Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.3 LAccepted-Finance | 1 | Accepted-Finance due to L1 | |
| 2 | 2₹3.4 L+₹8,428.67 (2.57%)Rejected-Finance | 2 | Rejected-Finance due to L2 |
| Sl No | Description | Qty | Unit | SHREE ENGINEERS L2 | DURGA CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. | 191.27 | CUM | 82 ₹15,684.14 | 64 ₹12,241.28 Lowest |
| 2.00 | Providing and Laying of Cement Concrete ( M-10 grade) 1:3:6 including cost of all material, labour and T&P etc complete required for proper completion of work. | 12.55 | CUM | 5,253 ₹65,925.15 | 5,169 ₹64,870.95 Lowest |
| 3.00 | Providing and Fixing Centering and Shuttering for C.C. works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 18.72 | SQM | 501 ₹9,378.72 | 466 ₹8,723.52 Lowest |
| 4.00 | Providing and Laying RCC 1200 MM Dia (NP-3) pipe including cost of Pipe, Labour, T&P etc. complete. | 11 | RMT | 6,520 ₹71,720 | 6,498 ₹71,478 Lowest |
| 5.00 | Providing and laying 1st class M-150 first class brick work in 1:4 Cement Mortar including cost of all material labour and T&P all lift and leads etc. complete. | 24.24 | CUM | 5,300 ₹1,28,472 | 5,249 ₹1,27,235.76 Lowest |
| 6.00 | Providing and Laying 50 mm Thick M-15 (1:2:4) cement concrete with 4 cm guage approved stone ballast coarse sand cement in proportion 1:2:4 including cost of all materials labour T&P etc. required for proper completion of work. | 0.24 | CUM | 4,950 ₹1,188 | 4,850 ₹1,164 Lowest |
| 7.00 | Providing Struck Deep Pointing in 1:2 (1 Cement 2 Coarse Sand) Cement mortar over brick work including all lift and leads with cost of all material labour and T&P all lift and leads etc. complete as per direction of Engineer in Charge | 34.08 | SQM | 111 ₹3,782.88 | 99 ₹3,373.92 Lowest |
| 8.00 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. | 151.69 | CUM | 265 ₹40,197.85 | 256 ₹38,832.64 Lowest |
Tender Value
₹3.3 L
EMD Value
₹7,000
Closing Date
1 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MGCCD8 BULANDSHAHR
EE MGCCD8 BULANDSHAHR
Construction of Pipe Syphon at Km. 1.000 of Dhatra Shekh Minor.
2026_UPIDC_1144439_73
01.EE.2026-27
Open Tender
Civil Works
Item Rate
45 days
sambhal
FEE EMD TECH QUALIFICATION
2 documents required · 2 mandatory
₹767
₹7,000
16 Sept 2026
24 Aug 2026
2 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. | - | CUM | - | - |
| 2 | Providing and Laying of Cement Concrete ( M-10 grade) 1:3:6 including cost of all material, labour and T&P etc complete required for proper completion of work. | - | CUM | - | - |
| 3 | Providing and Fixing Centering and Shuttering for C.C. works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 1 | SQM | - | - |
| 4 | Providing and Laying RCC 1200 MM Dia (NP-3) pipe including cost of Pipe, Labour, T&P etc. complete. | - | RMT | - | - |
| 5 | Providing and laying 1st class M-150 first class brick work in 1:4 Cement Mortar including cost of all material labour and T&P all lift and leads etc. complete. | 1 | CUM | - | - |
| 6 | Providing and Laying 50 mm Thick M-15 (1:2:4) cement concrete with 4 cm guage approved stone ballast coarse sand cement in proportion 1:2:4 including cost of all materials labour T&P etc. required for proper completion of work. | - | CUM | - | - |
| 7 | Providing Struck Deep Pointing in 1:2 (1 Cement 2 Coarse Sand) Cement mortar over brick work including all lift and leads with cost of all material labour and T&P all lift and leads etc. complete as per direction of Engineer in Charge | 1 | SQM | - | - |
| 8 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. | 1 | CUM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_2216434.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .