Tender Value
₹67.7 L
EMD Value
₹1.4 L
Closing Date
21 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
WORKS
16 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As detailed in Para 10.2 of Tender Form (Second sheet) of Part 1 of attached GCC-2022.
The tenderer shall submit certificates regarding status of firm i.e. sole proprietorship, partnership, Company, Society/Trust etc. and should submit supporting documents e.g. notarized affidavit, MOA/AOA, Certificate of Incorporation, Partnership deed, power of attorney etc. (as applicable) to comply Para no. 10, 14, 15, 16 & 18 of Tender Form (Second Sheet) of Part I of attached GCC-2022.
The contractor should have a valid Electrical contractor license issued by Govt. and submit along with tender documents. If tenderer fails to submit a valid electrical contractor license, then offer from the tenderer will be summarily rejected.
13 conditions
Tender document and all the uploaded supporting documents must be digitally signed by the authorized signatory for tender, in token of their acceptance.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Outsourcing of maintenance of OHE power block activities under FPS OHE cum PSI depot and others depot over Jaipur Division for a period of 2 years.
EL-TRD-JP-2025-26-14
EL-TRD-JP-2025-26-14
Open
Works - General
24 Months
Jaipur, Rajasthan
₹0
₹1.4 L
21 Apr 2026
27 Mar 2026
7 Apr 2026
31 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 67,71,981 | ||
| — | 2270.00 | — | — | ||
| Checking & Maintenance of Cantilever assembly. | — | — | — | 20,80,273.4 | |
| — | 164.00 | — | — | ||
| Checking & Maintenance of 25kV OHE Conductors. | — | — | — | 10,56,681.52 | |
| — | 192.00 | — | — | ||
| Checking & Maintenance of Overlaps (IOL) &(UIOL). | — | — | — | 3,86,576.64 | |
| — | 136.00 | — | — | ||
| Checking & Maintenance of Anti creep arrangement | — | — | — | 2,05,062.16 | |
| — | 36.00 | — | — | ||
| Checking & Maintenance of 25kV Isolator (SP/DP) including Earthing heel arrangement if any | — | — | — | 80,406 | |
| — | 46.00 | — | — | ||
| Checking & Maintenance of 25kV OHE at Turnouts | — | — | — | 78,652.18 | |
| — | 22.00 | — | — | ||
| Checking & Maintenance of Section Insulator Assembly | — | — | — | 40,496.5 | |
| — | 310.00 | — | — | ||
| Checking & Maintenance of Auto Tensioning Device (ATD) | — | — | — | 11,54,207.5 | |
| — | 9000.00 | — | — | ||
| Checking & Maintenance of Feeder wire &Feeder Termination/Fixed Anchor Termination | — | — | — | 1,09,980 | |
| — | 8.00 | — | — | ||
| Checking and maintenance of PTFE type Neutral section | — | — | — | 56,050.8 | |
| — | 250.00 | — | — | ||
| Removal of Bird Nest and other foreign body from 25 kV OHE | — | — | — | 76,600 | |
| — | 10.00 | — | — | ||
| OHE slewing, re-slewing work for 3 spans and ATD locking, unlocking work for 2 ATDs for single line OHE (Rates are incl. of work under power block). Work includes securing /holding OHE till completion of work (RUB/Girder launching etc.) | — | — | — | 6,97,824.7 | |
| — | 10.00 | — | — | ||
| Erection of catenary wire splicing | — | — | — | 26,984.8 | |
| — | 10.00 | — | — | ||
| Erection of contact wire splicing | — | — | — | 26,984.8 | |
| — | 8000.00 | — | — | ||
| Cleaning of all types of insulators | — | — | — | 6,95,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Special Condition of Contract
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
CorrectionSlipsupto11-GCCApr2022.pdf
ATTACHMENT
2026-02-25SpecialConditionofContractFPSDepot.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .