper of Rs. 100/- in the format provided separately in Volume-III of the bidding documents.
9 Attachement: 15 (Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable [to be submitted on the letter head of the issuer] in the format provided separately in Volume-III of the bidding documents. [NOT APPLICABLE]
10 Attachment: 16 (Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA).[APPLICABLE]
11 Attachment: 17 (Declaration regarding events encountered pursuant to ITB Clause 2.1). [APPLICABLE]
12 Attachment: 18 (Certification by the Bidder per DoE Order in line with ITB Clause 1.2.1). [APPLICABLE]
13 Attachment: 19 Undertaking by the bidder regarding Compliance of DMI&SP policy
14 Attachment 20: Declaration by the bidder for ‘Code of Integrity for Public procurement’
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
General Instruction to the Bidders for filling up this workbook of Bid Form and Attachments (1 to 11)
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not fill the cell by dragging the other cell value in down or adjacent cell.
(vii) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder. Do not leave this cell blank.
● Fill up date in dd-mmm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Select either Direct or Bought-out from the drop down menu. Do not leave the cell blank the same shall be deemed to be Bought-out if the cell is left blank.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-1A (Summary of Taxes and Duties applicable on the Item(s)/Materia(s)/Equipment(s)) :
● Fill up applicable rate of Excise Duty. The amount of Excise Duty on the items mentioned as Direct in the mode of transaction in Schedule-1 shall be calculated automatically at the rate mentioned by the bidder here.
● Segregate and fill up the amount on which Sales Tax shall be applicable out of Ex-works supply items mentioned as direct in the mode of transaction in Schedule-1. Applicable Excise Duty on this amount will be calculated automatically at the rate mentioned by the bidder. Further, fill up the rate of applicable Sales Tax. Amount of Sales Tax shall be automatically calculated on the amount mentioned by the bidder as subjected to Sales Tax plus applicable Excise Duty at the rate mentioned by the Bidder.
● Difference of total amount quoted by the bidder as Direct Transaction and the amount mentioned by him subjected to Sales Tax shall be considered as the amount on which VAT shall become applicable and the same shall be calculated & displayed automatically. Applicable Excise Duty on this amount at the rate mentioned by the bidder shall also be calculated & displayed automatically. Fill up the rate of applicable VAT. The amount of VAT shall be calculated automatically on the amount considered to be subjected to VAT plus applicable Excise Duty at the rate mentioned by the bidder here.
● Amount as per details filled up by the bidder in the work sheets Entry Tax, Octroi and other Taxes & Duties shall be displayed in this work sheet Sch-5 but will not be added to the grand total and shall be considered as applicable.
● Click at the links to go to the work sheets Entry Tax, Octroi and other Taxes & Duties one by one.
● Fill the description, amount and rate of applicable Entry Tax. Total of this worksheet shall be displayed in Sch -1A (Taxes & Duties)
● Click at the link to go back to Sch-1A.
● Fill the description, amount and rate of applicable Octroi. Total of this worksheet shall be displayed in Sch -1A (Taxes & Duties)
● Click at the link to go back to Sch-1A.
Other Taxes & Duties :
● Fill the description, amount and rate of applicable Other Taxes & Duties. Total of this worksheet shall be displayed in Sch -1A (Taxes & Duties)
● Click at the link to go back to Sch-1A.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Fill up the rates & location where type tests are proposed.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid from 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-2A.
● Fill up names & Designation of the representatives of bidder.
● Fill up additional information as required.
Happy Bidding !
Before filling up the Bid Form, the Bidder is required to fill up the details as under :
1 Enter Details of Amendments:
Amendments to Bidding Documents issued:
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Bid Proposal Form 1st Envelope
Bid Proposal Form (First Envelope)
Bid Proposal Reference:
Bidder's Address:
Contracts & Material Department
Power Grid Corporation of India Ltd
Northern Region Transmission System-3
Plot No 2A/INS 02, the receipt of which is hereby acknowledged, we the undersigned, offer to execute the Works under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 6.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope (containing EMD and Techno-commercial part) and Second Envelope - Price Part (to be opened subsequently)
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
Name of Contract: Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
1.0 Having examined the Bidding Documents, including Amendment Nos. dated 00/01/1900, the receipt of which is hereby acknowledged, we the undersigned, offer to execute the Works under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 6.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope (containing EMD and Techno-commercial part) and Second Envelope - Price Part (to be opened subsequently)
1.1 We, including any subcontractors or manufacturers for any part of the contract, do not have any conflict of interest in accordance with ITB clause 1.2.2 .
Our Bid, as said above have been submitted as per the followings: For Attachment-1, bidder has to fill the following data
EMD DETAIL FORM FALSE TRUE
2.0 Attachments to the Bid Form (First Envelope): Are you NSIC/MSME Registered: Yes No We are NSIC/MSME registered under Public Procurement Policy for MSEs order 2012. We have enclosed a copy of NSIC Certificate reference no. dated DD-MM-YYYY and the issued certificate is valid upto and inclusive of DD-MM-YYYY. It is to confirm that the equipment(s)/item(s)/material(s) quoted in our bid is in the list of items indicated in NSIC certificate enclosed. We have submitted Bid Guarantee in the form of Bank Guarantee (Bank Guarantee No.-, dated DD-MM-YYYY issued from ) for a sum of Rupees /-, Valid for a period of 250 days from the original date of Bid Opening as per NIT i.e. upto and inclusive of DD-MM-YYYY. Select only one Option (Yes/No)
In line with the requirement of the Bidding Documents, we enclose herewith the following Documents / Attachments: Select the Form of EMD : Bank Guarantee Bank Guarantee No. Select any one Option (Yes/No)
2.1 Attachment-1:We have submitted Bid Guarantee in the form of Bank Guarantee (Bank Guarantee No.-, dated DD-MM-YYYY issued from ) for a sum of Rupees /-, Valid for a period of 250 days from the original date of Bid Opening as per NIT i.e. upto and inclusive of DD-MM-YYYY. Bank Guarantee No. NSIC Certificate No.
Date of Issuance DD MM YYYY
Valid up to DD MM YYYY
Amount of EMD :
Name of Issuing Bank :
2.2 Attachment-2: Power of Attorney, duly notarized, indicating that the person(s) signing the bid has(ve) the authority to sign the bid and thus that the bid is binding upon the Bidder during full period of its validity, in accordance with ITB Clause 2
2.3 Attachment-3: The documentary evidence in terms of ITB Clause 6.3(c) for the qualification data has been furnished by us All the prices and the price components stated in our bid price are firm in accordance with provisions of the bidding documents. All the prices and other terms and conditions of this proposal are valid for a period of Six [06] calendar Months from the date of opening of the bid
2.4 Attachment-4: The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein
2.5 Attachment-5: Information regarding ex-employees of Owner in our firm.
2.6 Attachment-5A: (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works.
2.7 Attachment-6: Work Completion Schedule.
2.8 Attachment-7: Declaration Regarding Social Accountability
2.9 Attachment-8: Price Adjustment Data
2.10 Attachment-9 & 9-P: Integrity Pact
2.11 Attachment-10: Additional Information
2.12 Attachment-11: Declaration regarding Price Bid
2.13 Attachment-12: Declaration of Key Managerial Person and Power of Attorney holder
2.14 Attachment-13: (Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises)
2.15 Attachment-14 : Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order, 2017 and MoP order December 2018, if applicable.
2.16 Attachment-15: Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable.
2.17 Attachment-16:Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
2.18 Attachment-17:Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.
2.19 Attachment-18:Certification by the Bidder per DoE Order in line with ITB Clause 1.2.1
2.20 Attachment-19:Undertaking by the bidder regarding Compliance of DMI&SP policy
2.21 Attachment-20:Declaration by the bidder for ‘Code of Integrity for Public procurement’
3.0 Second Envelope
In continuation of First Envelope of our Bid, we have submited the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, Accordingly, we the undersigned, offer to execute the Works under the above-named package in full conformity with the said Bidding Documents for the sum specified in our Second Envelope Bid, in accordance with the terms & conditions of the Bidding Documents or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. We hereby confirm that the total amout of our bid is in accordance with the prices quoted by us under different Heads, as detailed below:
i. Erection Charges excluding GST
4.0 Undertakings/Compliances
4.1 We are aware that, in line with Clause No. 17.1 (ITB), our Second Envelope (Price Bid) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope Bid
4.3 We declare that as specified in Clause 5.7, ITB, Vol.-IA of the Bidding Documents, prices quoted by us are fixed & firm and shall not be subject to any adjustment during performance of the contract
4.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Works and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced
4.6 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelop (Price Bid) include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Works, in and outside of India
4.7 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN in all the states where the project is located and the states from which we shall make our supply of goods.
4.8 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.9 We further understand that notwithstanding 4.0 above, in case of award on us, you shall also bear and pay/reimburse to us, GST in respect of Supply of Services by us to you, by the Indian Laws.
5.0 Construction of Contract
5.1 We declare that we have studied clause GCC 12 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us the Contracts covering all goods and related services
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us: GCC Clause 8 & SCC Clause 13 (Taxes, duties and levies/Contract Price) GCC Clause 14 & SCC Clause 18 (Contract Performance Guarantee), GCC Clause 18 & SCC Clause 4 (Time the essence of Contract/Completion Schedule/Period), GCC Clause 26.5 (Patents & Royalties), GCC Clause 45 (Guarantee), GCC Clause 46 (Defect Liability Period), GCC Clause 64 & SCC Clause 15 (Payment on Account/Terms of payment), GCC Clause 66 & SCC Clause 14 (Contract Price adjustment / Price Variation/ adjustment), GCC Clause 69 (Arbitration & laws), Concilation GCC Clause 70 (Laws & jurisdiction of Contract)
7.0 We conform that we stand committed to comply with all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records
8.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the Completion of the Works within the time stated in the Bidding Documents
9.0 If our bid is accepted, we undertake to provide Performance Security in the form and amount, and within the time specified in the Bidding Documents
10.0 We agree to abide by this bid for a period of 180 (One Hundred Eighty) days from the date fixed for opening of First Envelope bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
11.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
12.0 We understand that you are not bound to accept the lowest or any bid you may receive.
13.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:
YES Name & Address of agent Amount & Currency Purpose of Commission or Gratuity TRUE
14.0 We hereby declare that only the persons or firms interested in this proposal as principal or principals are named herein and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if we are awarded the contract, that this proposal is made without any connection with any other person, firm or party like-wise submitting a proposal and that this proposal is in all respects for and in good faith, without collusion or fraud.
15.0 We, hereby, declare that we, along with our associate/ collaborators/ sub-contractors/ sub-vendors/consultants/ service providers shall strictly adhere to the POWERGRID Whistle Blower and Fraud Prevention Policy. We, along with our associate / collaborator / subcontractors / sub-vendors / consultants / service providers shall observe the highest standard of ethics and shall not indulge or allow anybody else working in our organization to indulge in fraudulent activities during execution of the contract and would immediately apprise the Employer about any fraud or suspected fraud as soon as it comes to our notice.
Thanking you, we remain,
Yours faithfully,
For & On Behalf of
Date: DD MM YYYY Name:
Place: Designation:
Business Address: ……………………………………………………………………….
Name of Principal Officer:
Address of Principal Officer:
Note: (Written power of Attorney of Signatories of bid to commit the Bidder must be enclosed with the bid. Bidders may use their own proforma for furnishing the required information with the bid)
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-3
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[DOCUMENTS IN SUPPORT OF MEETING THE SPECIFIED QUALIFYING REQUIREMENT]
Bidder's Address:
Contracts & Material Department
Power Grid Corporation of India Ltd
Northern Region Transmission System-3
Plot No 2A/INS 02, the receipt of which is hereby acknowledged, we the undersigned, offer to execute the Works under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 6.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope (containing EMD and Techno-commercial part) and Second Envelope - Price Part (to be opened subsequently)
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
We submit the required documents/information as per clause ITB 6.3(c) as below:
S No. Particulars For Individual Firm
1 Name of the Firm 01 01 2000
2 Head Office/ Registered Office Address 02 02 2001
3 Telephone 03 03 2002
5 Contact Person 05 05 2004
6 Place of Incorporation/ Registration 06 06 2005
7 Year of Incorporation/ Registration 07 07 2006
8 Nationality of 08 08 2007
Owner (i) 09 09 2008
Owner (ii) 10 10 2009
Owner (iii) 11 11 2010
[Necessary documents to eatablish legal status of the bidder should be uploaded with the bid] 12 12 2011
A1. Average Annual Turnover 13 2012
Sr. No. Financial Year Turnover* (in Rs. lakh) Documents submitted in support of Turnover 14 2013
Average of Best 3 #NUM! 21 2020
* Note- Annual total income as incorporated in the profit & loss account except non-recurring income, i.e., sale of fixed assets.
Sr. No. Financial Year Networth (in Rs. Lakh)
A3. Liquid Assets/evidence of access to or availability of credit facilities
Sr. No. Description in Rs. Cr Documents submitted in support of Liquid Assets/Access to or availability of credit facilities
1 Liquid Assets/Access to or availability of credit facilities
B. Work Experience Details as on originally scheduled date of Bid Opening i.e. on 11.11.2024 23
S. No. Description Work #1 Work #2 Work #3 24
a Name & details of the Work 25
b Ref. No. of Award Letter/Contract/WO 26
c Date of Award Letter/Contract/WO (in dd-mm-yyyy format) dd mm dd mm dd mm yyyy 27
d Name of the Client with Contact details 28
e Value of Work as per Award Letter/Contract/WO 29
f Value of Work as per Final Execution 30
g Scheduled Date of Completion as per the Contract (in dd-mm-yyyy format) dd mm yyyy dd mm yyyy dd mm yyyy 31
h Date of actual Completion (in dd-mm-yyyy format) dd mm yyyy dd mm yyyy dd mm yyyy
i Copy of Award Letter/Contract/WO enclosed: (YES/NO)
k Reference Details of Completion Certificate/Performance Certificate/Any Other document like Acceptance of Final Bill by client issued by the client
k1 Ref. No. of Completion/Performance Certificate
k2 Date of issue of Completion/Performance Certificate (in dd-mm-yyyy format) dd mm yyyy dd mm yyyy dd mm yyyy
k3 Name and Designation of person issuing Completion/Performance Certificate
k4 Name of Company/Client who have issued Completion/Performance Certificate
k5 Name of work as per Completion/Performance Certificate
k6 Date of actual Completion as per Completion/Performance Certificate (in dd-mm-yyyy format) dd mm yyyy dd mm yyyy dd mm yyyy
k7 Amount of final work as per Completion/Performance Certificate
k8 Copy of Completion/Performance Certificate attached/enclosed: (YES/NO)
k9 File name by which Completion/Performance Certificate is attached/uploaded YES
C. Status of Firm (Proprietary/ Partnership/ Pvt. Ltd. Company/Public Ltd. Company)
Status of Firm Document Submitted Yes
No Affidavit for Proprietorship
Partnership Deed
D Other Documents Certificate of Incorporation
i PAN Detail Copy of PAN Card Submitted (Y/N)
ii Copy of Partnership Deed/ affidavit for Proprietorship/ Company MoA and AoA or Certificate of Incorporation, as applicable submitted (Y/N)
Date: DD-MM-YYYY Name: 0 Pvt. Ltd. Company
Place: 0 Designation: 0 Public Ltd. Company
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-4
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[ALTERNATIVE, DEVIATIONS AND EXCEPTIONS TO THE PROVISIONS]
Bidder's Address:
Contracts & Material Department, Northern Region-III
Power Grid Corporation of India Ltd
Northern Region-III Headquarters,
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
Irrespective of whatever has been stated to the contrary anywhere else in our offer, only following are the deviations and variations from and exception to the specifications and tender documents for the above mentioned subject work. These deviations and variations are exhaustive. Except for these deviations the entire work shall be performed as per your specifications and other tender documents. Further, we agree that additional conditions, if any, found in our offer other than those stated below, save that pertaining to any rebates offered shall not be given effect to
Sl. No. Ref. of page, Clause & Name of Documents Description of Deviation Cost of withdrawal (Rs.)
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Tender Enquiry No: 0 Attachment-4
[ALTERNATIVE, DEVIATIONS AND EXCEPTIONS TO THE PROVISIONS]
Sl. No. Ref. of page, Clause & Name of Documents Description of Deviation Cost of withdrawal (Rs.)
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Tender Enquiry No: 0 Schedule-4
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[Technical Deviations Schedule]
Bidder's Address:
The following are the Technical deviations and variations from and exceptions to the specifications and documents for the subject package. These deviations and variations are exhaustive. Except these deviations, the entire work shall be performed as per your specifications and document.
Sl. No. Vol./ Clause Ref/ Page No. As Specified in the specification Technical Deviation & Variations/Exceptions
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Tender Enquiry No: 0 Schedule-4
[Technical Deviations Schedule]
Sl. No. Vol./ Clause Ref/ Page No. As Specified in the specification Technical Deviation & Variations/Exceptions
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Tender Enquiry No: 0 Schedule-4A
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[ Deviations on important/critical conditions along with their withdrawal price]
Bidder's Address:
The following are the deviations/variations/exceptions to the provisions of important conditions stipulated in Conditions of Contract, Vol-I. We undertake to execute the contract in line with the provisions of Bidding Documents in respect of above said clauses in case POWERGRID agree to pay- us the withdrawal price indicated below against each such deviations/ variations/ exceptions.
Sl. No. Vol./ Section Clause No./ Page No. Deviations/Variations/Exceptions Withdrawal Price (INR)
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Tender Enquiry No: 0 Schedule-4A
[ Deviations on important/critical conditions along with their withdrawal price]
Sl. No. Vol./ Section Clause No./ Page No. Deviations/Variations/Exceptions Withdrawal Price
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-5
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[ Information regarding Ex-employees of POWERGRID in our Firm]
Bidder's Address:
Contracts & Material Department, Northern Region-III
Power Grid Corporation of India Ltd
Northern Region-III Headquarters,
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
We hereby furnish the details of ex-employees of POWERGRID who had retired/resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us.
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID (DD-MM-YYYY) Date of joining and designation in our organisation
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-5A
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[ Items, Components, Raw Material, Services Proposed to be sourced from Micro and Small Enterprises]
Bidder's Address:
Contracts & Material Department, Northern Region-III
Power Grid Corporation of India Ltd
Northern Region-III Headquarters,
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises(MSEs) for the purposes of completion of works under the subject package:
Sl. No. Item Description Quantity proposed to be bought/ sub-contracted Name of Micro and Small Enterprises
Name & Address Category (Micro or Small)
The above is a list of items we propose to procure from MSEs. However, based on the situations during the executions of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEWs carried out by us, as per the format provided at ANNEXURES-(ANNEX)-VOL-I of the bidding document, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-5A
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[ Items, Components, Raw Material, Services Proposed to be sourced from Micro and Small Enterprises]
Sl. No. Item Description Quantity proposed to be bought/ sub-contracted Name of Micro and Small Enterprises
Name & Address Category (Micro or Small)
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-6
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[ Work Completion Schedule]
Bidder's Address:
Contracts & Material Department, Northern Region-III
Power Grid Corporation of India Ltd
Northern Region-III Headquarters,
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
The Schedule for completion of various activities shall be as under:
Sl. No. Name of Activity Period from Date of LOA
Commencement Completion
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-7
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[ Declaration regarding Social Accountability]
Bidder's Address:
Contracts & Material Department, Northern Region-III
Power Grid Corporation of India Ltd
Northern Region-III Headquarters,
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
We conform that we stand committed to comply all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment- 8
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
(Price Adjustment Data)
Bidder's Address:
Bidder’s name & Address: To
Name : Contracts & Materials Department
Power Grid Corporation of India Limited
Address : #REF! Northern Region Transmission System-III
#REF! 3rd Floor, 12, Rana Pratap Marg,
Lucknow-226001 (Uttar Pradesh)
We hereby furnish the relevant details pertaining to the price adjustment provisions for items as specified in your specifications and documents for the Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1 The necessary documentary evidence are enclosed :
Sl. No. Name of Materials/Labour Name of the published index Value of index (30 days prior to date of opening of bids)
1 Supply & Placement of Reinforcement Steel
A High Speed Diesel coefficient Wholesale Price Index Number for ‘High Speed Diesel’ (Individual commodity) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
L Labour coefficient Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
B Ferrous Metals coefficient Wholesale Price Index Number for ‘Ferrous Metals’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
2 For Concreting
A High Speed Diesel, coefficient a = Wholesale Price Index Number for High Speed Diesel’ (Individual commodity) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
L Labour, coefficient l = Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
B Cement & Lime, coefficient b = Wholesale Price Index Number for ‘Cement & Lime’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
C Structural Clay Products coefficient Wholesale Price Index Number for ‘Structural Clay Products’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
The Bidders are required to indicate the value of indices for various components as of 30 days prior to the date of bid opening. In case bid opening date is extended after submission of bids because of any reason, indices as of 30 days prior to actual date of bid opening shall be considered for placement of award and for payment towards price adjustment.
Date : DD-MM-YYYY Printed Name : 0
Place : 0 Designation : 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-9
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
Bidder’s name & Address:
Address : #REF! #REF!
Contracts & Materials Department
Power Grid Corporation of India Limited
Northern Region Transmission System-III
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
Format of Integrity Pact is enclosed in Volume-III of the bidding document
Date : DD-MM-YYYY Printed Name : 0
Place : 0 Designation : 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment- 10
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
(Additional Information)
Bidder's Name & Address:
Address : #REF! #REF! #REF! #REF!
Contracts & Materials Department
Power Grid Corporation of India Limited
Northern Region Transmission System-III
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
We have enclosed with our proposal the following additional information for the subject package:
1.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 6.3 (k)]
1.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years. A consistent history of awards invlolving litigation against the Bidder or any patner of JV may result in rejection of Bid. [(Refer ITB Clause 6.3 (k)]
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
2 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government department or any other Company, in any country.
Year Name of Client Details of Transgression of Integrity Pact by the bidder
3 Current Contract Commitments of works in progress
Bidders should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
Date: DD-MM-YYYY Printed Name : 0
Place:. 0 Designation : 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) 0 Attachment- 10
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
(Additional Information)
Bidder's Name & Address:
Contracts & Materials Department
Power Grid Corporation of India Limited
Northern Region Transmission System-III
3rd Floor, 12, Rana Pratap Marg,
Lucknow-226001 (Uttar Pradesh)
We have enclosed with our proposal the following additional information for the subject package:
S. No. Brief description of Information Ref. and Page No.
Note: The Bidder should accordingly upload the scanned copies of the relevant documents (Refer Clause 6.3 of ITB, Volume - IA of bidding documents).
Date: DD-MM-YYYY Printed Name : 0
Place:. 0 Designation : 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) Attachment-11
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
[ Declaration Regarding Price Bid]
Bidder's Address:
Contracts & Material Department, Northern Region-III
Power Grid Corporation of India Ltd
Northern Region-III Headquarters,
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
Further, we hereby confirm that except as mentioned in the Attachment-2 (Alternative, Deviations and Exceptions to the Provisions) hereof and/or the Covering Letter, forming part of Envelope-II of our bid
(i) there are no discrepancies/inconsistencies and deviations/omissions/ reservations to the Bidding Documents, in the Envelope-III bid
We also confirm that in case any discrepancies/inconsistencies and deviations/ omissions/reservations, as referred to in para (i) and (ii) above, is observed in the Second Envelope, the same shall be deemed as withdrawn/rectified without any financial implication, whatsoever to POWERGRID. However, in case of any arithmetical errors, the same shall be governed as per the provisions of ITB Sub-clause 17
Date: DD-MM-YYYY Name: 0
Place: 0 Designation: 0
Rfx No.:NR3/NT/W-CIVIL/DOM/K00/24/14070 (RFx 5002003962) ATTACHMENT-13
Site Package A2 (Civil Works) for Extension of 765 kV Orai substation (Shifting & conversion of 765kV fixed line reactor to bus reactor) under Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C1
(Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials Deptt
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 3rd Floor
Plot No 2A/INS 02,
Awadh Vihar Yojna, Amar Shaheed Path, Lucknow- 226 002
I We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made 0
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3. (a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3. (b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro & Small Enterprises (MSEs) order 2012 including subsequent Amendment/notification/order (Indicate Yes/No) Yes (Documentary Evidence attached)
Note: Documentary Evidence is to be attached. Please refer remarks at the end of Attachment. No
3. (c ) If 3(b) is 'Yes', please mention whether you are (Proprietary MSE/Private Limited Company) owned by SC/ST Entrepreneurs
3. (d) Are you a MSE owned by Women in line with Public Procurement Policy for Micro & Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro & Small Enterprises (MSEs) Amendment order 2018 including subsequent Amendment/notification/order (Indicate Yes/No)
Note: Documentary Evidence is to be attached.
4. Permanent Account (PAN) No.
5. GSTIN Numbers
6. GSTIN in the States/UT from where the Supply of Goods takes place
Name of States/UT GSTIN No.
GSTIN in the States/UT from where the Supply of Services takes place (States where the site under the subject package is situated)
Name of States/UT GSTIN No.
9. PF Registration No. of the Company
10. PF Regional Office covered (with Address)
11. Name of Contact Person
12. Telephone No(s)
13. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
14. 9 digit MICR code printed at bottom in middle, next to cheque no.
15. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
* The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC/ST.
b. In case of partnership MSE, the SC/ST partners shall be holding atleast 51% shares in the unit.
c. In case of Private Limited companies, atleast 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificates issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c ) above.
Date : DD-MM-YYYY Printed Name : 0
Place : 0 Designation : 0
BOQ cum Cost Estimate for Site Package A2- Substation Extension (includes Civil works) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
1 CRB plinth area assumed as 750 sqm, as per input by Engg-S/s.
2 As per input by Engg-S/s, the fault level of the 400 kV tower/ equipment is 63 kA and that for 220 kV tower/ equipment is 40 kA.
3 As intimated by Engg-S/s, WT equipment shall be mounted in two phases, however foundation shall be cast for all three phases, hence for 3 circuit, a total of 3×3 = 9 foundations shall be cast.
4 As per discusison with Engg-S/s, for SF6/ Air bushing, scope of support structure is combined with that of GIS, hence no separate structural quantity is considered for it's support structure.
5 As per input by Engg-S/s, LM Iis of 50 m height.
6 For SF6/ Air bushing, foundation quantities are taken same as that of respective level LA support structure.
7 As per discussion with Engg-S/s, for 400 kV busduct support structure, it is assumed that, three bus ducts are mounted one support strucutre, running lenth of these support structures is provided in the input.
8 Plot area considered is 1,97,537 sqm (data from site selection committee) and area to be levelled as 1,50,000 sqm (input by Enggg-S/s).
9 Earthwork for cutting and filling has been taken as: (1/2 of levelling area) × 0.5m = 75,000×0.5 = 37,500 cum.
10 Supply of earth has been taken as: (1/2 of levelling area) × 1.0m = 75,000 × 1.0 = 75,000 cum.
11 No road with paver block is considered, not even for road between main gate and CRB. All roads considered in the S/s are concrete roads. The roads in switchyard shall have PCC shoulder.
12 1000 m road is given as input, 2,000m of drain considered. 60% (A-A), 15% (B-B), 15% (C-C), 10% (D-D)
13 An approach road (concrete, 5.5 m wide), 800 m long from highway to S/s main gate is considered; input-based on site selection committee's visit. No PCC shoulder and drains considered for this road.
14 As such no quantities for diversion of an existing throughfare (crossing our plot) is considered.
15 As such no separate foudnation quantities for CMB for Transformer & Reactor is assumed.
16 As such no quantities/ line item is considered for 'buried cable trenches for auxiliary power arrangement'
17 2 nos of Rain Water Harvesting unit is considered.
18 RCC hume pipes NP-3 (250/300/450 mm) have been considered for crossings of cable trench & road. No of crossings considered are 1no./50 running meter of trench, except for Sec4-4.
19 Rampur lies in UP, basic wind speed: 47 m/s (IS 875: Part 3), basic wind speed: 50 m/s (NBC 2016)
20 Structure quantities for tower, equipment, RCC & reinforcement steel quantities have been calculated on the basis of standard drawings based on 47 m/s as basic wind speed (COST PLUS model). Further as a general pracice, these quantities are reduced by 15% to fit into the TBCB model. However the location of the S/s lies in 50 m/s basic wind speed zone as per NBC 2016, hence this 15% reduction in quantities is not considered in this BOQ.
21 Scope of diversion of an existing nallah (which crosses our plot), shall be deemed to be inclued in the levelling works itself. The same needs to be incorporated in the Section-Project.
22 Total quantitiy calcultated for lattice structure has been split into 90% (MS) & 10% (HT). This is done to keep the scope for optimization in steel structures open.
23 PCC (1:4:8) has been assumed under Water Tank for FFPH instead of PCC (1:3:6).
24 1 no of 5 HP dewatering pump is considered for cable trench sump pit and 2 nos of dewatering pump for 400/20 kV Transformers
25 No separate structure quantities for 1 no of double pole structue considered. Lattice (MS) structure qunatity can take care of it.
26 Section-Project: The scope of work shall include but shall not be limited to the following based on Contractor supplied drawings
i Foundations for 400 kV & 220 kV bus duct supporting structures and 400 kV and 220 kV GIS bushing (SF6/Air bushing).
ii All civil works including foundations associated with erection of SF6 gas insulated metal enclosed switchgear along with its SF6 ducts.
iii Foundation for lighting poles/panels, bay marshalling boxes, Control cubicles etc.
iv Preparation of storm water drainage layout using POWERGRID standard sections.
v Stone spreading and anti weed treatment including PCC in the switchyard. A layout for the same shall be develeoped by the contractor.
vi Structure and foundation of all equipment and towers for all voltage level.
vii Foundation along with road cum rail tracks, jacking pads unloading platforms, pulling blocks, Gratings, oil pit, firewalls etc. for 02 units of 400/220kV, 3-Phase Transformers.
viii Cable trenches including cable trenches in Transformer area along with covers including road/rail crossing, sump pits, culverts etc. The cable trench layout including invert levels shall be developed by the contractor.
ix All roads as per the layout. Road layout shall be developed by the contractor.
x Fire Fighting Pump House (FFPH) and Water Tank, Control Room Building (CRB), 400 kV GIS Hall, 220 kV GIS Hall, Transit Camp cum Field Hostel as per specification, complete in all respect. Reference concept drawings for FFPH, Water tank, CRB, Tranit Camp cum Field Hostel shall be made available in the tender documents.
xi The roofing of the AHU Room and Panel Rooms (along with bith the GIS Halls) shall be of puff sandwhich panels same as that for GIS Halls.
xii For RCC frame structure buildings and Pre-engineered buildings, the complete civil works including internal and external finishing, stone soling for flooring, plinth protection, drain along plinth protection, electrical conduit and junction boxes, fan boxes, cable transit system etc. required to complete the building in all respect as per the draing shall be payable in the plinth area rate. However teh quantity of the earthowrk (excavation, backfilling, disposal etc.), concrete (all types), reinforcement steel shall be measured and paid under respective items under BPS.
xiii PEB closed store for GIS spares as per specification, complete in all respect. Reference concept drawings for the same shall be made available in the tender documents.
xiv Permanent water supply for control room cum administrative building, Fire fighting pump house building, fire fighting system and transit system.
xv Laying of plumbing and external sewerage system for control room builing, transit camp and security hut.
xvi Foundation for Auxiliary LT transformers & DG set.
xvii Septic tank and Soak pit for control room building (20 no of users), transit camp (20 no of users).
xviii Soil investigation and measurement of earth resistivity as per technical specifications.
xiv Contouring and leveling of the plot and the area for approach road including supply of borrowed earth and filling if any. Proposal of FGL (Finished Ground level) for finalization by the employer based on HFL data etc.
27 Section-Project: The scope of work shall include but shall not be limited to the following based on Owner supplied drawings
i Construction of boundary wall, main gate and security hut as per specification and drawings, including septic tank and soak pit for security hut (05 no of users).
ii Switchyard fencing and switychyard gate.
iii Switchyard cable trench sections.
iv Roads sections.
v Approach road section.
vi Drain sections.
vii Rain water harvesting drawings.
Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
S No. Package name Description Proposed estimated cost (in Rs.) excluding GST. Mode of tender Remarks
1 Site Pkg ‘A’ Substation Extension Open tender includes Civil, Erection, Fire Fighting, Testing, Commissioning excluding works for Reactor Shifting & Installation
2 Site Pkg ‘B’ Reactor Shifting & Installation 6035000 Open Tender Dismantling of 3×110 MVAR(1-phase) 765 KV Line Reactor, shifting to new foundation and re-erection, testing & commissioning as a Bus Reactor
3 Transportation * 100000 To be decided at later stage Transportation from employer store to the specified location in substation
Sl No. Spare (in Rs.) Pkg A2 - Civil Works (in Rs.) A1
Total (Excluding GST) 14506969.806938883
Total (including 18 % GST) 17118224.372187883
Indicative BOQ for Site Package A2- Substation Extension (includes Civil works) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1" - Only for Reference Purposes
SAP Activity No Sl. No. Item Description Unit Quantity Remarks Remarks
SAP Activity No
100004518 1 Excavation in all kind of soil including rock for all leads and lifts, backfilling, disposal of surplus earth within a lead up to2Km as per technical specification. The surplus earth shall be roughly graded . M3 1999.1
100001325 2 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) M3 103.8735
100001326 3 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) M3 6.0375 for connection to common oil pit
100001327 4 Providing and laying of Reinforced Cement Concrete M25 mix including pre cast, shuttering, Grouting of pockets & underpinning but excluding steel reinforcement. M3 656.56875
100001329 5 STEEL REINFORCEMENT MT 52.5255
100001331 6 Misc. Structural steel including rails, embedments, edge protection angles, gratings etc. but excluding the reinforcement MT 19.875
100003692 7 Stone filling (40mm size) for Transformer/Reactor Foundation M3 42
100001458 8 Construction of rail cum road as per drawing including all item such as excavation,compactions, rolling watering, WBM etc. but excluding concrete reinforcement and structural steel-Section having two rails for Reactor. Sq.m.
100001328 9 Providing and laying Plain Cement Concrete 1:5:10 (1 cement : 5 sand : 10 brick aggregate) M3 50.625 for Swyd PCC
100001714 10 STONE SPREADING IN SWITCHYARD EXCLUDING PCC Sq. m. 675
100001713 11 ANTIWEED TREATMENT Sq.m. 675
100001412 12 Drain including culverts but excluding concrete & reinforcement steel-Section A-A RM 15
100001413 13 Drain including culverts but excluding concrete & reinforcement steel-Section B-B RM 15
130000761 14 14.4.2 Providing, laying and fixing following dia RCC pipe NP2 class (light duty) in ground complete with RCC collars, jointingwith cement mortar 1:2 (1 cement : 2 fine sand) including trenching (75 cm deep) and refilling etc as required. : 150 mm dia RM 30
130000762 15 14.4.3 Providing, laying and fixing following dia RCC pipe NP2 class (light duty) in ground complete with RCC collars, jointingwith cement mortar 1:2 (1 cement : 2 fine sand) including trenching (75 cm deep) and refilling etc as required. : 250 mm dia RM 394 based on site input
100003114 16 External finishing / painting of fire wall (water proofing cement paint) (DSR 13.44.1) Sq.m.
100007701 17 Supplying and erecting dewatering pumps- 2 HP Nos. 3
100001454 18 Demolishing RCC work including stacking of steel bars and disposal of unserviceable material. M3 10
100001542 19 DISMANTLING AND RE-ERCTION OF EXISITNG FENCE RM 15
100001442 20 DISMANTLING OF EXISITNG BRICK DRAIN RM 50
100001712 21 Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC Sqm 50
100001735 23 RCC culverts and cable trench crossings including supplying and laying hume pipe 250mm dia of grade (NP-3) excluding concrete RM 10
A. TOTAL OF CIVIL WORKS (In Rs.)
QTY. ESTIMATE FOR 400 kV BAY AT SUBSTATION
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10 F/W painting/ unit F/W painting PCC/UNIT PCC 1:3:6
A 765 kV Gantry
1 7CA (qty for 1 no of tower) 32 5 352 3200 0 0 0 23 0
2 7CB (qty for 1 no of tower) 85 11 651 8500 0 0 0 62 0
3 7CC (qty for 1 no of tower) 92 12 768 9200 0 0 0 79 0
B 400 KV TOWERS 0
C 220 KV TOWERS 0
400 KV TOWERS (FIROZABAD) 0 0
220 KV TOWERS (FIROZABAD) 0 0
C.1 145 KV TOWERS 0
D 765 Kv EQUIPMENTS 0
E.1 400 KV EQUIPMENTS (63 kA fault level) 0
7 WT 0 0 0 always multiply 1.5 to nos of wt equpments 0
E.2 400 KV EQUIPMENTS (upto 50 kA fault level) 0
7 WT 3.12 0.49 18.85 131.17 0 0 0 always multiply 1.5 to nos of wt equpments 0
F 220 KV EQUIPMENTS 0
G 132 KV EQUIPMENTS 0
G 66/33kv EQUIPMENTS 1 0.2 5 53.08 0 0 0 0
H Cable Trench 0
I Road with PCC Shoulder 0
J Road with Paver Block 0
J-II 5.5 m road Approach Road 0.55 0.57 0 14.61 0 0 0 0
Rail Cum Road 0
2 4 rail (already included in trf/rtr quant) 0
K TRANSFORMER 0
1 500MVA single Ph Trans. 765kV 260 33 451 18150 8 0 20 0
Common Oil Pit for 765 kV Trans. 105 9.5 535 10 0.5 35 0 0
1 500MVA single Ph Trans. 400KV 252 40 680 17650 8000 0 20 0
Common Oil Pit for 765 kV Reactor 105 9.5 535 10 0.5 35 0 0
6 Fire wall for Reactor 765kV 3 45 2.4 80 4500 0 0 0 222 0
M rainwater harvesting 3.38 0 0 152 0 0 0 0
R 400KV RELAY ROOM 5.4 1.8 9 540 0 3 0 0
S 220KV RELAY ROOM 5.4 1.8 9 540 0 3 0 0
T AUXILARY BUILDING (200 SQM) 200 65 450 24000 0 8 0 0
V PCC FOR RCC PIPE TO COMMON OIL PIT 50 0 0.25 0 0 0 0
X PCCFOR STONE SPREADING 0
W Double Pole 12 2 52 800 0
CONTROL ROOM 750 AREA 900 40 750 63000 0
765KV GIS HALL AREA 1.2 0.08 2 80 0
400KV GIS HALL AREA 1.2 0.08 2 80 0
220KV GIS HALL AREA 1.08 0.11 1.06 86.46 0
transit camp 600 30 350 42000 7 0
transit camp (Studio type, 1541 sqm, G+3) 1000 0 202.974 1713.984 383.884 0
Z LT TRANSFORMER 7.5 30 1300 80000 15 0
Y CAR PARKING -8CARS 60 12 150 7000 0 5 0 0
CAR SHED 10 CARS 72 15 170 7000 0
GIS BUS DUCT 1.2 0.2 6 80 0
Insulator Guy Wire Arrangement 1.175 0.2 5.98 41.1 0
Outdoor Hybrid GIS (8m×5m×.75m plinth ht) 50 3.1 56.4 2000 0
Outdoor Hybrid GIS (8m×4m×.75m plinth ht) 40 2.5 46.9 1600 0
PEB Store_GIS Spare_400kV (15m×20m×6m) 260 60 840 21000
PEB Store_GIS Spare_765kV (15m×30m×6m) 350 75 1080 27000
quantity due to pile 627 82 1414 31000 0 0
BOQ cum Cost Estimate for Site Package A2- Substation Extension (includes Civil works) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
in MT below 220 kV 220 kV 400 kV 765 kV Total Reduction by 0% Actual qty considered
Lattice Str (HT) 0 0 0 0 MT
Pipe Str 0.345 0 0 0 MT
below 220 kV Equipment
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
6 145 kV BPI (bus ht 6500mm) 0 24 14 -
220kV TOWERS AND BEAMS
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
220kV EQUIPMENT SUPPORT STRUCTURES
400kV TOWERS AND BEAMS
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners Total excluding fateners No. of Foundation Bolts Dia. of Foundation Bolts (mm) unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. X unit wt excluding fdn bolt Fasteners MS foundation bolts
400kV EQUIPMENT SUPPORT STRUCTURES
765kV TOWERS AND BEAMS
Sl. No. Structure Structure Steel MS Structure Steel HT Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
12 Tower CD 527.28 0 0
765kV EQUIPMENT SUPPORT STRUCTURES
Note: 1 7CC portal has 2 nos of 7CC tower, 1 no of BE,1 no of BF, 1 no of GWCC.
Supply required for structures
Nos Unit weight total
Cable Breakup- Supply
SI. No. SAP Activity No Item Description Unit Qty Unit Rate Amount (Rs) Unit Rate Amount (Rs) Unit Rate Amount (Rs) Remarks/ Reference
Supply F&I Erection
K 1.1kV Grade Power & Control Cables alongwith clamps, lugs, glands, straight through joints etc.
K1 Power Cables
1 100002971 1.1KV 3.5CX70SQMM PVC Km 0.3 8850 SOR,March 2023
2 100002958 1.1KV 2CX6SQMM PVC Km 0.3 8850
3 100002992 1.1KV 4CX6SQMM PVC Km 1.5 26066
K2 Control cable
1 100002977 1.1KV 3CX2.5SQMM PVC Km 1 27416
2 100002994 1.1KV 5CX2.5SQMM PVC Km 2 30844
Cable Trench Crossing
NP-3 Hume Pipe Dia (mm) Wall Thk (mm)
QTY1 QTY2 250 30
Width of road (m) 3.75 Width of road (m) 3.75 Width of road (m) 5.5
Lenth of hume pipe to be taken (m) 6 Lenth of hume pipe to be taken (m) 6 Lenth of hume pipe to be taken (m)
Section 2-2 Crossing Road Section 2-2 Crossing Road Section 2-2 Crossing Road PCC (1:2:4) 0.225 m
No of xsings 0 No of xsings 0 No of xsings 0
PCC (1:4:8) cum PCC (1:4:8) cum PCC (1:4:8) cum m
PCC (1:2:4) cum PCC (1:2:4) cum PCC (1:2:4) cum
RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos Sec 2-2
RCC Hume Pipe 300 mm 1 Nos RCC Hume Pipe 300 mm 1 Nos RCC Hume Pipe 300 mm 1 Nos
RCC Hume Pipe 450 mm 1 Nos RCC Hume Pipe 450 mm 1 Nos RCC Hume Pipe 450 mm 1 Nos
Section 3-3 Crossing Road Section 3-3 Crossing Road Section 3-3 Crossing Road
No of xsings 0 No of xsings 0 No of xsings 0 PCC (1:2:4)
PCC (1:4:8) cum PCC (1:4:8) cum PCC (1:4:8) cum
PCC (1:2:4) cum PCC (1:2:4) cum PCC (1:2:4) cum m
RCC Hume Pipe 250 mm 2 Nos RCC Hume Pipe 250 mm 2 Nos RCC Hume Pipe 250 mm 2 Nos PCC (1:2:4)
RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos
RCC Hume Pipe 450 mm 0 Nos RCC Hume Pipe 450 mm 0 Nos RCC Hume Pipe 450 mm 0 Nos
Section 1-1 & 2A-2A Crossing Road Section 1-1 & 2A-2A Crossing Road Section 1-1 & 2A-2A Crossing Road
No of xsings 0 No of xsings 0 No of xsings 0
PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum 2.7 m
PCC (1:2:4) cum PCC (1:2:4) cum PCC (1:2:4) cum
RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos
RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos
RCC Hume Pipe 450 mm 4 Nos RCC Hume Pipe 450 mm 4 Nos RCC Hume Pipe 450 mm 4 Nos
Total PCC (1:2:4) cum Total PCC (1:2:4) cum Total PCC (1:2:4) cum
Total PCC (1:4:8) 0 cum Total PCC (1:4:8) 0 cum Total PCC (1:4:8) 0 cum
RCC Hume Pipe 250 mm RM RCC Hume Pipe 250 mm RM RCC Hume Pipe 250 mm RM PCC (1:2:4) m
RCC Hume Pipe 300 mm RM RCC Hume Pipe 300 mm RM RCC Hume Pipe 300 mm RM
RCC Hume Pipe 450 mm RM RCC Hume Pipe 450 mm RM RCC Hume Pipe 450 mm RM
Transit Camp- New Dwg no: C/ENGG/STD/TBCB/TCFH/ARCH/04
GROUND FLOOR 1 490.84 1 0.2
FIRST FLOOR 1 411.76 1 0.2
SECOND FLOOR 1 411.76 1 0.2
THIRD FLOOR 1 226.97 1 0.2
GROUND FLOOR-PLINTH 1 220 0.23 0.6
FIRST FLOOR 1 176 0.3 0.75
SECOND FLOOR 1 176 0.3 0.75
THIRD FLOOR 1 176 0.3 0.75
THIRD FLOOR ROOF 1 128 0.3 0.75
Foundation 46 3 0.6 0.6
GROUND FLOOR 46 3 0.6 0.6
FIRST FLOOR 46 3 0.6 0.6
SECOND FLOOR 46 3 0.6 0.6
THIRD FLOOR 46 3 0.6 0.6
Foundation pad 46 2.5 2.5 0.3
EXCAVATION 46 3 3 3
0 YYYY 220/132 kV Bhatapara GSS
NOS OF TOWER TOTAL BOLTS nos of tower total bolts nos of tower total bolts
a) 765 kV Lattice Structure DIA NOS
b) 400 kV Lattice Structure 0
TOWER - TA 40 12 0 0 0
TOWER - TB 56 12 0 0 0
TOWER - TC 28 12 0 0 0
TOWER - TD 40 12 0 0 0
TOWER - TE 40 12 0 0 0
TOWER - TF 56 12 0 0 0
TOWER - TG 40 12 0 0 0
TOWER - TH 56 16 0 0 0
TOWER - TI 40 12 0 0 0
TOWER - TJ 56 16 0 0 0
TOWER - TK 40 12 0 0 0
TOWER - TL 56 16 0 0 0
TOWER - TM 56 12 0 0 0
TOWER - TN 56 16 0 0 0
TOWER - TP 56 16 0 0 0
TOWER - TQ 56 16 0 0 0
TOWER - TR 56 16 0 0 0
TOWER - TS 56 16 0 0 0
TOWER - TT 56 16 0 0 0
TOWER - TTT 63 16 0 0 0
TOWER - TU 56 16 0 0 0
TOWER - TV 56 16 0 0 0
TOWER - TVV 63 16 0 0 0
TOWER - TVVD 80 16 0 0 0
TOWER - TW 56 16 0 0 0
TOWER - TWS 56 16 0 0 0
TOWER - TX 56 16 0 0 0
TOWER - TY 56 16 0 0 0
TOWER - TZ 56 16 0 0 0
c) 220kV Lattice Structure 0
TOWER CA 40 16 0 0 0
TOWER CB 56 16 0 0 0
TOWER CC 28 16 0 0 0
TOWER CD 40 16 0 0 0
TOWER CE 40 12 0 0 0
TOWER CF 56 16 0 0 0
TOWER CTA 56 12 0 0 0
TOWER CTB 56 16 0 0 0
TOWER CTC 56 16 0 0 0
TOWER CTD 40 12 0 0 0
TOWER CTE 56 16 0 0 0
TOWER CTF 56 16 0 0 0
TOWER CTG 28 16 0 0 0
TOWER CTH 40 16 0 0 0
TOWER CTI 56 16 0 0 0
TOWER CTJ 56 16 0 0 0
TOWER CTK 56 16 0 0 0
TOWER CGP 80 0.0 0 0
c.1) 145kV Lattice Structure
d) 765kV Equipment support structure
ISO(Set of six structures) 32 12 0 0 0
WT(set of three structures) 32 16 0 0 0
e) 400KvEquipment support structure (Pipe)
ISO(Set of six structures) 28 4 0 0 0
WT(set of three structures) 28 4 0 0 0
f) 220kV Equipment support structure (Pipe) 20MM DIA 24MM DIA 28MM DIA 32MM DIA 40MM DIA 56MM DIA 63MM DIA 80MM DIA
ISO(Set of six structures) 28 24 0 TOTAL 0 0
WT(set of three structures) 28 12 0 0 0 0
SA 28 4 0 YYYY 0 0
BPI 28 4 0 ZZZ 0 0
f) 132kV Equipment support structure (Pipe)
ISO(Set of 3-Ph) 24 0.0 0 0
WT(set of three structures) 24 0.0 0 0
g) 72.5kV Equipment support structure (Pipe)
ISO ( SET OF 3 STRUCTURE ) 28 24 0 0 0
h) double pole str 28 12 0 0 0
i) 33 kV Equipment support structure (Lattice) 0
QTY. ESTIMATE FOR 765/400/220kV SUBSTATION AT YYYY
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10
A 765 kV Gantry
B 400 KV TOWERS
C 220 KV TOWERS
C.1 145 KV TOWERS
D 765 Kv EQUIPMENTS
E 400 KV EQUIPMENTS
7 WT 0 3.12 0.49 18.85 131.17 0 0 0 always multiply 1.5 to nos of wt equpments
F 220 KV EQUIPMENTS
G 132 KV EQUIPMENTS
G 66/33kv EQUIPMENTS 0 1 0.2 5 53.08 0 0 0
I Road with PCC Shoulder
J Road with Paver Block
Common Oil Pit for 765 kV Trans. 0 105 9.5 535 10 0.5 35 0
Common Oil Pit for 765 kV Reactor 0 105 9.5 535 10 0.5 35 0
5 Fire wall (765) For Tran 0 61 2.5 110 4.5 0 0 0
6 Fire wall for Reactor 765kV 0 45 2.4 80 4500 0 0 0
M rainwater harvesting 0 3.38 0 0 152 0 0 0
R 400KV RELAY ROOM 0 5.4 1.8 9 540 0 3 0
S 220KV RELAY ROOM 0 5.4 1.8 9 540 0 3 0
T AUXILARY BUILDING 0 200 65 450 24000 0 8 0
V PCC FOR RCC PIPE 0 0 0.25 2 0 0 0.75 0
X PCCFOR STONE SPREADING 0
W Double Pole 0 12 2 52 800
CONTROL ROOM 750 AREA 0 900 40 300 63000
transit camp 0 600 30 350 42000 7
Z LT TRANSFORMER 0 7.5 0.4 16 95
CAR SHED 10 CARS 0 72 15 170 7000
GIS BUS DUCT 0 1.2 0.2 6 80
QTY. ESTIMATE FOR 765/400/220kV SUBSTATION AT ZZZ
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10
A 765 kV Gantry
B 400 KV TOWERS
C 220 KV TOWERS
D 765 Kv EQUIPMENTS
E 400 KV EQUIPMENTS
7 WT 0 3.12 0.49 18.85 131.17 0 0 0 always multiply 1.5 to nos of wt equpments
F 220 KV EQUIPMENTS
G 132 KV EQUIPMENTS
G 66/33kv EQUIPMENTS 0 1 0.2 5 53.08 0 0 0
I Road with PCC Shoulder
J Road with Paver Block
Common Oil Pit for 765 kV Trans. 0 105 9.5 535 10 0.5 35 0
Common Oil Pit for 765 kV Reactor 0 105 9.5 535 10 0.5 35 0
5 Fire wall (765) For Tran 0 61 2.5 110 4.5 0 0 0
6 Fire wall for Reactor 765kV 0 45 2.4 80 4500 0 0 0
M rainwater harvesting 0 3.38 0 0 152 0 0 0
R 400KV RELAY ROOM 0 5.4 1.8 9 540 0 3 0
S 220KV RELAY ROOM 0 5.4 1.8 9 540 0 3 0
T AUXILARY BUILDING 0 200 65 450 24000 0 8 0
V PCC FOR RCC PIPE 0 0 0.25 2 0 0 0.75 0
X PCCFOR STONE SPREADING 0
W Double Pole 0 12 2 52 800
CONTROL ROOM 750 AREA 0 900 40 300 63000
transit camp 0 600 30 350 42000 7
Z LT TRANSFORMER 0 7.5 0.4 16 95
CAR SHED 10 CARS 0 72 15 170 7000
GIS BUS DUCT 0 1.2 0.2 6 80
Indicative L2 SCHEDULE
Sl No Description of Activity Start Date Finish Date
1 Date of Notification of award(NOA) shall be treated as zero date/Commencement date
2 Contract Agreement, Signing & Submission of CPG 0 28
a Site Handing Over 0 3
b Site Office Establishment 3 30
c Labour Licence,stuatory compliances & Insurance 3 45
d Source approval of materials including all testing as per SFQP requirement to start the works 5 45
3 Reactor Foundation Works 45 200
a Excavation 45 60
b PCC of reactor works 60 65
c Bar Bending of reactor Works 65 90
d RCC Works 70 150
e Jacking Pad & Rail for jacking pad 150 180
f Gratings & gravel filling for reactor 180 200
4 Equipment Foundation 45 150
a Excavation 45 60
b PCC of reactor works 60 65
c Bar Bending of reactor Works 65 90
d RCC Works 70 150
5 Fire Wall 120 220
a Excavation 120 130
b PCC of reactor works 130 135
c Bar Bending of reactor Works 135 200
d RCC Works & Painting 135 220
6 Drain 150 195
a Excavation 150 160
c Brickwork 165 180
d Plaster & Finishing 180 190
e 1:2:4 drains 190 195
7 Gravel Spreading & PCC 220 240
a Surface Dressing & Antiweed 220 225
c Gravel Spreading 230 240
8 Equipment & Fire Fighting Erection 160 230
a Erection of equipments 160 180
b Erection of fire fighting 170 190
c Commissioning of equipments 190 220
d Commissioning of fire fighting 200 230
9 Final Finishing& Handing Over 230 270
a Completion of all balance works in all aspects 230 260
b Final Handing over & TOC 260 270
The Contractor/bidder shall submit L-2 schedule showing the above activities /milestone keeping the overall comnpletion period unchanged.Minor changes in the individual activity schedule are permissible which the contractor /bidder may suggest considering the volume of work as per their wisdom
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Attachment -17-Event Declaration.docx
docx • 0.03 MB
Attachment 12.doc
doc • 0.03 MB
Attachment 14 Affidavit for self-certificataion.DOCX
docx • 0.02 MB
attachment 18- certificate by bidder.docx
docx • 0.02 MB
Attachment 19 Undertaking Iron Steel.DOC
doc • 0.02 MB
Attachment-16-E-RA.docx
docx • 0.02 MB
Attachment-20 CIPP.docx
docx • 0.02 MB
Attachment-8 Integrity Pact.docx
docx • 0.06 MB
Check List before Uploading bids.docx
docx • 0.02 MB
First Envelope and Bid Forms.xlsx
xlsx • 0.32 MB
Indicative BoQ.xls
xls • 0.49 MB
Switchyard_Civil_works_SFQP_Rev_07.pdf
pdf • 4.71 MB
110 mvar Alstom Reactor Foundation at Orai.pdf
pdf • 0.51 MB
1_0 GTR Rev 15.pdf
pdf • 7.12 MB
CABLE TRENCH & CROSSING DETAILS.pdf
pdf • 0.63 MB
Civil Works Rev 12.pdf
pdf • 0.99 MB
Foundation drawing for 110MVAR Alstom make Reactor at Orai.pdf
pdf • 0.61 MB
L2 Sschedule.xlsx
xlsx • 0.01 MB
Layout.PDF
pdf • 1.99 MB
Section Project.pdf
pdf • 0.89 MB
Std Chain link fencing drawing.pdf
pdf • 1.44 MB
STD DRAIN.pdf
pdf • 2.24 MB
Substation Structure Rev 7.pdf
pdf • 0.30 MB
11A-GCC CIVIL WORKS Vol-I (1).pdf
pdf • 0.58 MB
11B-GCC CIVIL WORKS Vol-I (2).pdf
pdf • 0.15 MB
11C -GCC CIVIL WORKS Vol-I (1).pdf
pdf • 0.17 MB
11D -GCC CIVIL WORKS Vol-I (3).pdf
pdf • 0.09 MB
02A Instructions to Bidders1.doc
doc • 0.31 MB
02B_ANNEXURE-I (ITB)_EMD1.doc
doc • 0.09 MB
02C Annexure-III (ITB) eRA.docx
docx • 0.02 MB
02C_Annexure-II (ITB)_QR.doc
doc • 0.07 MB
1_Invitation to Bids(INV).docx
docx • 0.05 MB
~$Invitation to Bids(INV).docx
docx • 0.00 MB
~WRL1159.tmp
tmp • 0.33 MB
~WRL2309.tmp
tmp • 0.07 MB
03 Special Conditions of Contract.doc
doc • 0.18 MB
03A_ANNEXURE-I (SCC)_CPG.doc
doc • 0.10 MB
03B_ANNEXURE-II (SCC)_Procurement from MSE.doc
doc • 0.08 MB
03C_Sample forms_ Attachments.docx
docx • 0.03 MB
Appendix-I_SCC.docx
docx • 0.02 MB
~WRL0999.tmp
tmp • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .