Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.4 LAccepted-AOC BOALIA PO GARIA 700084 | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹35.4 L | L1 | Accepted-AOC QUOTED LOWEST |
| 2 | L2₹35.8 L+₹35,410.34 (1.00%)Rejected-Finance | ₹35.8 L+₹35,410.34 (1.00%) | L2 | Rejected-Finance QUOTED SECOND LOWEST |
| 3 | L3₹36.1 L+₹70,820.68 (2.00%)Rejected-Finance | ₹36.1 L+₹70,820.68 (2.00%) | L3 | Rejected-Finance QUOTED THIRD LOWEST |
Tender Value
₹35.4 L
EMD Value
₹70,821
Closing Date
17 Mar 2026, 9:00 amClosed
EXECUTIVE ENGINEER
KURSEONG IRRIGATION DIVISION
REPAIR AND RENOVATION OF COMMUNITY HALL AT DHOBI JHORA FOREST VILLAGE WARD NO 1 IN P.S. KURSEONG
2026_GTA_1017681_11
GTA/EE/KSID/NIeT-12/2025-26
Open Tender
CIVIL WORKS
Percentage
180 days
KURSEONG
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹70,821
18 Sept 2026
3 Mar 2026
19 Mar 2026
3 Mar 2026
17 Mar 2026
3 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding, laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.5 m | 155.29 | Cum | 119.27 | ₹18,521.44 |
| 2 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 176.75 | Sqm | 64 | ₹11,312 |
| 3 | Supply of local hard stone/boulder material delivered and stack within a lead of 150 m from source | 26.53 | Cum | 325.3 | ₹8,630.21 |
| 4 | Carriage of Brick-bats, Boulder, Stone metal, Stone chips, Gravel, Slag metal, Shingle and similar miscellaneous materials over pucca road. | 26.51 | Cum | 185 | ₹4,904.91 |
| 5 | (I) Cement concrete with graded stone ballast (30 mm size excluding shuttering)
In ground floor with NB variety stone metal a) (1:3:6) proportion | 23.99 | Cum | 5,529.6 | ₹1,32,644.04 |
| 6 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) | 31.06 | Cum | 77.54 | ₹2,408.24 |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. | 26.71 | Cum | 6,370.8 | ₹1,70,164.07 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor upto 4 mt. | 2.73 | MT | 79,822.8 | ₹2,17,596.95 |
| 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25mm to 30 mm thick wooden shuttering as per discussion and direction of Engineer-in-charge. | 324.99 | Sqm | 400.8 | ₹1,30,255.99 |
| 10 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor | 230.88 | Sqm | 1,038 | ₹2,39,648.25 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 0.12 MB
BOQ_2500543.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .