| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.0 LAccepted-Finance | ₹46.0 L | L1 | Accepted-Finance Fulfilled the eligibility criteria |
| 2 | L1₹46.0 LAccepted-Finance | ₹46.0 L | L1 | Accepted-Finance Fulfilled the eligibility criteria |
| 3 | L1₹46.0 LAccepted-Finance DHAURAPALI RAJKISHORENAGAR KISHORENAGAR ANGUL ODISHA | ANUGUL | ODISHA | 759126 | ₹46.0 L | L1 | Accepted-Finance Fulfilled the eligibility criteria |
| 4 | L1₹46.0 LAccepted-Finance | ₹46.0 L | L1 | Accepted-Finance Fulfilled the eligibility criteria |
| 5 | L1₹46.0 LAccepted-Finance | ₹46.0 L | L1 | Accepted-Finance Fulfilled the eligibility criteria |
Tender Value
₹46.0 L
EMD Value
₹46,008
Closing Date
4 May 2026, 5:30 pmClosed
SE, M.I.DIVISION, SAMBALPUR
At Motijharan PO B.S.S.Nagar Dist Sambalpur PIN 768001
Improvement to Headworks of Balam MIP (Diversion Weir) in Naktideul Block of Sambalpur District under Improvement to Diversion Weir scheme for 2026-27.
2026_CEMIB_128417_1
SE,MID,SBP/02/2026-27
Open Tender
Civil Works - Others
120 days
Sambalpur
ScanCopy of Licence,GST PAN,BidCost,EMD,Afidavit,NoRelation other as per DTCN
2 documents required · 2 mandatory
₹6,000
₹46,008
Yes
19 May 2026
24 Apr 2026
5 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation loading , unloading and carriage by mechanical means,of all kinds of soil including stoney earth, gravel , and moorum etc.inter spread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing excavated materials away from work site as per the specification and as directed by engineer in charge with an initial lead of 1. 0 km from the place of excavation etc complete as directed by the Engineer-in-charge. (Measurement is to be taken on finished level section) | - | Cum | - | - |
| 2 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debries within the 50 m lead as directed by the Engineer-in-charge. | - | Cum | - | - |
| 3 | Excavation of foundation in all kind of soil with all leads and lifts including dressing and levelling the bed to proper slope and level making it fit for laying concrete including depositing the excavated materials clear of work site with all leads and lifts and delifts including labour, T&P materials required for the item complete as directed by the Engineer-in-charge. | 1 | Cum | - | - |
| 4 | Filling foundation & plinth with supplying and spreading sand including quarrying, collecting, conveying, supplying with watering including cost, conveyance, royalties & other taxes of all materials and labour etc. complete as per direction of Engineer-in-charge. | - | Cum | - | - |
| 5 | C.C- M15 grade with 20mm size and down graded of crusher broken granite chips of approved quality quarried and free from weathered skin including lifting the materials ,lowering, hoisting and laying the concrete for required level with curing ramming finishing etc complete in all respect to proper slope and level with cost conveyance , royalty and other taxes of all materials etc complete including dewatering as and when neccssary as directed by Engineer in charge . | 1 | Cum | - | - |
| 6 | Reinforced C.C- M20 grade with 20mm size and down graded of crusher broken granite chips of approved quality quarried and free from weathered skin including lifting the materials ,lowering, hoisting and laying the concrete for required level with curing ramming finishing etc complete in all respect to proper slope and level with cost conveyance , royalty and other taxes of all materials etc complete including dewatering as and when neccssary as directed by Engineer in charge . | - | Cum | - | - |
| 7 | Straightening, cutting, bending and binding of uncoated HYSD rod for concrete works and tying the grills and placing in position for fabrication and fixing of reinforcement and lapping where necessary and all labour and T&P required for the work including supply of binding wire with all leads, lifts from bending yard to placement spot including cost of steel bar of any reinforcement complete as directed by the Engineer-in-charge. | 1 | Qntl | - | - |
| 8 | Providing rigid and smooth centering and shuttering for R.C.C. and concrete work in Foundation and Plinth including cost, conveyance, all taxes materials labour charges including dismantling the same after required period etc. complete in all respect as directed by the Engineer-in-charge. | 1 | Sqm | - | - |
| 9 | Rough stone dry packing in approns and revetments to all height with hard broken stone of 15cm to 30 cm weighting 140 lbs/ cft of approved quality,quarried and free from weathered skin to proper slope and level including packing the interstices with small broken stones incliuding cost, conveyance, royalty and other taxes of all materials required for the work to proper slope and level etc with supply of all labour & T&P required for the work complete in all respect as directed by the Engineer -in- charge | 1 | Cum | - | - |
| 10 | 20 mm thick cement plaster (1:6) finished smooth to outside smooth surface of stone masonry after raking out the joints including watering and curing with cost with cost, conveyance, royalties and taxes of all materials with all labour, T&P required for the work etc. complete as directed by the Engineer-in-charge. | - | Sqm | - | - |
stage.html
html • 0.16 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
DTCN02.pdf
Tender Documents • 10.28 MB
BOQ_588575.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid