Tender Value
₹36.3 L
EMD Value
₹36,400
Closing Date
14 Nov 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development officer vpt Kilpennathur
Block development officer vpt Kilpennathur
Providing Infrastructure Development works to AGAMT 2022-23 Village Panchayat at Kadambai Panchayat in Kilpennathur Block.
2022_RDTN_262443_1
Roc.No.1442_2022_A1 Dt.01.11.2022
Open Tender
Civil Works
Item Rate
180 days
Kilpennathur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹36,400
28 Dec 2022
9 Nov 2022
14 Nov 2022
9 Nov 2022
14 Nov 2022
9 Nov 2022
Amount
Part I : Rejuvenation of Nochi kulam with Construction of Batting Ghat and inlet and Lining wall in kadambai inpanchayat.
Desilting of Nochi kulam in Kadambai Panchayat. (50.0 x 40.0m )
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
In Let & Out Let
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Construction of Baby Pond Lining wall to 0 Kulam in 0 Panchayat.
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Construction of Bhathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Name Board
Construction Of Retaining Wall
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Part II : Construction of Cement Concrete Pavement Road Old Colony (65m) in Kadambai panchayat.
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part III : Construction of Cement Concrete Pavement Road New Colony Kali Koil Street (68m) @ Kadambai panchayat.
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part IV : Construction of Cement Concrete Pavement Road Vaijayanthi Nagar 2nd Street (99m) @ Kadambai panchayat.
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part V : Construction of Ndw PDS Building in Sirukothan @ Kadambai Panchayat (Type - II)
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Supplying and filling in foundation and basement with filling sand including water consolidating etc.,
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly including cost and conveyance and all labour charges etc.
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly including cost and conveyance and all labour charges etc.
Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3(Basement)
Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3(Superstructure)
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing
Supplying and erecting centering shuttering including necessary supports for plane etc., complete.BGL
Supplying and erecting centering shuttering including necessary supports for plane etc., complete.AGL
Floor finish with granolithic flooring in CC 1:2:4 mix using 10 to 12mm chips for 40mm thick including cost and conveyance of all materials and labours etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per Sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. (The ceramic tiles should be got approved from the Departmental officers before execution).
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. The Glazed tiles should be got approved from the Departmental officers before execution.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Finishing the top of the roof with one course of pressed tiles of size 20cm
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete(ROOF BOTTOM)
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior emulsion two coats using best freshly burnt shell lime in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete
Supplying of steel doors, windows, ventilators etc., with best approved best quality etc., complete complying with standard specifications and as directed by the departmental officers.
Door D
Doors D1
Window W(1.00x1.30)m
Ventilator V (0.90x0.60)
Rolling Shutter
Rolling Shutter 1
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Labour Charges for Fixing the Doors inculding all Charges etc..
Labour Charges for Fixing theSteel Window inculding all Charges etc..
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board including all cost and conveyance and all labour charges etc .comp.
Cost and Supply of Oriya Type Indian Baby friendly water closet with p of s trap etc…(white)
Supply and fixixng of 1000 litre HDPE tank
Provision For Electrification
Provision for PVC Specials
Provision for RWH
Providing of Name Board
Part VI : Construction of School New Girls Toilet for PUMS at Kadambai panchayat.
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Refilling the basement with excavated earth other than sand complying theStandard specification
RCC 1: 1 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X
Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering surfaces of RCC items such as slabs,beams,sunshades with cement mortar 1:3 -10mm thick including packing, providing cement mortar beading for sunshades staircase ,steps, lands slabs etc.,as directed by departmental officers etc, complete compl
Supply and fixing and position of MS doors with single leaf. The door outer frame will be 40x40x6mm MS angle, the shutter frame will be 35x35x6 mm, MS angle intermediate stiffner will be 35x35x6 mm with cross stiffner 25x 25x5 mm flats covere
Doors D
Doors D1
Supplying and fixing in position Indian water closet of size 580 X 440mm, white glazed earthen ware of approved quality with 'P' trap or 'S' trap confirming to IS:2556 -Part XII with sand cushion and forming the closet using 40mm broken brick jelly in lim
Urinals Gents
Wash Basin
25mm PVC Pipe
25mm PVC Bend
25mm PVC Tee
90mm PVC Pipe
90mm PVC Bend
90mm PVC Tee
Paving the floor with plain/design ceramic tiles (colour and shade as directed) of size 200 mm x 200mmx6mm in all floors over a base layer of cement mortar 1:3 (one cement and three sand ) 20mm thick laid in-situ and pointed with same coloured cement as
Dadooing walls with Glazed tiles of sizes 150mm X150mm X 6mm size of approved make and quality and colour lSet in cement mortar 1:2 (one cement ,two sand) over 10 mm base layer plastering and pointing with white cement neatly as directed.
Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm x 2 cm approved qty with,CM.1:3 12 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc
Distembering two coats of oil bound distember using one coat of primer coat including cost & conveyance to size and all labour charges etc., complete.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .
Painting two coats of new iron work with best quality synthetic enamel paint of approved quality and colour with priming coat including the cost all materials etc.,complete, in all floors.
Provision for Electical arrangements
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Arunai Infra
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .