| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.6 LRejected-AOC | ₹2.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Sabareesan L2 | Selva Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting Of CC Roads with an initial lead of 10m and initial lift of 2m complete and as directed by , Officers. | 2 | M3 | 1,305 ₹2,610 | 1,302 ₹2,604 |
| 2.00Earth work excavation and depositing on bank with an initial lead of 10m and initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murrams, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil -SS20B | |||||
| 2.01 | First depth of 2 m | 29 | M3 | 88 ₹2,552 | 86.5 ₹2,508.50 |
| 2.02 | Second depth of 2 m | 44 | M3 | 140 ₹6,160 | 137.25 ₹6,039 |
| 3.00 | Supply and filling the foundatiion and basement with clear M sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by , Officers. | 3 | M3 | 2,165 ₹6,495 | 2,162 ₹6,486 |
| 4.00 | P.C.C 1:4:8 (one cement, four sand and eight coarse aggregate) using S.R. cement and 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the , Officers. | 3 | M3 | 5,960 ₹17,880 | 5,946 ₹17,838 |
| 5.00 | Shoring, and strutting with sheet piles of size width 400 mm x height of 3m x thickness of 9mm as per IS 2314-1986 by driving on both sides of the trench from Ground Level up to the required depth and connecting the above sheet piles by horizontal strutting with sheet piles at an interval of 1.0m, fixing the sheet piles by connecting the horizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50m interval and including removing the sheet piles after the pipelines are laid, jointed, tested, and stacking it safely for other uses. It includes the cost of sheet piles and casurina poles including labour charges for erecting the sheet piles, driving the sheet piles, removing the sheet piles, fixing Casurina poles, etc., complete and all other incidental charges for the depths, - 0-4mts. | 24 | RM | 4,085 ₹98,040 | 4,076 ₹97,824 |
| 6.00 | Barricading work (Where the lines are in narrow width of municipality area, busy streets like Market, Bus-stand and in the Highways etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia. and 1.80m height) vertical with horizontal poles in two rows, painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including supplying, delivery and fixing of GI sheet (0.90m x 0.8mm thick) in the horizontal poles and fixing 75mm dia. reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by Dept officers. | 24 | RM | 101 ₹2,424 | 99.8 ₹2,395.20 |
| 7.00 | Supply and Delivery of DWC Structured Wall Polyethylene Piping Systems (Pipe with online/offline coupler and elastomeric sealing ring) with required specials non-smooth external annular corrugated and smooth internal surface (Double wall) (SN 8 Class) for non-pressure underground sewerage, drainage application generally as per IS-16098 (Part-2) type B. | 12 | RM | 468 ₹5,616 | 465 ₹5,580 |
| 8.00Lowering RCC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste. | |||||
Tender Value
₹2.7 L
EMD Value
₹2,700
Closing Date
6 Nov 2025, 3:00 pmClosed
COMMISSIONER KUMBAKONAM CITY MUNICIPAL CORPORATION
COMMISSIONER KUMBAKONAM CITY MUNICIPAL CORPORATION
Relaying of existing damaged sewer pipeline at kuyavan street and repairing Steel Bridge ward no 6 in Kumbakonam City Municipal Corporation
2025_MAWS_619650_1
12150/2025/E2
Open Tender
Civil Works
180 days
kumbakonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,700
Yes
18 Mar 2026
3 Nov 2025
6 Nov 2025
3 Nov 2025
6 Nov 2025
3 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_740824.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_740824.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid