Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAccepted-AOC 118 SHIRGAL DHARGAL PERNEM GOA | NORTH GOA | GOA | 403001 | ₹35.0 L | L1 | Accepted-AOC Lowest Quote |
Tender Value
₹33.3 L
EMD Value
₹1.5 L
Closing Date
23 Mar 2026, 3:00 pmClosed
Executive Engineer
DISTRICT RURAL DEVELOPMENT AGENCY NORTH SPACES building 7th Floor Patto Plaza PANAJI GOA
Construction of crematorium Sy No 230 1 in Jurisdiction VP Latambarcem Kharpal in Ward No II Latambarcem Bicholim Goa under DRDA Fund
2026_DRD_28125_1
DRDA-N/GGSY/TN/20/25-26/207/L1
Open Tender
Civil Works - Buildings
Percentage
Kharpal
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹1.5 L
13 Jul 2026
11 Mar 2026
24 Mar 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 64.75 | cu.m | 291 | ₹18,842.25 |
| 1.02 | All types of Ordinary rock including all types of laterite rock, blasting prohibited | 64.75 | cu.m | 672 | ₹43,512 |
| 2Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sq.m on plan) including disposal of excavated earth lead upto 50m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : | |||||
| 2.01 | All kinds of soil | 74.2 | cu.m | 286 | ₹21,221.2 |
| 2.02 | All types of Ordinary rock including all types of laterite rock, blasting prohibited | 74.2 | cu.m | 639 | ₹47,413.8 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 116.7 | cu.m | 2,211 | ₹2,58,023.7 |
| 4Providing & laying cement concrete 1:2:4(1 cement:2 coarse sand:4 graded granitic or basaltic stone aggrt. 20mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 4.01 | All works upto plinth level | 60.35 | cu.m | 6,810 | ₹4,10,983.5 |
| 5 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 118.7 | cu.m | 5,186 | ₹6,15,578.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_28581.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .