Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹1.4 Cr | L1 | Accepted-AOC Accepted being L1 |
| 2 | L2₹1.5 Cr+₹4.3 L (2.95%)Rejected-Finance NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹1.5 Cr+₹4.3 L (2.95%) | L2 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 3 | L3₹1.5 Cr+₹10.1 L (6.99%)Rejected-Finance 606 80 FEET ROAD 7TH BLOCK 2ND PHASE BANASHANKARI 3RD STAGE BANGALORE 560 085 | BENGALURU URBAN | KARNATAKA | 560085 | ₹1.5 Cr+₹10.1 L (6.99%) | L3 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 4 | L4₹1.6 Cr+₹10.9 L (7.53%)Rejected-Finance | ₹1.6 Cr+₹10.9 L (7.53%) | L4 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 5 | L5₹1.6 Cr+₹11.0 L (7.62%)Rejected-Finance | ₹1.6 Cr+₹11.0 L (7.62%) | L5 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| Sl No | Description | Qty | Unit | UNIVERSAL ENGINEERING L2 | devan enterprises L1 | LAKSHMI CONSTRUCTIONS L8 | M/S SRI BALAJI ENTERPRISES L6 | Maruthi constructions L9 | RAMESH BABU CO L4 | VARGHESECHACKO AND CO L10 | Moulya Builders L7 | RMK PROJECTS L11 | Lucky Enterprises L3 | SREE BUILDERS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth for laying of cable, foundation, laying of pipe line and getting out in soft/loose soil all as specified and directed . | 827.01 | Cum | 360 ₹2,97,723.6 | 380 ₹3,14,263.8 | 420 ₹3,47,344.2 | 300 ₹2,48,103 Lowest | 410 ₹3,39,074.1 | 300 ₹2,48,103 Lowest | 601 ₹4,97,033.01 | 410 ₹3,39,074.1 | 363 ₹3,00,204.63 | 380 ₹3,14,263.8 | 400 ₹3,30,804 |
| 2.00 | Returning, filling in including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and directed. | 650.69 | Cum | 90 ₹58,562.1 | 100 ₹65,069 | 85 ₹55,308.65 | 90 ₹58,562.1 | 60 ₹39,041.4 Lowest | 90 ₹58,562.1 | 110 ₹71,575.9 | 125 ₹81,336.25 | 108 ₹70,274.52 | 110 ₹71,575.9 | 90 ₹58,562.1 |
| 3.00 | Removing surplus excavated material to a distance not exceeding 50 meter and deposting where diserted at a level not exc. 1.50m above the starting point complete all as specified and directed. | 35.18 | Cum | 130 ₹4,573.4 | 160 ₹5,628.8 | 125 ₹4,397.5 | 125 ₹4,397.5 | 15 ₹527.7 Lowest | 125 ₹4,397.5 | 125 ₹4,397.5 | 125 ₹4,397.5 | 170 ₹5,980.6 | 180 ₹6,332.4 | 130 ₹4,573.4 |
| 4.00 | M&L as in replacement for Ductile Iron Pipe (DI Pipes), ISI marked, Class K-7, 200 mm dia laid in trenches including jointing material such as EPDM Rubber Gasket and suitable type of Grease etc complete all as specified and directed.
Note :- (i) DI fitting/special will be measured and paid separately.
(ii) Excavation & earthwork shall be measured & paid seperately | 18 | RM | 3,950 ₹71,100 | 4,100 ₹73,800 | 4,200 ₹75,600 | 4,000 ₹72,000 | 4,000 ₹72,000 | 3,700 ₹66,600 | 3,800 ₹68,400 | 3,450 ₹62,100 Lowest | 4,250 ₹76,500 | 4,280 ₹77,040 | 3,500 ₹63,000 |
| 5.00 | M&L as in replacement for Ductile Iron Pipe (DI Pipes), ISI marked, Class K-7, 150 mm dia laid in trenches including jointing material such as EPDM Rubber Gasket and suitable type of Grease etc complete all as specified and directed.
Note :- (i) DI fitting/special will be measured and paid separately.
(ii) Excavation & earthwork shall be measured & paid seperately | 12 | RM | 3,300 ₹39,600 | 3,300 ₹39,600 | 4,200 ₹50,400 | 3,300 ₹39,600 | 3,600 ₹43,200 | 3,300 ₹39,600 | 3,200 ₹38,400 | 3,100 ₹37,200 Lowest | 4,249 ₹50,988 | 3,680 ₹44,160 | 4,000 ₹48,000 |
| 6.00 | M&L as in replacement for Ductile Iron Pipe (DI Pipes), ISI marked, Class K-7, 100 mm dia laid in trenches including jointing material such as EPDM Rubber Gasket and suitable type of Grease etc complete all as specified and directed.
Note :- (i) DI fitting/special will be measured and paid separately.
(ii) Excavation & earthwork shall be measured & paid seperately | 1,340 | RM | 2,800 ₹37,52,000 | 2,780 ₹37,25,200 | 2,900 ₹38,86,000 | 2,800 ₹37,52,000 | 2,975 ₹39,86,500 | 2,700 ₹36,18,000 | 3,200 ₹42,88,000 | 2,650 ₹35,51,000 Lowest | 3,375 ₹45,22,500 | 2,980 ₹39,93,200 | 2,700 ₹36,18,000 |
| 7.00Note :- (a) In case of laying of CI/GI/DI pipe line is to be executed in civil area, it will be the responsibility of the contractor to obtain necessary permission for cutting of road & berm from BWSSB. | ||||||||||||||
| 8.00(b) For this purpose amount to be paid online to BWSSB, same is deemed to be included in unit quoted rate. | ||||||||||||||
| 9.00(c) The T&P like JCB, Drill Machine, Moveable Generator etc required for cutting of road shall be arranged by the contractor & no extra cost shall be paid for the same. | ||||||||||||||
| 10.00(d) After execution of work, the contractor will make good disturbed portion of road with bitumen or PCC complete as directed by Engineer-in-Charge. | ||||||||||||||
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
5 Nov 2025, 6:00 pmClosed
Garrison Engineer M AF Jalahalli
Garrison Engineer M AF Jalahalli Bangalore 560013
SPECIAL REPAIR TO RENEWAL REPLACEMENT OF MAIN OLD VINTAGE WATER PIPE LINE WITH CONNECTED WORK FROM RANGE PUMP HOUSE TO SURAKSHA ENCLAVE AND CERTAIN OTHER LOCATIONS CHLORINE PLANT AND CONNECTED WORKS AGAINST BER PROVN OF FLAME PROOF AC AND ALLIED SER
2025_MES_734305_1
8223/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Garrison Engineer M AF Jalahalli
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Garrison Engineer M AF Jalahalli
₹2.3 L
15 Nov 2025
8 Oct 2025
12 Nov 2025
8 Oct 2025
5 Nov 2025
29 Oct 2025
8 Oct 2025 - 15 Oct 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
8223GENPAGE.pdf
Tender Documents • 0.21 MB
BOQ_822223.xls
BOQ • 0.36 MB
8223PS.pdf
Additional Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .