Restoration of Old A.E work at Maircha Village (Left bank of river Koshi) (Agenda No 246/06/2026)
128054
NIT02/2025-26/NAUGACHIA/Gr-02
Open Tender
CIVIL
Bhagalpur
• REGISTRATION
• CHARACTER CERTIFICATE
• AFFIDAVIT
• SIMILAR NATURE OF WORK EXPERIENCE
• PAN/ITR/GST
• EMD
• OTHERS
CIVIL
PERCENTAGE
L1
1
6 documents required · 6 mandatory
₹5,000
Processing Fee: 590
₹79,300
Yes
CHIEF ENGINEER, FLOOD CONTROL AND DRAINAGE, WATER RESOURCES DEPARTMENT, KATIHAR, CAMP PURNEA
7 May 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
28 Mar 2026
Detailed Estimate for Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar (Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) E/I. (5.1.47)
Earth work cutting of Bed bar= 19x4.6x6 524.40 m3
Total Qty.= 524.40 m3
2 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I. (5.7.52)
NC for bed bar=6x(3.6+0.5+0.5)x8 220.80 cum
Deduct 5% Quantity for loose pitching for undulation levelling ie 5% of 220.80cum= 11.04cum
Net Quantity for NC Work =220.80cum-11.04cum=209.76cum
3 Supplly of New E.C bag with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing with a lead of 150 M including supply of nylon thread, etc.,all complete as per approved design, specifications and direction of E/I. (5.7.53)
No of E.C Bag for NC leveling =11.04/0.034 324.71 Nos.
Total= 324.71 Nos.
Say= 325.00 Nos.
4 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I. (5.7.48)
Gabion for bed bar= 6 nos
1st Step= (9x3.6x1.5)/1.62x6 180.00 Nos
2nd Step= (9x3.6x1.5)/1.62x6 180.00 Nos
3rd Step= (9x3.6x1.0)/1.62x6 120.00 Nos
Total= 480.00 Nos
Calculation of siegnorage fee
E/W cutting = 0.00
Abstract of Cost
Name of the work : Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
Sl No. Ref. Item no. Description of Work Unit Quantity Rate Amount
1 WRD 5.1.47 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar (Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth cum 524.40 65.40 34295.76
2 5.7.52 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I. (5.7.52) Lead - 1.0 km (k) by tractor Each 210.00 1307.90 274659.00
3 5.7.53 Supplly of New E.C bag with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing with a lead of 150 M including supply of nylon thread, etc.,all complete as per approved design, specifications and direction of E/I. (5.7.53) Lead - 1.0 km (k) by tractor per % 325.00 4968.40 16147.30
4 5.7.48 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I. (5.7.48) Lead - 1.0 km (k) by tractor Each 480.00 6241.10 2995728.00
(a) TOTAL 3320830.06
(b) Add 1 % Labour cess 33208.30
Add Seignorage fees @ 10% of E/W (Cost+Royality) i.e 10% of Rs. (0+33) = Rs.3.30/cum cum 0.00 3.30 0.00
Add Seignorage fees @ 10% of local sand (Cost+Royality) i.e 10% of Rs. (0+75) = Rs.7.50/cum cum 794.35 7.50 5957.63
(c) Add S.Fee 5957.63
Grand Total (a) + (b) + (c)= 3359995.99
sub Total 3964795.27
Add 0.50% Contengency(a) 16604.15
Grand Total 3981399.42
Bill of Quantity
Name of the work : Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
Agenda No.:- 246/06/2026
ESTIMATED COST:- 3964795.00
EARNEST MONEY:- 79300
COST OF BOQ PAY ONLINE MODE:- 5000
DATE OF COMPLETION:- 15.05.2026
Sl No. Description of Work Unit Quantity Rate Amount
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar (Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth cum 524.40 65.40 34295.76
2 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I. Lead - 1.0 km (k) by tractor Each 210.00 1307.90 274659.00
3 Supplly of New E.C bag with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing with a lead of 150 M including supply of nylon thread, etc.,all complete as per approved design, specifications and direction of E/I. Lead - 1.0 km (k) by tractor per % 325.00 4968.40 16147.30
4 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I.Lead - 1.0 km (k) by tractor Each 480.00 6241.10 2995728.00
(a) TOTAL 3320830.06
(b) Add 1 % Labour cess 33208.30
Add Seignorage fees @ 10% of E/W (Cost+Royality) i.e 10% of Rs. (0+33) = Rs.3.30/cum cum 0.00 3.30 0.00
Add Seignorage fees @ 10% of local sand (Cost+Royality) i.e 10% of Rs. (0+75) = Rs.7.50/cum cum 794.35 7.50 5957.63
(c) Add S.Fee 5957.63
Grand Total = 3964795.27
CALCULATION OF BENEFIT COST RATIO
1 Name of Scheme : - : Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
a) Total average annual losses due to flood before completion of scheme . : Rs. 1080 Lacs
b) * Total average loss after completion of scheme : Rs. NIL
* Net annual benefit due to execution of scheme : Rs. 1080 Lacs
3 Investments :
a Cost of the scheme which has already engulfed in the river :
b Cost of existing work 418.00000 Lacs
c * Cost of Proposed work : Rs. 40.12287 Lacs
Total 458.12287 Lacs
Annual maintenance cost of existing scheme and proposed scheme of 17% = Total cost of the scheme x 17% = 458.12287 x 17% = 77.8808879 Rs.77.8808879 Lacs
* Benefit Cost Ratio = Net annual benefit Total investment : 1080 /536.0037579 = 2.02
* B. C. Ratio : 2.02:1
FC. Sub. Div. - 01 Naugachia F.C.Div. Naugachia
F.C.Circle , Bhagalpur F.C & Drainage , Katihar
1 Name of the Scheme :- 1. Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
2 Location :- Lt. - 25.420888 Long:- 86.981756
(i) District :- Bhagalpur
(ii) Block :- Kharik
(iii) Village :- Maircha
3 Embankment :- Village
4 Estimated Cost :- ` Rs.- 40.12287 lac
5 Benefit Cost Ratio :- 2.02 :1
6 Programme of works :- To be executed between 2026 to 2027
7 Requirement of fund :- ` Rs.- 40.12287 lac
8 Purpose of scheme :- To Protect Village Maircha, Road, school etc.
9 Area and population to protected by this project :- 1500 hect area / 3000 population.
SALIENT FEATURES
1 Name of the scheme :- 1. Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
2 Location : Lt. - 25.420888 Long:- 86.981756
3 Rivers : Koshi River
4 (a) Area affected : 1500 hectare.
(b) Area Benefited : 1500 hectare.
5 (a) Population affected : 3,000
(b) Population benefited : Same as 5 (a)
(a) Design discharge : 29380 cumecs
(b) Maximum observed H.F.L. : 34.20m
7 Flood gradient : 1:40000
8 Total cost of scheme : ` Rs.-40.12287 lac
9 Benefit Cost Ratio : 2.02 :-1
10 Period of construction : Before flood 2026
11 The frequency with which flood occurs and their probable duration : 1 in 4
12 Depth of Inundation : 1.50 m
13 Flood cess if any proposed : Nil
14 Extent of people's participation : Local people's participation is required for execution of scheme
15 Inter - state aspect : No inter state aspect
16 International aspect : No international aspect
Flood Control and Drainage,
GOVERNMENT OF BIHAR
FLOOD CONTROL & DRAINAGE
WATER RESOURCES DEPARTMENT
AGENDA NO.- 246/06/2026
NAME OF WORK :- Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
ESTIMATED COST :- Rs 39.81399 Lacs
Name of Work :- Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
Distance in (M) Towards River Edge Distance in (M) Towards River Side
1 M 2m 3m 5m 7m 10m 15m 20m Remarks
Item No. Rate Anylysis Lattipur Narayanpur Jamindari Bundh
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar ( Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) (inclusive Rs. 33.00 as royality on earth)
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator 2288 Per hour
Output of Excavator per hrour 60 Cum
(B) Cost of spreading by Dozer 175 HP
Use rate of Dozer 175 HP (Rupees per hour) 4342 Per hrour
Output of Dozer 175 HP= 300 Cum per hour 300 Cum
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28
Add Overhead charge & C.P 15 % 8.53
Sub-Total 65.41
Rs 65.40 per m3
Add Royality Rs. 0.00
Say Rs 65.40 Per M3
7.1.30 Labour for Rolling and compacting the earth in layer of 225 mm thick at O.M.C by road roller to achieve minimum 90% of maximum dry density including sprinking the required quantity of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including ,hire charge of compaction machine tanker and other tools and plant etc. all complete as per specifications and direction of E/I. ( Mode of measurment - section measurment of compacted earth)
Assuming out put= 100 Cum fill
(A) Watering for Compaction
Assumming additional moisture required 7% including 1% loss .Quantity of water required = 100 x 62.5 x 35.3 x7/10 x 100 = 1544.38 gal for 100 Cum fill 1544.38 for 100 cm fill
One imp gail = 10 lbs
Capicity of tanker 8000 gallon
Bound trip time for 8000 gal tanker =
Filling time 16 mts
Hauling (1 km ) 16 km/ hr 3.75 mts
Returnig Time @ 24 kmh 2.5 mts
Sprinkling Time at 500 gpm 16 mts
lost time 6 mts
Total time 44.25 mts
quantity hauled per hour (50 mts) = 50 x 8000/44.25 = 9040 gallon 9039.55 gallon
Use Rate of tanker (vide item 3.29b) 764 P&M-11003
Cost of Water = Rs 500 / gallon 0.27 per gallon M-191
Rate per 100 cum fill = 1544.38 x Use rate of tanker /9040 gallon = cost of water per gallon x 1544.38 551.83
(B) Hire Charge of Road roller for 100 cum
Assuming 623 cum to be rolled in 8 hrs 1.28 hrs 1612 2063.36 P&M-8001
Add Overhead charge & C.P @ 15% 392.28
Rate per cum 3007.47 30.07
Rate per cum Say Rs 30.10
5.7.52 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I.
Unit - Each bag
Taking output 100 Nos. filled Old bags in 4 No. NC
New E.C bag(p.p non uv stablized)) 100 Nos. 12.00 1200.00
Add Overhead charge & C.P 15 % 214.28
Sub-Total 1642.84
Rate of material per N.C. (25 bags per N.C.) 410.71 ….A
Unskilled mazdoor for fillign sand, stichings & 1.67 Nos. 428 714.76
Unskilled labour for carrying and placing 3 Nos. 428 1284.00
Skilled Mazdoor (For swing) 0.33 Nos. 541 178.53
Material for stiching
Stitching roll (Nylon) 2 Nos. 30.00 60.00
Hire Charge of machine
Hire Charge of stitching machine 0.33 days 50 16.50
Hire Charge of Generator (3 KVA Modified) 2.67 hrs 74 197.58
Add Overhead charge & C.P 15 % 367.71
Sub-Total 2819.08
Rate for Each NC = 704.77
Rate for N.C. in Water Portion (A+B) 1115.50 Each N.C …B
Carriage of Local sand 2.5km(u)+0.5km(k) Katcha by Tractor with royality 0.85 cum 397.75 338.09 …C
(2.25(HsbxLS+HubxLU+HkbxLK)+2.25xXa)/2.0412 Total (B+C) 1453.59
Say Rs. 1453.60 Each NC
5.7.48 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I.
Unit :- Each Bag
Taking Out put:- 40 nos.
A. Assuming out put of filling and stiching of 40 nos. of Geo-bags per day
Stitching Roll (Nylon) 2 nos 30.00 60.00
Unskilled mazdoor for filling, stacking 2 nos 428.00 856.00
Skilled mazdoor for stacking 0.33 nos 541.00 178.53
Unskilled mazdoor for carrying and placing 4 nos 428.00 1712.00
Hire charges stitching Machine 0.33 day 50.00 16.50
Hire charges Manal Trally 1 day 50.00 50.00
Hire charges Generator 3 K.V.A. modified 2.67 Hr. 74.00 197.58
Add Overhead charge & C.P 15 % 467.64
Sub total 3585.25
Rate per bag=Total / 40 89.63
Cost of filling & stiching of 18 nos of Geo bags 18 nos. 89.63 1613.34 A
Geo bag 18 nos. 92.82 1670.76
Gabion 1 nos. 2019.68 2019.68
Add Overhead charge & C.P 15 % 553.57
Sub total 4244.01 B
Hence, Cost of Gabion with Geo bag= (A) + (B) = 5857.35
Carriage of Local sand 2.5km(u)+0.5km(k) Katcha by Tractor with royality 1.26 M3 397.75 501.20
(2.25(HsbxLS+HubxLU+HkbxLK)+2.25xXa)/2.0412 6358.60
Providing and laying Geo-Bags of size 1m x 0.70 m (type A 300 GSM none woven) wt. of Bag 420 gm volume of field geo bag 0.07m3 wt. of field geo bag 126 kg with local sand including stitching on four lines by approved nylon thrade with stitching machine and generator, staking and placing after loadingunloading and carriage with held of trally withing 150m lead etc. all complete job as per specification and direction of E/I.
Unit :- Per Bag
Taking Out put:- 40 nos.
Cost of Geo Bag 40 nos. 91.00 3640.00
Stiching roll (nylon) 2 nos. 30.00 60.00
Unskilled mazdoor for filling, stacking 2 nos 428.00 856.00
Unskilled mazdoor for crrying & placing at work site 4 nos 428.00 1712.00
Skilled mazdoor for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire charges stitching machine 0.33 day 50.00 16.50
Hire charges Manal Trally 1 day 50.00 50.00
Hire charges Generator 3 K.V.A. modified 2.67 Hr. 74.00 197.58
Add Overhead charge & C.P 15 % 1023.43
Sub total 7846.43
Tota (a) +(b) 193.16 per bag A
Carriage of Local sand 2.5km(u)+0.5km(k) Katcha by Tractor with royality
(2.25(HsbxLS+HubxLU+HkbxLK)+2.25xXa)/2.0412 0.07 M3 397.75 27.84
Say 221.00 Per bag
5.7.53 Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I.
Taking output 100nos filled new bags
New E.C.Bag 100 nos 11.11 1111.00
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Total (A+B+C) 3562.37
Add Overhead charge &C.P @15% 534.36
Rate for 100 nos. N.C (A+B+C) 40.97
Rate For New E.C. Bag 41.00
Say Rs. 41.00 Each
Carriage of Local sand 2.5km(u)+0.5km(k) Katcha by Tractor with royality 0.034 M3 397.75 13.52
(2.25(HsbxLS+HubxLU+HkbxLK)+2.25xXa)/2.0412 54.52
5.7.45.1 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I (5.7.45.1)
Vide T.E.C letter no. 48(e) dated- 10.05.04
Taking output:- 10.00 sqm
Permeable synthetic Geo Textile including 5% of overlape 10.5 sqm 84.55 887.775 M-109
Mate 0.02 nos 449 8.98 SII-2
Unskilled Mazdoor 0.3 nos 428 128.4 SI-1
Skilled Mazdoor 0.1 nos 541 54.1 SII-70
Add overhead charge & C.P 15 % 161.88825
Item No. Rate Analysis
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar ( Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) (inclusive Rs. 33.00 as royality on earth)
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator 2286 Per hour
Output of Excavator per hrour 60 Cum
(B) Cost of spreading by Dozer 175 HP
Use rate of Dozer 175 HP (Rupees per hour) 4334 Per hrour
Output of Dozer 175 HP= 300 Cum per hour 300 Cum
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28
Add Overhead charge & C.P 15 % 8.52
Sub-Total 65.35
Rs 65.40 per m3
Add Royality Rs. 0.00
Say Rs 65.40 Per M3
7.1.30 Labour for Rolling and compacting the earth in layer of 225 mm thick at O.M.C by road roller to achieve minimum 90% of maximum dry density including sprinking the required quantity of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including ,hire charge of compaction machine tanker and other tools and plant etc. all complete as per specifications and direction of E/I. ( Mode of measurment - section measurment of compacted earth)
Assuming out put= 100 Cum fill
(A) Watering for Compaction
Assumming additional moisture required 7% including 1% loss .Quantity of water required = 100 x 62.5 x 35.3 x7/10 x 100 = 1544.38 gal for 100 Cum fill 1544.38 for 100 cm fill
One imp gail = 10 lbs
Capicity of tanker 8000 gallon
Bound trip time for 8000 gal tanker =
Filling time 16 mts
Hauling (1 km ) 16 km/ hr 3.75 mts
Returnig Time @ 24 kmh 2.5 mts
Sprinkling Time at 500 gpm 16 mts
lost time 6 mts
Total time 44.25 mts
quantity hauled per hour (50 mts) = 50 x 8000/44.25 = 9040 gallon 9039.55 gallon
Use Rate of tanker (vide item 3.29b) 767 P&M-11003
Cost of Water = Rs 500 / gallon 0.279 per gallon M-191
Rate per 100 cum fill = 1544.38 x Use rate of tanker /9040 gallon +cost of water per gallon x 1544.38 561.920
(B) Hire Charge of Road roller for 100 cum
Assuming 623 cum to be rolled in 8 hrs 1.28 hrs 1616 2068.48 P&M-8001
Add Overhead charge & C.P @ 15% 394.56
Rate per cum 30.25 0.30
Rate per cum Say Rs 30.25
5.7.52 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I.
Unit - Each bag
Taking output 100 Nos. filled Old bags in 4 No. NC
New E.C bag(p.p non uv stablized)) 100 Nos. 12.43 1243.00
Add Overhead charge & C.P 15 % 220.73
Sub-Total 1692.29
Rate of material per N.C. (25 bags per N.C.) 423.07 ….A
Unskilled mazdoor for fillign sand, stichings & 1.67 Nos. 428 714.76
Unskilled labour for carrying and placing 3 Nos. 428 1284.00
Skilled Mazdoor (For swing) 0.33 Nos. 541 178.53
Material for stiching
Stitching roll (Nylon) 2 Nos. 30.00 60.00
Hire Charge of machine
Hire Charge of stitching machine 0.33 days 50 16.50
Hire Charge of Generator (3 KVA Modified) 2.67 hrs 74 197.58
Add Overhead charge & C.P 15 % 367.71
Sub-Total 2819.08
Rate for Each NC = 704.77 B
Rate for N.C. in Water Portion (A+B) 1127.84 Each N.C
Carriage of Local sand 1.0km(k) by Tractor with royality 0.85 cum 211.86 180.08 …C
Total (B+C) 1307.92
Say Rs. 1307.90 Each NC
5.7.48 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I.
Unit :- Each Bag
Taking Out put:- 40 nos.
A. Assuming out put of filling and stiching of 40 nos. of Geo-bags per day
Stitching Roll (Nylon) 2 nos 30.00 60.00
Unskilled mazdoor for filling, stacking 2 nos 428.00 856.00
Skilled mazdoor for stacking 0.33 nos 541.00 178.53
Unskilled mazdoor for carrying and placing 4 nos 428.00 1712.00
Hire charges stitching Machine 0.33 day 50.00 16.50
Hire charges Manal Trally 1 day 50.00 50.00
Hire charges Generator 3 K.V.A. modified 2.67 Hr. 74.00 197.58
Add Overhead charge & C.P 15 % 477.24
Sub total 3658.85
Rate per bag=Total / 40 91.47
Cost of filling & stiching of 18 nos of Geo bags 18 nos. 91.47 1646.48 A
Geo bag 18 nos. 92.82 1670.76
Gabion 1 nos. 2092.39 2092.39
Add Overhead charge & C.P 15 % 564.47
Sub total 4327.62 B
Hence, Cost of Gabion with Geo bag= (A) + (B) = 5974.11
Carriage of Local sand 1.0km(k) by Tractor with royality 1.26 M3 211.86 266.94
Say Rs. 6241.10
Providing and laying Geo-Bags of size 1m x 0.70 m (type A 300 GSM none woven) wt. of Bag 420 gm volume of field geo bag 0.07m3 wt. of field geo bag 126 kg with local sand including stitching on four lines by approved nylon thrade with stitching machine and generator, staking and placing after loadingunloading and carriage with held of trally withing 150m lead etc. all complete job as per specification and direction of E/I.
Unit :- Per Bag
Taking Out put:- 40 nos.
Cost of Geo Bag 40 nos. 92.82 3712.80
Stiching roll (nylon) 2 nos. 30.00 60.00
Unskilled mazdoor for filling, stacking 2 nos 428.00 856.00
Unskilled mazdoor for crrying & placing at work site 4 nos 428.00 1712.00
Skilled mazdoor for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire charges stitching machine 0.33 day 50.00 16.50
Hire charges Manal Trally 1 day 50.00 50.00
Hire charges Generator 3 K.V.A. modified 2.67 Hr. 74.00 197.58
Add Overhead charge & C.P 15 % 1034.16
Sub total 7928.57
Tota (a) +(b) 198.20 per bag A
Carriage of Local sand 1.0km(k) by Tractor with royality
Say 213.00 Per bag
5.7.53 Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I.
Taking output 100nos filled new bags
New E.C.Bag 100 nos 12.43 1243.00
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Total (A+B+C) 3694.37
Add Overhead charge &C.P @15% 554.16
Rate for 100 nos. N.C (A+B+C) 4248.53
Carriage of Local sand 1.0km(k) by Tractor with royality 3.398 M3 211.86 719.90
Say Rs. 4968.40
5.7.45.1 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I (5.7.45.1)
Vide T.E.C letter no. 48(e) dated- 10.05.04
Taking output:- 10.00 sqm
Permeable synthetic Geo Textile including 5% of overlape 10.5 sqm 98.81 1037.505 M-109
Mate 0.02 nos 449 8.98 SII-2
Unskilled Mazdoor 0.3 nos 428 128.4 SI-1
Skilled Mazdoor 0.1 nos 541 54.1 SII-70
Add overhead charge & C.P 15 % 184.34775
Name of Work Restoration of Old A.E work at Maircha Village (Left bank of river Koshi) (Agenda No 246/06/2026) Cost of Work as per BOQ ₹3964795.00 Time of Completion 15.05.2026
Sl No. Items Requirement
Name of the contractor
Address of the contractor
1 Earnest Money As per NIT duly pledged in favour of Executive Engineer, Flood Control Division, Naugachhia (Pay either online or Physical mode only)
Bid Security Amount - ₹79300.00 Bid Security Amount (in ₹)
2 Time of Completion
3 Registration No.
4 KEY PERSONS Site Supervisor (Fresh Graduate in civil or Diploma civil *03years Exp. or retired I.T.I Holder.) 1
5 CHARACTER CERTIFICATE
6 Affidavit in required format (Should be after the publication date of the tender) as per letter no. 686 dated 19.08.2014)
Detailed Estimate for Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar (Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) E/I. (5.1.47)
Earth work cutting of Bed bar= 19x4.6x6 524.40 m3
Total Qty.= 524.40 m3
2 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I. (5.7.52)
NC for bed bar=6x(3.6+0.5+0.5)x8 220.80 cum
Deduct 5% Quantity for loose pitching for undulation levelling ie 5% of 220.80cum= 11.04cum
Net Quantity for NC Work =220.80cum-11.04cum=209.76cum
3 Supplly of New E.C bag with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing with a lead of 150 M including supply of nylon thread, etc.,all complete as per approved design, specifications and direction of E/I. (5.7.53)
No of E.C Bag for NC leveling =11.04/0.034 324.71 Nos.
Total= 324.71 Nos.
Say= 325.00 Nos.
4 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I. (5.7.48)
Gabion for bed bar= 6 nos
1st Step= (9x3.6x1.5)/1.62x6 180.00 Nos
2nd Step= (9x3.6x1.5)/1.62x6 180.00 Nos
3rd Step= (9x3.6x1.0)/1.62x6 120.00 Nos
Total= 480.00 Nos
Calculation of siegnorage fee
E/W cutting = 0.00
Abstract of Cost
Name of the work : Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
Sl No. Ref. Item no. Description of Work Unit Quantity Rate Amount
1 WRD 5.1.47 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar (Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth cum 524.40 65.40 34295.76
2 5.7.52 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I. (5.7.52) Lead - 1.0 km (k) by tractor Each 210.00 1307.90 274659.00
3 5.7.53 Supplly of New E.C bag with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing with a lead of 150 M including supply of nylon thread, etc.,all complete as per approved design, specifications and direction of E/I. (5.7.53) Lead - 1.0 km (k) by tractor per % 325.00 4968.40 16147.30
4 5.7.48 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I. (5.7.48) Lead - 1.0 km (k) by tractor Each 480.00 6241.10 2995728.00
(a) TOTAL 3320830.06
(b) Add 1 % Labour cess 33208.30
Add Seignorage fees @ 10% of E/W (Cost+Royality) i.e 10% of Rs. (0+33) = Rs.3.30/cum cum 0.00 3.30 0.00
Add Seignorage fees @ 10% of local sand (Cost+Royality) i.e 10% of Rs. (0+75) = Rs.7.50/cum cum 794.35 7.50 5957.63
(c) Add S.Fee 5957.63
Grand Total (a) + (b) + (c)= 3359995.99
sub Total 3964795.27
Add 0.50% Contengency(a) 16604.15
Grand Total 3981399.42
Bill of Quantity
Name of the work : Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
Agenda No.:- 246/06/2026
ESTIMATED COST:- 3964795.00
EARNEST MONEY:- 79300
COST OF BOQ PAY ONLINE MODE:- 5000
DATE OF COMPLETION:- 15.05.2026
Sl No. Description of Work Unit Quantity Rate Amount
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar (Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth cum 524.40 65.40 34295.76
2 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I. Lead - 1.0 km (k) by tractor Each 210.00 1307.90 274659.00
3 Supplly of New E.C bag with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing with a lead of 150 M including supply of nylon thread, etc.,all complete as per approved design, specifications and direction of E/I. Lead - 1.0 km (k) by tractor per % 325.00 4968.40 16147.30
4 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I.Lead - 1.0 km (k) by tractor Each 480.00 6241.10 2995728.00
(a) TOTAL 3320830.06
(b) Add 1 % Labour cess 33208.30
Add Seignorage fees @ 10% of E/W (Cost+Royality) i.e 10% of Rs. (0+33) = Rs.3.30/cum cum 0.00 3.30 0.00
Add Seignorage fees @ 10% of local sand (Cost+Royality) i.e 10% of Rs. (0+75) = Rs.7.50/cum cum 794.35 7.50 5957.63
(c) Add S.Fee 5957.63
Grand Total = 3964795.27
CALCULATION OF BENEFIT COST RATIO
1 Name of Scheme : - : Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
a) Total average annual losses due to flood before completion of scheme . : Rs. 1080 Lacs
b) * Total average loss after completion of scheme : Rs. NIL
* Net annual benefit due to execution of scheme : Rs. 1080 Lacs
3 Investments :
a Cost of the scheme which has already engulfed in the river :
b Cost of existing work 418.00000 Lacs
c * Cost of Proposed work : Rs. 40.12287 Lacs
Total 458.12287 Lacs
Annual maintenance cost of existing scheme and proposed scheme of 17% = Total cost of the scheme x 17% = 458.12287 x 17% = 77.8808879 Rs.77.8808879 Lacs
* Benefit Cost Ratio = Net annual benefit Total investment : 1080 /536.0037579 = 2.02
* B. C. Ratio : 2.02:1
FC. Sub. Div. - 01 Naugachia F.C.Div. Naugachia
F.C.Circle , Bhagalpur F.C & Drainage , Katihar
1 Name of the Scheme :- 1. Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
2 Location :- Lt. - 25.420888 Long:- 86.981756
(i) District :- Bhagalpur
(ii) Block :- Kharik
(iii) Village :- Maircha
3 Embankment :- Village
4 Estimated Cost :- ` Rs.- 40.12287 lac
5 Benefit Cost Ratio :- 2.02 :1
6 Programme of works :- To be executed between 2026 to 2027
7 Requirement of fund :- ` Rs.- 40.12287 lac
8 Purpose of scheme :- To Protect Village Maircha, Road, school etc.
9 Area and population to protected by this project :- 1500 hect area / 3000 population.
SALIENT FEATURES
1 Name of the scheme :- 1. Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
2 Location : Lt. - 25.420888 Long:- 86.981756
3 Rivers : Koshi River
4 (a) Area affected : 1500 hectare.
(b) Area Benefited : 1500 hectare.
5 (a) Population affected : 3,000
(b) Population benefited : Same as 5 (a)
(a) Design discharge : 29380 cumecs
(b) Maximum observed H.F.L. : 34.20m
7 Flood gradient : 1:40000
8 Total cost of scheme : ` Rs.-40.12287 lac
9 Benefit Cost Ratio : 2.02 :-1
10 Period of construction : Before flood 2026
11 The frequency with which flood occurs and their probable duration : 1 in 4
12 Depth of Inundation : 1.50 m
13 Flood cess if any proposed : Nil
14 Extent of people's participation : Local people's participation is required for execution of scheme
15 Inter - state aspect : No inter state aspect
16 International aspect : No international aspect
Flood Control and Drainage,
GOVERNMENT OF BIHAR
FLOOD CONTROL & DRAINAGE
WATER RESOURCES DEPARTMENT
AGENDA NO.- 246/06/2026
NAME OF WORK :- Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
ESTIMATED COST :- Rs 39.81399 Lacs
Name of Work :- Restoration of Old A.E work at Maircha Village (Left bank of river Koshi)
Distance in (M) Towards River Edge Distance in (M) Towards River Side
1 M 2m 3m 5m 7m 10m 15m 20m Remarks
Item No. Rate Anylysis Lattipur Narayanpur Jamindari Bundh
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar ( Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) (inclusive Rs. 33.00 as royality on earth)
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator 2288 Per hour
Output of Excavator per hrour 60 Cum
(B) Cost of spreading by Dozer 175 HP
Use rate of Dozer 175 HP (Rupees per hour) 4342 Per hrour
Output of Dozer 175 HP= 300 Cum per hour 300 Cum
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28
Add Overhead charge & C.P 15 % 8.53
Sub-Total 65.41
Rs 65.40 per m3
Add Royality Rs. 0.00
Say Rs 65.40 Per M3
7.1.30 Labour for Rolling and compacting the earth in layer of 225 mm thick at O.M.C by road roller to achieve minimum 90% of maximum dry density including sprinking the required quantity of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including ,hire charge of compaction machine tanker and other tools and plant etc. all complete as per specifications and direction of E/I. ( Mode of measurment - section measurment of compacted earth)
Assuming out put= 100 Cum fill
(A) Watering for Compaction
Assumming additional moisture required 7% including 1% loss .Quantity of water required = 100 x 62.5 x 35.3 x7/10 x 100 = 1544.38 gal for 100 Cum fill 1544.38 for 100 cm fill
One imp gail = 10 lbs
Capicity of tanker 8000 gallon
Bound trip time for 8000 gal tanker =
Filling time 16 mts
Hauling (1 km ) 16 km/ hr 3.75 mts
Returnig Time @ 24 kmh 2.5 mts
Sprinkling Time at 500 gpm 16 mts
lost time 6 mts
Total time 44.25 mts
quantity hauled per hour (50 mts) = 50 x 8000/44.25 = 9040 gallon 9039.55 gallon
Use Rate of tanker (vide item 3.29b) 764 P&M-11003
Cost of Water = Rs 500 / gallon 0.27 per gallon M-191
Rate per 100 cum fill = 1544.38 x Use rate of tanker /9040 gallon = cost of water per gallon x 1544.38 551.83
(B) Hire Charge of Road roller for 100 cum
Assuming 623 cum to be rolled in 8 hrs 1.28 hrs 1612 2063.36 P&M-8001
Add Overhead charge & C.P @ 15% 392.28
Rate per cum 3007.47 30.07
Rate per cum Say Rs 30.10
5.7.52 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I.
Unit - Each bag
Taking output 100 Nos. filled Old bags in 4 No. NC
New E.C bag(p.p non uv stablized)) 100 Nos. 12.00 1200.00
Add Overhead charge & C.P 15 % 214.28
Sub-Total 1642.84
Rate of material per N.C. (25 bags per N.C.) 410.71 ….A
Unskilled mazdoor for fillign sand, stichings & 1.67 Nos. 428 714.76
Unskilled labour for carrying and placing 3 Nos. 428 1284.00
Skilled Mazdoor (For swing) 0.33 Nos. 541 178.53
Material for stiching
Stitching roll (Nylon) 2 Nos. 30.00 60.00
Hire Charge of machine
Hire Charge of stitching machine 0.33 days 50 16.50
Hire Charge of Generator (3 KVA Modified) 2.67 hrs 74 197.58
Add Overhead charge & C.P 15 % 367.71
Sub-Total 2819.08
Rate for Each NC = 704.77
Rate for N.C. in Water Portion (A+B) 1115.50 Each N.C …B
Carriage of Local sand 2.5km(u)+0.5km(k) Katcha by Tractor with royality 0.85 cum 397.75 338.09 …C
(2.25(HsbxLS+HubxLU+HkbxLK)+2.25xXa)/2.0412 Total (B+C) 1453.59
Say Rs. 1453.60 Each NC
5.7.48 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I.
Unit :- Each Bag
Taking Out put:- 40 nos.
A. Assuming out put of filling and stiching of 40 nos. of Geo-bags per day
Stitching Roll (Nylon) 2 nos 30.00 60.00
Unskilled mazdoor for filling, stacking 2 nos 428.00 856.00
Skilled mazdoor for stacking 0.33 nos 541.00 178.53
Unskilled mazdoor for carrying and placing 4 nos 428.00 1712.00
Hire charges stitching Machine 0.33 day 50.00 16.50
Hire charges Manal Trally 1 day 50.00 50.00
Hire charges Generator 3 K.V.A. modified 2.67 Hr. 74.00 197.58
Add Overhead charge & C.P 15 % 467.64
Sub total 3585.25
Rate per bag=Total / 40 89.63
Cost of filling & stiching of 18 nos of Geo bags 18 nos. 89.63 1613.34 A
Geo bag 18 nos. 92.82 1670.76
Gabion 1 nos. 2019.68 2019.68
Add Overhead charge & C.P 15 % 553.57
Sub total 4244.01 B
Hence, Cost of Gabion with Geo bag= (A) + (B) = 5857.35
Carriage of Local sand 2.5km(u)+0.5km(k) Katcha by Tractor with royality 1.26 M3 397.75 501.20
(2.25(HsbxLS+HubxLU+HkbxLK)+2.25xXa)/2.0412 6358.60
Providing and laying Geo-Bags of size 1m x 0.70 m (type A 300 GSM none woven) wt. of Bag 420 gm volume of field geo bag 0.07m3 wt. of field geo bag 126 kg with local sand including stitching on four lines by approved nylon thrade with stitching machine and generator, staking and placing after loadingunloading and carriage with held of trally withing 150m lead etc. all complete job as per specification and direction of E/I.
Unit :- Per Bag
Taking Out put:- 40 nos.
Cost of Geo Bag 40 nos. 91.00 3640.00
Stiching roll (nylon) 2 nos. 30.00 60.00
Unskilled mazdoor for filling, stacking 2 nos 428.00 856.00
Unskilled mazdoor for crrying & placing at work site 4 nos 428.00 1712.00
Skilled mazdoor for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire charges stitching machine 0.33 day 50.00 16.50
Hire charges Manal Trally 1 day 50.00 50.00
Hire charges Generator 3 K.V.A. modified 2.67 Hr. 74.00 197.58
Add Overhead charge & C.P 15 % 1023.43
Sub total 7846.43
Tota (a) +(b) 193.16 per bag A
Carriage of Local sand 2.5km(u)+0.5km(k) Katcha by Tractor with royality
(2.25(HsbxLS+HubxLU+HkbxLK)+2.25xXa)/2.0412 0.07 M3 397.75 27.84
Say 221.00 Per bag
5.7.53 Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I.
Taking output 100nos filled new bags
New E.C.Bag 100 nos 11.11 1111.00
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Total (A+B+C) 3562.37
Add Overhead charge &C.P @15% 534.36
Rate for 100 nos. N.C (A+B+C) 40.97
Rate For New E.C. Bag 41.00
Say Rs. 41.00 Each
Carriage of Local sand 2.5km(u)+0.5km(k) Katcha by Tractor with royality 0.034 M3 397.75 13.52
(2.25(HsbxLS+HubxLU+HkbxLK)+2.25xXa)/2.0412 54.52
5.7.45.1 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I (5.7.45.1)
Vide T.E.C letter no. 48(e) dated- 10.05.04
Taking output:- 10.00 sqm
Permeable synthetic Geo Textile including 5% of overlape 10.5 sqm 84.55 887.775 M-109
Mate 0.02 nos 449 8.98 SII-2
Unskilled Mazdoor 0.3 nos 428 128.4 SI-1
Skilled Mazdoor 0.1 nos 541 54.1 SII-70
Add overhead charge & C.P 15 % 161.88825
Item No. Rate Analysis
1 Earth work by excavtor and spreader or tractor- leveller in lower level canal or flood embankment or dhar ( Like, Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not neaded ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in odinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with.all lifts all complete job as per specifications and direction of E/I. ( mode of measurement-sectional measurement of compacted earth ) (inclusive Rs. 33.00 as royality on earth)
(A) Cost of cutting, loading , unloading & placing by excavator 1 M3 capacity
Use rate of Excavator 2286 Per hour
Output of Excavator per hrour 60 Cum
(B) Cost of spreading by Dozer 175 HP
Use rate of Dozer 175 HP (Rupees per hour) 4334 Per hrour
Output of Dozer 175 HP= 300 Cum per hour 300 Cum
( C) For dressing & finishing one labour for 100 M3
Unskilled labour 0.01 no 428.00 4.28
Add Overhead charge & C.P 15 % 8.52
Sub-Total 65.35
Rs 65.40 per m3
Add Royality Rs. 0.00
Say Rs 65.40 Per M3
7.1.30 Labour for Rolling and compacting the earth in layer of 225 mm thick at O.M.C by road roller to achieve minimum 90% of maximum dry density including sprinking the required quantity of water by tanker within 1 km. lead and all lifts including cost of water, finishing the surface with proper grade, camber or superelevation including ,hire charge of compaction machine tanker and other tools and plant etc. all complete as per specifications and direction of E/I. ( Mode of measurment - section measurment of compacted earth)
Assuming out put= 100 Cum fill
(A) Watering for Compaction
Assumming additional moisture required 7% including 1% loss .Quantity of water required = 100 x 62.5 x 35.3 x7/10 x 100 = 1544.38 gal for 100 Cum fill 1544.38 for 100 cm fill
One imp gail = 10 lbs
Capicity of tanker 8000 gallon
Bound trip time for 8000 gal tanker =
Filling time 16 mts
Hauling (1 km ) 16 km/ hr 3.75 mts
Returnig Time @ 24 kmh 2.5 mts
Sprinkling Time at 500 gpm 16 mts
lost time 6 mts
Total time 44.25 mts
quantity hauled per hour (50 mts) = 50 x 8000/44.25 = 9040 gallon 9039.55 gallon
Use Rate of tanker (vide item 3.29b) 767 P&M-11003
Cost of Water = Rs 500 / gallon 0.279 per gallon M-191
Rate per 100 cum fill = 1544.38 x Use rate of tanker /9040 gallon +cost of water per gallon x 1544.38 561.920
(B) Hire Charge of Road roller for 100 cum
Assuming 623 cum to be rolled in 8 hrs 1.28 hrs 1616 2068.48 P&M-8001
Add Overhead charge & C.P @ 15% 394.56
Rate per cum 30.25 0.30
Rate per cum Say Rs 30.25
5.7.52 Supplly of New bag and N.C. with labour for filling New E.C. bag with local sand (volume of filled bag 1.2 cft and weight 50kg), stiching on two lines by approved nylon thread with stiching machine & generator, Stacking the bags and placing in Nylon Crate of size (1.2m x 1m x 1m) with a lead of 150 M including supply of nylon crate, etc., placing the filled crates in Dry portion within a lead 30 M, all complete as per approved design, specifications and direction of E/I.
Unit - Each bag
Taking output 100 Nos. filled Old bags in 4 No. NC
New E.C bag(p.p non uv stablized)) 100 Nos. 12.43 1243.00
Add Overhead charge & C.P 15 % 220.73
Sub-Total 1692.29
Rate of material per N.C. (25 bags per N.C.) 423.07 ….A
Unskilled mazdoor for fillign sand, stichings & 1.67 Nos. 428 714.76
Unskilled labour for carrying and placing 3 Nos. 428 1284.00
Skilled Mazdoor (For swing) 0.33 Nos. 541 178.53
Material for stiching
Stitching roll (Nylon) 2 Nos. 30.00 60.00
Hire Charge of machine
Hire Charge of stitching machine 0.33 days 50 16.50
Hire Charge of Generator (3 KVA Modified) 2.67 hrs 74 197.58
Add Overhead charge & C.P 15 % 367.71
Sub-Total 2819.08
Rate for Each NC = 704.77 B
Rate for N.C. in Water Portion (A+B) 1127.84 Each N.C
Carriage of Local sand 1.0km(k) by Tractor with royality 0.85 cum 211.86 180.08 …C
Total (B+C) 1307.92
Say Rs. 1307.90 Each NC
5.7.48 Providing and laying and geo bags of size 1m x 0.70m (type A 300 GSM non woven) weight of bag 420 gm volume of filled bag 0.07 m3, weight of filled geo bag 126 kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator staking and placing in gabion of size 1.80 m x 1.80m x 0.50 m (18 nos geo bag per gabion) after loading, unloading and carriage with the help of trolley within 150m lead including cess all complete job as per specification and direction of E/I.
Unit :- Each Bag
Taking Out put:- 40 nos.
A. Assuming out put of filling and stiching of 40 nos. of Geo-bags per day
Stitching Roll (Nylon) 2 nos 30.00 60.00
Unskilled mazdoor for filling, stacking 2 nos 428.00 856.00
Skilled mazdoor for stacking 0.33 nos 541.00 178.53
Unskilled mazdoor for carrying and placing 4 nos 428.00 1712.00
Hire charges stitching Machine 0.33 day 50.00 16.50
Hire charges Manal Trally 1 day 50.00 50.00
Hire charges Generator 3 K.V.A. modified 2.67 Hr. 74.00 197.58
Add Overhead charge & C.P 15 % 477.24
Sub total 3658.85
Rate per bag=Total / 40 91.47
Cost of filling & stiching of 18 nos of Geo bags 18 nos. 91.47 1646.48 A
Geo bag 18 nos. 92.82 1670.76
Gabion 1 nos. 2092.39 2092.39
Add Overhead charge & C.P 15 % 564.47
Sub total 4327.62 B
Hence, Cost of Gabion with Geo bag= (A) + (B) = 5974.11
Carriage of Local sand 1.0km(k) by Tractor with royality 1.26 M3 211.86 266.94
Say Rs. 6241.10
Providing and laying Geo-Bags of size 1m x 0.70 m (type A 300 GSM none woven) wt. of Bag 420 gm volume of field geo bag 0.07m3 wt. of field geo bag 126 kg with local sand including stitching on four lines by approved nylon thrade with stitching machine and generator, staking and placing after loadingunloading and carriage with held of trally withing 150m lead etc. all complete job as per specification and direction of E/I.
Unit :- Per Bag
Taking Out put:- 40 nos.
Cost of Geo Bag 40 nos. 92.82 3712.80
Stiching roll (nylon) 2 nos. 30.00 60.00
Unskilled mazdoor for filling, stacking 2 nos 428.00 856.00
Unskilled mazdoor for crrying & placing at work site 4 nos 428.00 1712.00
Skilled mazdoor for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire charges stitching machine 0.33 day 50.00 16.50
Hire charges Manal Trally 1 day 50.00 50.00
Hire charges Generator 3 K.V.A. modified 2.67 Hr. 74.00 197.58
Add Overhead charge & C.P 15 % 1034.16
Sub total 7928.57
Tota (a) +(b) 198.20 per bag A
Carriage of Local sand 1.0km(k) by Tractor with royality
Say 213.00 Per bag
5.7.53 Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I.
Taking output 100nos filled new bags
New E.C.Bag 100 nos 12.43 1243.00
Stiching Roll(Nylon) 2 nos 30.00 60.00
Unskilled labour for filling,stacking 1.67 nos 428.00 714.76
Unskilled labour for crrying &placing at work site 3 nos 428.00 1284.00
Skilled labour for stiching 0.33 nos 541.00 178.53
Hire Charge of Machine
Hire Charge of Stiching Machine 0.33 day 50.00 16.50
Hire charge of Generator 3KVA 2.67 hrs 74.00 197.58
Total (A+B+C) 3694.37
Add Overhead charge &C.P @15% 554.16
Rate for 100 nos. N.C (A+B+C) 4248.53
Carriage of Local sand 1.0km(k) by Tractor with royality 3.398 M3 211.86 719.90
Say Rs. 4968.40
5.7.45.1 Providing and Laying of a Geo-textile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching/cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specifications and direction of E/I (5.7.45.1)
Vide T.E.C letter no. 48(e) dated- 10.05.04
Taking output:- 10.00 sqm
Permeable synthetic Geo Textile including 5% of overlape 10.5 sqm 98.81 1037.505 M-109
Mate 0.02 nos 449 8.98 SII-2
Unskilled Mazdoor 0.3 nos 428 128.4 SI-1
Skilled Mazdoor 0.1 nos 541 54.1 SII-70
Add overhead charge & C.P 15 % 184.34775
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT2.pdf
NIT • 1.70 MB
order_0200.pdf
NIT • 0.38 MB
4162.pdf
NIT • 0.38 MB
LETTER NO. 704.doc
NIT • 0.54 MB
LETTER NO.274.doc
NIT • 0.34 MB
letter_0050_m.pdf
NIT • 0.50 MB
letter_0633_m.pdf
NIT • 0.13 MB
letter_686.pdf
NIT • 0.40 MB
letter_0719_m.pdf
NIT • 1.10 MB
ltr.915 dtd. 24.12.2022.pdf
NIT • 0.42 MB
HC Patna stayed limitless below in Tender.pdf
NIT • 0.62 MB
Reference Letters.doc
NIT • 35.61 MB
NIT2.pdf
NIT • 1.70 MB
maircha.xlsx
NIT • 0.12 MB
TECHSHEETMAIRCHA.xls
NIT • 0.02 MB
TENDERDOCMAIRCHA.doc
NIT • 2.10 MB
SANCTIONED BOQ MAIRCHA.pdf
NIT • 0.62 MB
maircha.xlsx
NIT • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .