Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | ₹3.7 L Quoted ₹3.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.6 L+₹1.6 L (41.2%)Rejected-AOC | ₹5.6 L+₹1.6 L (41.2%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SMU ENTERPRISES L1 | K.THANGAMANI CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for cutting and removing the existing damaged and wornout hot air duct supports in unit-I mills 1A to 1F and devolution to stores as scrap including cost of cutting gas, T&P hire charges and transporting charges. | 1.5 | Tons | 63,900 ₹75,402 Lowest | 97,500 ₹1,15,050 |
| 2.00 | Charges for transportation of required size channels, pipes and M.S plate, fabrication of channel into box type and erection of wornout hot air duct support with stiffeners of mills 1A to 1F, providing support for seal air lines in 1C & 1D at '0' mtr including charges for transporting cost of consumables like cutting gas, welding electrodes and hire charges for T&Ps. | 2.29 | Tons | 1,27,731.5 ₹1,50,723.17 Lowest | 1,71,375 ₹2,02,222.5 |
| 3.00 | Charges for painting of newly erected hot air duct support 24 nos and seal air line support 2 nos with one coat of red oxide primer and two coat of gray enamel paint including cost of paint & consumables. | 55 | Sq.M | 13,200 ₹15,576 Lowest | 16,500 ₹19,470 |
| 4.00 | Charges for filling with RCC using cement with 12 mm machine crushed HBG and curing the bed of hot air duct supports 24 nos and seal air lines support 2 nos at '0' mtr etc., including cost of consumables and hire charges for T & Ps etc., | 3.66 | Cubic M | 38,388 ₹45,297.84 Lowest | 54,840 ₹64,711.2 |
| 5.00 | Cost of materials (Contractors Scope) MS channel of size 200 x 75 x 5 mm | 1.42 | Tons | 72,278 ₹85,288.04 Lowest | 1,06,500 ₹1,25,670 |
| 6.00 | Cost of materials (Contractors Scope) 100 NB MS ERW pipe as per IS 1239/3589 114.30 mm OD, Wall thick 5.4mm | 30 | M | 49,500 ₹58,410 Lowest | 75,000 ₹88,500 |
| 7.00 | Cost of materials (Contractors Scope) 12 mm Thick MS Plate | 0.38 | Ton | 28,500 ₹33,630 Lowest | 33,820 ₹39,907.6 |
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
8 Sept 2026, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle Revenue MPM I Unit I Renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 1A to 1F and providing supports for seal air fan discharge lines of 1C and1D at
2026_EB_699941_1
CE/SE/O/TTPS/Spec.No97/26-27
Open Tender
Miscellaneous Works
Works
25 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,200
Yes
23 Sept 2026
1 Sept 2026
9 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for cutting and removing the existing damaged and wornout hot air duct supports in unit-I mills 1A to 1F and devolution to stores as scrap including cost of cutting gas, T&P hire charges and transporting charges. | 1.5 | Tons | - | - |
| 2 | Charges for transportation of required size channels, pipes and M.S plate, fabrication of channel into box type and erection of wornout hot air duct support with stiffeners of mills 1A to 1F, providing support for seal air lines in 1C & 1D at '0' mtr including charges for transporting cost of consumables like cutting gas, welding electrodes and hire charges for T&Ps. | 2.29 | Tons | - | - |
| 3 | Charges for painting of newly erected hot air duct support 24 nos and seal air line support 2 nos with one coat of red oxide primer and two coat of gray enamel paint including cost of paint & consumables. | 55 | Sq.M | - | - |
| 4 | Charges for filling with RCC using cement with 12 mm machine crushed HBG and curing the bed of hot air duct supports 24 nos and seal air lines support 2 nos at '0' mtr etc., including cost of consumables and hire charges for T & Ps etc., | 3.66 | Cubic M | - | - |
| 5 | Cost of materials (Contractors Scope) MS channel of size 200 x 75 x 5 mm | 1.42 | Tons | - | - |
| 6 | Cost of materials (Contractors Scope) 100 NB MS ERW pipe as per IS 1239/3589 114.30 mm OD, Wall thick 5.4mm | 30 | M | - | - |
| 7 | Cost of materials (Contractors Scope) 12 mm Thick MS Plate | 0.38 | Ton | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_841380.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .