| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.5 LAccepted-AOC AT ANLAGUNJA PO KUSUMBANDH DIST MAYURBHANJ PIN 757092 | ANLAGUNJA | MAYURBHANJ | ODISHA | 757092 | ₹40.5 L Quoted ₹10.9 L | 1 | Accepted-AOC successful bidder |
| 2 | 1₹10.9 LRejected-AOC | ₹10.9 L | 1 | Rejected-AOC unsuccessful bidder |
| 3 | 1₹10.9 LRejected-AOC | ₹10.9 L | 1 | Rejected-AOC unsuccessful bidder |
| 4 | 1₹10.9 LRejected-AOC | ₹10.9 L | 1 | Rejected-AOC unsuccessful bidder |
| 5 | 1₹10.9 LRejected-AOC | ₹10.9 L | 1 | Rejected-AOC unsuccessful bidder |
Tender Value
₹47.6 L
EMD Value
₹47,620
Closing Date
19 Dec 2025, 5:00 pmClosed
S.E.R.W.Division, Baripada
S.E.R.W.Division, Baripada
Construction of Smart class room of Laxmikanta Higher Secondary school at Bangriposi in the district of Mayurbhanj for the year 2024-25.
2025_CERWI_122923_11
11(Online)/RWD/BPD/2025-26
Open Tender
Civil Works - Buildings
270 days
Baripada
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹47,620
Yes
28 May 2026
11 Dec 2025
19 Dec 2025
11 Dec 2025
19 Dec 2025
11 Dec 2025
11 Dec 2025 - 19 Dec 2025
Civil
Earth work in excavation of foundation trenches in hard soil including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring & Shuttering if required etc.complete as directed by the Engineer-in-charge
Supplying, filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P required for the work etc. complete as directed by the Engineer-in-charge
Cement concrete(1:3:6) in foundation and plinth below the base course of flooring using 4cm size black hard hand broken granite stone metals of approved quality from approved quarry including lowering laying concrete watering and curing etc.complete to required levels laid in layers not exceeding 6" thick including cost,conveyance,royalties and all taxes of all materials and cost of all labour with T & P required for the work complete.
Brick masonary in cement mortar (1:6) using Flyash Bricks of size 10"x5"x3" having crushing strength not lessthan 75 Kg/Cm2 in Foundation and Plinth after immersing the bricks for six hours in water before use in all floors with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge.
Brick masonary in cement mortar (1:6) using Flyash Bricks of size 10" x 5" x 3" having crushing strength not lessthan 75 Kg/Cm2 in super structure after immersing the bricks for six hours in water before use in superstructure in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge.
First Floor
Second Floor
R.C.C.work of M25 having a minimum comprresive strength 250 kg/Cm2 of 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 20mm down grade size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods as per direction of Engineer-in-charge.
Column Base & Grade beam
Column & Beam
First Floor
Second Floor
Lintel
First Floor
Second Floor
Chajja
First Floor
Second Floor
Staircase
First Floor
Roof slab
First Floor
Second Floor
Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire cost and conveyance of HYSD bars complete in all respect as per specification and direction of Engineer-in-Charge.
First Floor
Second Floor
6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry treatment with cost, conveyance, royalties and all taxes of all materials and cost of all labour with T & P required for the work complete.
First Floor
16mm thick cement plaster (1:6)in finished smooth to outside smooth surface of brick walls afrer racking out joints including watering and curing etc.complete with cost,conveyance royalties,all taxes and cost of all materials and cost of all labour with T&P requred for the work complete. as per the direction of Engineer in Charge.
First Floor
Second Floor
12mm thick cement plaster (1:6)in finished smooth to outside smooth surface of brick walls afrer racking out joints including watering and curing with cost, conveyance taxes and royalties of all materials and cost of all labour with T&P requred for the work complete as per the direction of Engineer in Charge.
First Floor
Second Floor
Fixing Vetrified tiles in floors,treads and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile.
First Floor
Fixing Vetrified tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile.
First Floor
Supplying fitting & fixing of steel doors, windows,grill & grill gate including cost conveyance and taxes of all materials, cost of all labour,T&P required for the work etc. complete as per the direction of Engineer in Charge.
First Floor
Second Floor
Painting two coats in all floors to new wood and iron work over a coat of primer including sand papering,polishing the surface,including cost conveyance taxes of all materials,cost of all labour, T&P required for the work including cost of paint & primer etc complete as per the direction of Engineer in Charge.
First Floor
Second Floor
Distempering two coats over a coat of primer of approved shade including cost conveyance taxes of distemper and cost of all labour with T&P required for the work etc.complete as per direction of Engineer in charge.
First Floor
Second Floor
Wall painting two coats with any approved quality of Weather seal coat over a coat of primer to give an even shade including cost of all materials,labour, T&p required for the work complete.
First Floor
Second Floor
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_571000.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_571000.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid