| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAccepted-AOC UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹36.0 L Quoted ₹36.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹36.6 L+₹1,097.18 (0.03%)Rejected-Finance | ₹36.6 L+₹1,097.18 (0.03%) | L2 | Rejected-Finance REJECTED BEING HIGHER RATES. |
Tender Value
₹37.5 L
EMD Value
₹3.8 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
Construction of a new link road from Mehndighat Sandila Bhatpur Road (Bypass) to NH-731
2026_CEUCZ_1123159_4
1012/M/1MT/E-TENDER/UC/2026 DT 28.02.2026
Open Tender
Civil Works - Roads
Percentage
180 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹3.8 L
Yes
17 Jul 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (SOR-253) (Rates are Including Labour Cess but Excluding GST) | 2,100 | Cum | 95 | ₹1,99,500 |
| 2 | Excavation in soil using hydraulic excavator and tipper with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tipper, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-section and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3. (Rates are Including Labour Cess but Excluding GST) | 87 | Cum | 35 | ₹3,045 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. (Rates are Including Labour Cess but Excluding GST) | 105 | Cum | 3,723 | ₹3,90,915 |
| 4 | Providing, laying, spreading and compacting stone aggregates of 63-45 mm specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Rates are Including Labour Cess but Excluding GST) | 214 | Cum | 4,338 | ₹9,28,332 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Rates are Including Labour Cess but Excluding GST) | 214 | Cum | 4,370 | ₹9,35,180 |
| 6 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits availble land with all lifts and leads, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specitaion Clause 303.1 (Rates are Including Labour Cess but Excluding GST) | 305 | Cum | 91 | ₹27,755 |
| 7 | Brick edging on both side of the road of 1st Class brick 8 cm. (3") wide and 12 cm. (41/2") deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing & ramming the excavated earth including all labour, T&P sudries required for proper completion of work with material. (Rates are Including Labour Cess but Excluding GST) | - | Km | 88,000 | - |
| 8 | Providing and applying primer coat with EMULSION on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 (Rates are Including Labour Cess but Excluding GST) | 2,853.75 | Sqm | 38 | ₹1,08,442.5 |
| 9 | Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Rates are Including Labour Cess but Excluding GST) | 2,853.75 | Sqm | 16 | ₹45,660 |
| 10 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. (Rates are Including Labour Cess but Excluding GST) | 2,853.75 | Sqm | 180 | ₹5,13,675 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
T2ETENDER.pdf
Tender Documents • 0.47 MB
BOQ_2092100.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .