| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -30.00% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.8 L+₹3,994.85 (1.43%)Admitted-Fee/PreQual/Technical/Finance | -29.00% | ₹2.8 L+₹3,994.85 (1.43%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹2.8 L+₹3,994.85 (1.43%)Admitted-Fee/PreQual/Technical/Finance | -29.00% | ₹2.8 L+₹3,994.85 (1.43%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹3.0 L+₹19,974.27 (7.14%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹3.0 L+₹19,974.27 (7.14%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-CDR is older then tender publishing date |
Tender Value
₹4.0 L
EMD Value
₹7,980
Closing Date
25 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of Foot Bridge at Jabba Mohalla in Panchayat Dewal B Block GulabgarhPytDewal B Block GulabgarhDewal B
2026_RDPR_321172_1
e-NIT No. 107 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
120 days
REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
MH 0515
₹7,980
Yes
2 Sept 2026
17 Aug 2026
26 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil | 16.31 | cum | 592.5 | ₹9,663.68 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including all leads, lift and carriage complete | 1.81 | cum | 4,826.5 | ₹8,735.97 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 18.69 | Cum | 4,775 | ₹89,244.75 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all leads, lift and carriage complete | 6.21 | Cum | 9,821.85 | ₹60,993.69 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete including all leads, lift and carriage complete | 621.5 | kg | 123.2 | ₹76,568.8 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 60.22 | sqm | 286.35 | ₹17,244 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: 2 Walls (any thickness) attached pilasters, buttresses, plinth and string courses etc. | 27.88 | sqm | 628.95 | ₹17,535.13 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for ; Suspended floors, roofs, landings, balconies and access platforms. including all leads, lift and carriage complete | 11.62 | sqm | 718.2 | ₹8,345.48 |
| 9 | Edges of slabs and breaks in floors and walls under 20 cm including all leads, lift and carriage complete | 16.54 | meter | 262.2 | ₹4,336.79 |
| 10 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge | 1 | No. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
finance_1071483.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1071483.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .