Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
12 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintenging Engineer
EDC AYODHYA
Construction of Line and Installation of 25 KVA Transformer at Village Babuwapur Block Maya Bazar, Ayodhya Under Electricity Distribution Division IInd, Ayodhya
2020_MVVNL_518012_1
83 H(F)(W)/2020-21
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
AS PER TENDER SPECIFICATION
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹2,000
29 Oct 2020
6 Oct 2020
13 Oct 2020
6 Oct 2020
12 Oct 2020
6 Oct 2020
180 days
Amount
Carriage including loading, unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 40 Kms. (distance approx)
PCC Pole 8.5 Mtr. Long
AB Cable 3x50
ACSR Weasel Conductor
Transformer 25 KVA
Other matching Materials
Dragging of PCC Pole from dump site to pit site
Fabrication and Errection of Single Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Double Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Earthing of Poles as per RESPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Stringing, Sagging, binding and jumpering of AB Cable 3x50 as per RESSPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
M/S BALAJI ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .