Loading…
Loading…
Updated dates
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
29 Jun 2026, 11:00 am5d left
Similar tender results from the same govt authority in the past 3 years.
SE EDC-I BSR
SE EDC-I HYDEL COLONY BULANDSHAHR
In case of natural calamities/accidental damage to poles/electric wire theft/long span, immediate restoration of power supply by installing poles/wires as per requirement.
2026_PVVNL_1160008_1
T-80/EDC-I/B/2025-26
Open Tender
Electrical Works
30 days
BULANDSHAHR
PLZ REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
SE EDC-I
₹5,000
13 Jun 2026
13 Jun 2026
29 Jun 2026
13 Jun 2026
29 Jun 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | fo|qr forj.k [k.M&cqyUn'kgj ¼xzkeh.k½] ds vUrxZr fo0fo0m0[k0&izFke vkSjxkackn ,oa f}rh; VkaM+k cqyUn'kgj ds dk;Z{ks= esa iqokZuqeku dks ns[krs gq, ¼nSoh; vkink½ ls mRiUu gksus ,oa vkdfLed@vkikrdkyhu czsdMkmu dh fLFkfr esa ;Fkk”kh?kz vVS.M dj fo|qr vkiwfrZ O;oLFkk lqpk: j[kus laca/kh dk;ZA | - | - | - | - |
| 1 | Carmage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres 2 at both ends, roquried for proper completion of work, distance about to 50Kms. | - | - | - | - |
| 2 | PCC Pole 8.5/09 mtr Long. | 1 | Nos. | - | - |
| 3 | PCC Pole 11/13 mtr Long. | 1 | Nos. | - | - |
| 4 | Carriage of All line Material from store to je store Sub station/at site of work as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. | 1 | Qtl. | - | - |
| 5 | Erection of pole 8.5/09 mtr long support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 1 | Nos. | - | - |
| 6 | Erection of pole 11/13 mtr long support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 1 | Nos. | - | - |
| 7 | Grouting of pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8-30x3030 cms, including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour. T&P and camer etc. required for proper completion of work. | 1 | Nos. | - | - |
| 8 | Laying, sagging Stringing and binding and jumpering of ACSR Weasel conductoron the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. | 1 | mtr. | - | - |
| 9 | Carriage of ABC Cable diffrent size the newly erected pole as per RESPO manual and as per direction of supervising engineer, it includes the cost of labour, T&P, carrier etc requried for proper completion of work | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
T80PDF.pdf
Tender Documents • 1.18 MB
BOQ_2174017.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid