| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.7 LAccepted-Finance | ₹91.7 L | L1 | Accepted-Finance Consistent(Responsive) |
| 2 | L2₹92.1 L+₹37,649.97 (0.41%)Rejected-Finance | ₹92.1 L+₹37,649.97 (0.41%) | L2 | Rejected-Finance In Consistent(Non-Responsive) |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Rejected-Technical | - | - | Rejected-Technical All Mandatory document are Not submitted as per ITB in the SBD |
Tender Value
Refer Docs
EMD Value
₹96,536
Closing Date
5 Jan 2024, 12:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Engineering Wing Department of Education
Construction of Boundary Wall at Govt. Engineering college, Toru
2023_ARED_1516_1
EDN(EW)/Plg-015/2021/114
Open Tender
Civil Works
Item Rate
360 days
Sagalee
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,500
Payable To Executive Engineer
₹96,536
itanagar
23 Jan 2024
22 Dec 2023
5 Jan 2024
22 Dec 2023
5 Jan 2024
22 Dec 2023
28 Dec 2023
Amount
Boundary Wall
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth. sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m.
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plint
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. a) 1 : 1 : 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size).
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete.a) TMT bars
Centring and shuttering including strutting, propping etc. and removal of form work for: a) Foundation, footings, bases of columns etc. and mass concrete.
e) Column, pillars, posts and struts etc.
d) Lintels, beams, girders, bressumers and cantilevers etc.Beam
Brick work with best available local bricks in foundation and plinth in cement mortar 1:3 (1 cement : 3 fine sand).
12 mm thick cement plaster 1:3( 1 cement : 3 fine sand)
Applying one coat of cement primer of approved brand and manufacture on wall surface.
Finishing walls with water proofing cement paint of approved brand and manufacture and required shade on new work (three or more coats) to give an even shade
Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. In Flats up to 10 mm in thickness
GI Barbed Wire
Carriage of Materials
M/s Zeeman Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .