Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -27.10% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -24.99% | ₹2.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | -24.40% | ₹3.0 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | -24.16% | ₹3.0 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
18 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Repair and renovation of Shamshaan Ghat pyt. kotli bajalian Pyt KOTLI BAJALIAN Block Katra Distt Reasi under capex BDC for the year 2026-27
2026_RDPR_320213_21
e-NIT No. 94 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
120 days
REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
MH 0515
₹7,840
26 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 7.05 | Cum | 479.3 | ₹3,379.07 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.12 | Cum | 4,826.5 | ₹10,232.18 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 19.98 | Cum | 5,733.6 | ₹1,14,557.33 |
| 4 | Centring and shuttering including strutting propping etc and removal of formwork for: foundation footings,bases of columns etc for mass concrete. | 30.86 | sqm | 286.35 | ₹8,836.76 |
| 5 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 coarse sand) | 50.14 | sqm | 306.85 | ₹15,385.46 |
| 6 | Structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 1,600 | KG | 138.2 | ₹2,21,120 |
| 7 | Carriage of sand and Aggregates from an avg. distance of 30.00 K.M by MT | 30 | Cum | 520.34 | ₹15,610.2 |
| 8 | cost of CIB including concrete/Brick Pedestal of Size 3'x2' plastering, painting all complete job (as per direction of Engineer Incharge) | 1 | No. | 3,000 | ₹3,000 |
stage.html
html • 0.02 MB
finance_1065521.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_1065521.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].