Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAccepted-AOC LOCATION WEST BENGAL WB | HOOGHLY | WEST BENGAL | 712134 | ₹8.9 Cr | L1 | Accepted-AOC WORK ORDER ISSUED |
| 2 | L2₹9.0 Cr+₹4.3 L (0.48%)Rejected-Finance | ₹9.0 Cr+₹4.3 L (0.48%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹9.1 Cr+₹15.8 L (1.76%)Rejected-Finance | ₹9.1 Cr+₹15.8 L (1.76%) | L3 | Rejected-Finance REJECTED |
| 4 | L4₹9.2 Cr+₹27.6 L (3.09%)Rejected-Finance AT KULMURA KESAKOLE BARAGADRA DIST BANKURA WEST BENGAL 722150 | BANKURA | WEST BENGAL | 722150 | ₹9.2 Cr+₹27.6 L (3.09%) | L4 | Rejected-Finance REJECTED |
| 5 | L5₹9.3 Cr+₹39.1 L (4.38%)Rejected-Finance | ₹9.3 Cr+₹39.1 L (4.38%) | L5 | Rejected-Finance REJECTED |
Tender Value
₹10.6 Cr
EMD Value
₹21.2 L
Closing Date
5 Aug 2025, 5:00 pmClosed
Superintending Engineer, RRNMU, Medinipur Circle
Office of the Superintending Engineer, RRNMU, Medinipur, Khasjungle, P.O. - Abash, Dist. - Paschim Medinipur, Pin. - 721102
T05-Brahmandiha to Hatagram, INDPUR BLOCK in the District of Bankura (Road Length 7.940 km)
2025_WBSRD_142797_1
WB03792
Open Tender
Civil Works - Roads
Percentage
365 days
INDPUR BLOCK
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
₹21.2 L
17 Jul 2026
5 Jul 2025
6 Aug 2025
5 Jul 2025
5 Aug 2025
5 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost for Construction of PAVEMENT WORKS | 1 | Nos. | 7,52,91,323.4 | ₹7,52,91,323.4 |
| 2 | Cost for Construction of ROAD SAFETY WORKS | 1 | Nos. | 16,96,801.58 | ₹16,96,801.58 |
| 3 | Cost for Construction of ROAD FURNITURE WORKS | 1 | Nos. | 1,53,897.21 | ₹1,53,897.21 |
| 4 | Cost for Construction of CROSS DRAINAGE WORKS | 1 | Nos. | 11,54,797.15 | ₹11,54,797.15 |
| 5 | Cost for Construction of DRAINAGE | 1 | Nos. | 32,05,371.23 | ₹32,05,371.23 |
| 6 | Cost for Construction of PROTECTIVE WORKS | 1 | Nos. | 2,84,293.8 | ₹2,84,293.8 |
| 7 | Add @ 18% GST on Cost of Construction | 1 | Nos. | 1 | ₹1 |
| 8 | Add @ 1% Labour Welfare CESS on Cost of Construction | 1 | Nos. | 1 | ₹1 |
| 9 | 1st Year Routine Maintenance | 1 | Nos. | 8,37,427.68 | ₹8,37,427.68 |
| 10 | 2nd Year Routine Maintenance | 1 | Nos. | 9,74,989.68 | ₹9,74,989.68 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ.xls
BOQ • 0.35 MB
BOQ_2.xls
BOQ • 0.05 MB
Tenderdocument.pdf
Tender Documents • 0.07 MB
Tenderdocument_2.pdf
Tender Documents • 1.23 MB
Tenderdocument_3.pdf
Tender Documents • 5.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .