Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | ₹37.4 L Quoted ₹31.7 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹34.1 L+₹2.4 L (7.56%)Rejected-Finance | ₹34.1 L+₹2.4 L (7.56%) | L2 | Rejected-Finance As per Approved TCR |
| 3 | L3₹38.5 L+₹6.8 L (21.4%)Rejected-Finance AT KASHMIR COLONY KURPANIA PO SUNDAY BAZAR DISTT BOKARO JHARKHAND 829127 | BOKARO | JHARKHAND | 829127 | ₹38.5 L+₹6.8 L (21.4%) | L3 | Rejected-Finance As per Approved TCR |
| 4 | L4₹43.6 L+₹12.0 L (37.7%)Rejected-Finance | ₹43.6 L+₹12.0 L (37.7%) | L4 | Rejected-Finance As per Approved TCR |
| 5 | L5₹44.1 L+₹12.4 L (39.3%)Rejected-Finance | ₹44.1 L+₹12.4 L (39.3%) | L5 | Rejected-Finance As per Approved TCR |
Tender Value
₹71.3 L
EMD Value
₹89,200
Closing Date
28 May 2026, 4:00 pmClosed
Staff Officer (Civil), BnK Area
Staff Officer (Civil), BnK Area, Kargali P.O.-BERMO, DIST.-BOKARO (JHARKHAND)-829104
Shifting of WB-02, entry and exit check post cabin with toilet facilities under AKK OCP of BnK Area
2026_CCL_359541_1
SO(C)/BnK/E -Tender/26-27/04/30
Open Tender
Civil Works - Others
Percentage
150 days
AKKOCP
As per NIT
5 documents required · 5 mandatory
₹89,200
25 Aug 2026
13 May 2026
29 May 2026
14 May 2026
28 May 2026
14 May 2026
14 May 2026 - 22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part (A) Foundaction: Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | - | cum | 139.7 | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | 1,438.1 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 6,773.95 | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 8,343.45 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 9,466 | ₹9,456.53 |
| 6 | Thermo-Mechanically Treated bars of grade Fe-500D or more.1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 105.6 | ₹105.49 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | 277.9 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | 562.72 | - |
| 9 | Part(B) PARAPIT WALL : Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | - | cum | 139.7 | - |
| 10 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | 1,438.1 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_372410.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .